Profitti għas-settur privat, riskji u kontijiet għall Gvern!

Nhar it-Tnejn li għadda l-Parlament iddiskuta s-sentenza mogħtija mill-Imħallef Francesco Depasquale fuq il-konċessjoni dwar tlett isptarijiet tal-Gvern lill-Vitals Global Healthcare liema konċessjoni eventwalment għaddiet għand Steward Health Care. Id-deċiżjoni li ngħatat hi kontra l-Prim Ministru bħala kap tal-Eżekuttiv, kif ukoll kontra l-Avukat Ġenerali, kumpaniji diversi mill-grupp kummerċjali ta’ Steward Health Care u xi korpi pubbliċi u r-rappresentanti tagħhom.

Din hi kawża li ppreżenta Adrian Delia meta kien għadu Kap tal-Opposizzjoni. Il-parti kbira tad-diskussjoni parlamentari dwar din is-sentenza iffukat fuq nuqqas ta’ governanza tajba, dwar tmexija ħażina u dwar frodi flimkien mal- korruzzjoni, assoċjati ma’ din il-konċessjoni sa mit-tnissil tagħha.

Dan kollu joħroġ ċar mis-sentenza tal-Qorti tal-ġimgħa l-oħra. Imma għal min kien attent, dan kien diġa jidher ċar fiż-żewġ rapporti dwar din il-konċessjoni tal-isptarijiet, rapporti li ħareġ l-Awditur Ġenerali f’Lulju 2020 u f’Diċembru 2021. Is-sentenza tal-Qorti qed issaħħaħ u tirrinforza l-konklużjonijiet li wasal għalihom l-Awditur Ġenerali.

Niftakru li f’Lulju 2020 l-Awditur Ġenerali kien ippubblika l-ewwel rapport tiegħu, rapport li hu mifrux fuq iktar minn 200 paġna u li kien jiffoka fuq il-proċess tal-offerti għall-konċessjoni dwar l-isptarijiet. Dan kien supplimentat b’addendum ta’ 20 paġna oħra. Iktar tard f’Diċembru 2021 l-Awditur Ġenerali kien ippubblika it-tieni rapport tiegħu b’467 paġna, li kien jiffoka fuq il-qafas kuntrattwali tal-konċessjoni u kif dan ġie mħaddem.

L-Awditur Ġenerali kien ikkonkluda fir-rapporti tiegħu li l-preparazzjoni li wettaq il-Gvern in konnessjoni mal-konċessjoni kienet waħda superfiċjali, u li meta ħareġ is-sejħa għall-offerti kien fil-fatt diġa ftiehem u fuq kollox lill-Kabinett bosta drabi kien iħallieh fil-għama. Anke l-Ministru tal-Finanzi kien imwarrab, qiesu kien qiegħed hemm għalxejn!

Punt interessati li isemmi l-Awditur Ġenerali hu li Vitals Global Healthcare ippreżentaw garanzija bankarja mill-Bank of India li kienet datata 13 ta’ Marzu 2015, ħmistax-il ġurnata qabel ma fil-fatt ħarġet is-sejħa għall-offerti. Dan sar għax il-ftehim kien diġa sar u s-sejħa li ħarġet għall-offerti kienet waħda finta! A bażi ta’ dan, l-Awditur Ġenerali kien tal-fehma li Vitals Global Healthcare kellhom ikunu skwalifikati milli jippartiċipaw fis-sejħa għall-offert għall-konċessjoni dwar l-isptarijiet.

Dan hu kollu importanti u separatament wassal għal konklużjonijiet li issa wasal għalihom ukoll l-Imħallef Depasquale fis-sentenza li qed nitkellmu dwarha. Ifisser li Gvern serju, kieku ried, seta jaġixxi. Kellu biżżejjed informazzjoni biex jibgħat lil Steward Health Care isaqqu. Imma b’mod ċar dan ma setax jagħmlu għax il-Gvern kien parti integrali mill-ħadma li saret.

Imma hemm affarijiet oħra, daqstant importanti, ta’ natura fundamentali u li huma presentment skartati mid-diskussjoni pubblika. Kemm jagħmel sens li qasam sensittiv bħas-saħħa ikollu parti sostanzjali minnu taħt kontroll kważi assolut tas-settur privat. Jagħmel sens il-Public-Private Partnership fil-qasam tas-saħħa?

Din hi mistoqsija li hi kompletament skartata fid-dibattitu pubbliku li sar u li għadu għaddej. Hi mistoqsija fundamentali li mit-tweġiba għaliha tista’ toħroġ il-fasla ta’ kif is-settur privat jista’ jikkontribwixxi u jipparteċipa mingħajr ma jikkontrolla: kif kulħadd jitħallas ta’ xogħolu imma li ħadd ma jitħalla jberbaq il-ġid tal-pajjiż.

L-esperjenza li għandna f’dan il-pajjiz dwar l-involviment tas-settur privat f’dawn it-tip ta’ proġetti hi waħda ta’ problemi kbar: problema ta’ deċiżjonijiet ħziena u ta’ abbuż ta’ poter, kif ukoll suspetti kbar ta’ frodi u korruzzjoni. Dan b’referenza kemm għal din il-konċessjoni tal-isptarijiet, il-progett tal-enerġija f’Delimara u anke fil-progett ta’ San Vinċenz f’Ħal-Luqa. F’kull kaz hemm rapporti voluminużi tal-Awditur Ġenerali li jispjegaw dettaljatatment it-taħwid li ġie iġġenerat mill-Gvern immexxi mill-Partit Laburista wara l-2013.

Huwa mudell ekonomiku fallut li jarmi l-assi pubbliċi. Mudell li intuża ukoll f’ċirkustanzi oħra bħall-bejgħ tal-art f’Pembroke bir-ribass biex ikun iffavoreġġat il-proġett spekulattiv tal-Grupp dB.  Il-profitti li jirriżultaw mill-ispekulazzjoni, sfortunatament għandhom prijorità fuq il-ġid komuni għal dan il-Gvern.

Hu ċar li jekk irridu l-involviment tas-settur privat fi proġetti pubbliċi, dan l-involviment għandu jkun regolat sewwa u din ir-regolamentazzjoni għandha tkun infurzat biex tkun assigurata governanza tajba mill-bidu nett, mill-ewwel ideat sat-twettieq ta’ proġetti ta’ din ix-xorta.  S’issa kollox qiegħed jitħalla jimxi għal riħu bil-konsegwenzi li qed naraw b’għajnejna u li qed insiru nafu bihom ftit ftit. Nuqqas ta’ regoli ċari li jkunu infurzati jwassal inevitabilment għal taħwid, għal frodi u għal korruzzjoni. Riżultat ta’ hekk ibati l-pajjiz kollu.

ippubblikat fuq Illum: 5 ta’ Marzu 2023

Private profits public risks

On Monday Parliament discussed the decision delivered in Court by Judge Francesco Depasquale relative to the Government hospital concession awarded to Vitals Global Healthcare, eventually substituted by Steward Health Care. The decision delivered is against the Prime Minister as head of the Executive, as well as the Attorney General, various companies in the Steward Health Care Group and a number of quangos and their representatives.

This Court Case was presented by Adrian Delia when he was Leader of the Opposition. The major part of the Parliamentary discussion has focused on bad governance, fraud and corruption which were all associated with the hospital concession process since its inception.

All this emanates from the Court decision delivered last week. However, those who observe the political scene attentively would be undoubtedly aware that all this was already evident in two reports published by the Auditor General on this hospital concession: the first one published in July 2020 and the second one in December 2021. The Court’s decision, in fact, reinforces the Auditor General’s conclusions.

We do clearly remember that in July 2020 the Auditor General had published a first report running into over 200 pages focusing on the hospital concession tendering process. This was followed by an addendum and later, in December 2021 the Auditor General published a second report, 467 pages long, which reviewed the contractual framework of the hospital concession.

In his reports the Auditor General concluded that the preparatory work carried out by the public sector in relation to the hospital concession was very superficial. The Auditor General’s reports also identified that even before the request for proposals was published Government had already concluded on awarding Vitals Global Healthcare the hospitals concession! Cabinet and even the Finance Minister were generally kept in the dark. 

The Auditor General, in his investigations, found a bank guarantee presented by Vitals Global Healthcare. It was issued by the Bank of India on the 13 March 2015, a fortnight before the request for proposals was even published. This clearly established that the agreement was already sealed even before the public request for proposals had been published. The Auditor General had clearly identified this as a definite proof of collusion. On this basis, the Auditor General had in fact expressed a strongly worded opinion that Vitals Global Healthcare should have been disqualified from participating in the request for proposals relative to the hospitals’ concession.

All this is of paramount importance. Way back in 2020/21 it had led to the Auditor General conclusions which have now been confirmed by Mr Justice Depasquale in the decision delivered last week. This means that government should and could have acted then: it had sufficient information to send Steward Health Care packing. However very clearly it could not act as it was part and parcel of the deceit at hand.

There are however further matters, just as important as the above, which the current debate unfortunately avoids. We should ask: does it make sense for a sector as sensitive as health to be controlled in this manner by the private sector? Does a public-private partnership in the health sector make sense?

These questions are being ignored in the public debate currently at hand. These questions are of a fundamental nature as the replies thereto could identify the manner as to how the private sector can be involved without having a controlling interest and how all those involved can be fairly remunerated without squandering public funds.

The local accumulated experience resulting from this kind of projects is very problematic: we are continuously faced with incorrect decisions, abusive decision-taking as well as substantial suspicions of fraud and corruption. This is being stated with reference not just to this hospital concession but also to the energy deal at the Delimara Power Station and the project at the Luqa elderly residence: St Vincent de Paul. In each case the Auditor General has produced voluminous reports detailing the mayhem generated by the post 2013 Labour government.

It is a failed economic model which discounts public goods. It has also been applied in other sectors: a case in point being the Pembroke land “sold” at throwaway prices in favour of the speculative project of the dB Group. Speculative profit is unfortunately being continuously prioritised over the common good by the present government.

It is crystal clear that if we want the private sector involved in public projects its involvement must be regulated, and the said regulatory regime must be adequately enforced in order to ensure good governance throughout, from inception right through to implementation. So far it is a free for all: the consequences are for all to see.  A lack of clear rules and their enforcement inevitably leads to confusion, fraud and corruption. The whole country, as a result, has to pay the consequences.

published in The Malta Independent on Sunday : 5 March 2023

Fil-Parlament il-lejla: x’faqar!

Smajtuh id-dibattitu tal-lejla fil-Parlament dwar is-sentenza tal-Qorti tal-ġimgħa l-oħra?

X’faqar! X’mistħija ta’ Parlament!

Il-pajjiż jixraqlu ferm aħjar minn hekk!

It-taħwida hi kbira: flok “world class medical system” għandna kaz ta’ “world class fraud” li nħolqot minn Vitals Global Healthcare u Steward Health Care u mill-Gvern Laburista.

S’issa insterqu €300 miljun!

Għadu kmieni biex wieħed jgħid x’ser jiġri u dan sakemm jinqata’ l-appell, jekk ikun hemm.

Jinħtieġu tweġibiet diversi.

Meta ser jibdew l-investigazzjonijiet mill-Pulizija fil-konfront ta’ dawk involuti? Il-Pulizija sfortunatament mhemmx ħosshom! Fejn hu l-Kummissarju tal-Pulizija Angelo Gafà?

Robert Abela, Konrad Mizzi, Edward Scicluna, Chris Cardona, Keith Schembri u Joseph Muscat: meta ser jintalbu jwieġbu ta’ egħmilhom, jew tan-nuqqas tiegħu?

Il-membri tal-Kabinett immexxi minn Joseph Muscat: ħadd ma jaf xejn. Wieħed iwaħħal fl-ieħor. Kellna Ministru tal-Finanzi (Edward Scicluna) li ma kienx jaf x’inhu jigri fil-Ministeru tieghu!

Chris Fearne min-naħa l-oħra, ħlief għal xi botta, kien kawta ħafna! Hu imħasseb dwar x’inhu ġej!

Il-parti l-kbira tal-membri tal-Kabinett ta’ Joseph Muscat baqgħu fommhom magħluq. Ħlief Varist Bartolo, li bħas-soltu jibqa’ jdur mal-lewża.

Hemm responsabbiltà politika kbira. Hemm ukoll responsabbiltajiet kriminali. Min ser iwieġeb? S’issa ħadd ma wieġeb.

Robert Abela kien skomdu ħafna huwa u jipprova jwieġeb waqt is-seduta Parlamentari tal-lejla. Inevitabilment ħarab mis-sustanza tal-argument. Sa ċertu punt wieħed dan jifhmu għax il-konsegwenzi mhumiex żgħar u għandu bżonn iż-żmien.

Għad nispiċċaw li jkollna ninvestgaw kull kuntratt li ngħata minn dan il-Gvern. Ħadma, waħda wara l-oħra.

Din hi storja li għad trid tinkiteb fid-dettall. Fl-aħħar, kull min hu responsabbli jrid iħallas ta’ egħmilu.

Transport Malta: incompetence or collusion?

Throughout the past days the media has revealed a second-hand car racket as a result of which some of the used cars imported from Japan had their mileage meters tampered with. This in order to indicate that the cars were used much less than they actually were.

A considerable number of consumers have been duped into believing that they were making a deal when in reality they were victims of a fraud in which, inevitably, a number of persons were involved. Reports in the press have detailed the possible way in which the fraud was carried out. A specific garage and a printing press have been mentioned as possible accomplices in carrying out the resulting fraud.

At the time of writing two second-hand car dealers have been identified as being involved in this racket.

Second-hand cars exported from Japan are issued certification by the Japan Export Vehicle Inspection Centre (JEVIC). Such certification details information relative to the second-hand cars exported, which information includes the milage covered by the cars exported. The fraud involved both the physical tampering of the individual car dashboard meter as well as alterations to the accompanying documentation issued by JEVIC, if there is no foul play.

It is pertinent to enquire as to what checks were carried out by the regulator, Transport Malta, before carrying out the registration process of these imported second-hand cars. Apparently, no basic checking of the (falsified) documentation was carried out.

Accessing the JEVIC website reveals that Transport Malta requires odometer certification of passenger and goods vehicles by JEVIC prior to export. This information is also available online. Inputting the car chassis number and other relevant information about a second-hand car imported from Japan reveals electronically the certification details of the said second-hand car which details should correspond to the paper documentation issued by JEVIC.

A press release issue by Transport Malta on the 8 June, three days after the fraud was revealed by the media, advises consumers as to how to check if their second-hand car imported from Japan was tampered with. A seven-step instruction is available, ending with the following: if you have less mileage on your instrument cluster than on your JEVIC certificate, contact your car dealer for an explanation.

At this point in time, after the fraud has been revealed, there are many questions which require a clear answer. Topping the list of such questions is the manner in which Transport Malta carried out its regulatory duties when processing applications for the registering of second-hand cars imported from Japan. Apparently, no checks were carried out to verify the validity of the documentation submitted. If such a check was carried out it would have revealed the discrepancies which have now come to light and maybe some action would have been taken to protect consumers from this fraud.

Who was Transport Malta protecting with its silence?

Logical conclusions can be arrived at. One either concludes that the administrative setup at Transport Malta is incompetent or else that it is in collusion with the odometer tampering process. How is it possible to otherwise overlook such a basic check before proceeding to register imported second-hand cars? It is only now that, caught with its pants down, Transport Malta has published a seven-step instruction on how to check as to whether your imported car has been tampered with!

The Minister for Consumer Protection has exclaimed that these allegations shock “the system”. She even emphasised that there is zero tolerance for such fraudulent behaviour.

It would be much better if the Hon Minister ensures that authorities such as Transport Malta are run properly. At best, to date, those running the authority are downright incompetent, at worst in collusion. “The system” certainly needs to be shocked back on track, behaving normally against fraud and not facilitating it.

published in The Malta Independent on Sunday :12 June 2022

Keith Schembri u l-kaxxi vojta: frodi, korruzzjoni u ħasil ta’ flus

Mela Keith Schembri u 10 persuni oħra, kif ukoll għoxrin kumpanija ittellgħu l-Qorti ftit tal- ħin ilu. Huma akkużati bi frodi, korruzzjoni, ħasil ta’ flus u iktar.

Dan li qed iseħħ illum huwa prova li l-istituzzjonijiet ma ħadmux kif kellhom jaħdmu. Għax kellom ikunu l-kaxxi “vojta” ta’ Simon Busuttil, li wara li saret investigazzjoni dwarhom mill-Maġistrat wasslu għall-passi tal-lum.

Illum hu jum ta’ niket. Jum ta’ għajb.

Dak li kien “in-number one” ta’ Malta hu akkużat li hu maħmuġ. Miegħu hemm oħrajn fosthom persuna li l-Gvern kien appuntah bħala membru tal-Bord tal-Awtorità tal-Ippjanar (Matthew Pace) li kellu jirreżenja għax inqabad b’kunflitt ta’interess: waqt li kien qed jivvuta favur il-permess tal-proġett tad-dB f’Pembroke kien diġa qed ibiegħ l-appartamenti permezz tal-aġenzija tal-propjetà li kellu sehem fiha.

Jum tal-mistħija għax tal-lum hi biċċa prova li l-Gvern ta’ Malta kien immexxi mill-ħmieġ.

X’serjiġri minn issa l-quddiem diffiċli tgħid. Li l-affarijiet waslu sa hawn hu pass importanti għas saltna tad-dritt.

Min imiss?

Kemm ħasbuna ċwieċ ?

L-Uffiċċju Nazzjonali tal-Verifika għadu kif ikkonkluda investigazzjoni dwar iċ-Ċentru Interpretattiv f’Ħad-Dingli. L-investigazzjoni fittxet li tiddetermina jekk kienx hemm xi ftehim wara l-kwinti bejn uffiċjali pubbliċi diversi biex is-sit f’Ħad-Dingli jkun ittrasformat minn ċentru interpretattiv għal stabiliment tal-ikel.

L-investigazzjoni, kif spjegat f’rapport bl-Ingliż li ippubblika l-Uffiċċju Nazzjonali tal-Verifika ma sab l-ebda prova li tista’ tissostanzja allegazzjonijiet dwar frodi jew korruzzjoni. Hemm imma referenza għal dak li qed jissejjaħ “oversight”, jiġifieri żball. Ċentrali fl-iżvilupp ta’ dan l-iżball insibu l-awtoritá li tieħu ħsieb l-ippjanar dwar l-użu tal-art. Dakinnhar MEPA, illum PA.

Meta l-Kunsill Lokali ta’ Ħad-Dingli issottometta l-applikazzjoni bażika (dik li nirreferu għaliha bħala outline development permission) (applikazzjoni PA5314/02) il-kunsill kien qed jitlob li jingħata permess għal żona fejn iservu l-ikel (id-dokumenti jirreferu għal catering area). Ir-rapport tal-Uffiċċju tal-Verifika jagħmel referenza għal dokumenti tal-MEPA biex juri li l-Kunsill Lokali ta’ Ħad-Dingli kien qed jintalab jirrevedi l-proposta tiegħu, u b’mod partikolari biex ineħħi mill-pjanti kull referenza għal żona fejn iservu l-ikel. Dan it-tibdil, jemfasizza ir-rapport “included the elimination of catering services”. Biex l-affarijiet ikunu ċari ħafna, l-MEPA insistiet biex tkun emendata ukoll il-proposta ta’ żvilupp innifisha.

Il-proposta oriġinali ta’ żvilupp li ippreżenta l-Kunsill Lokali kienet dwar twaqqiegħ ta’ żewġ binjiet eżistenti u l-bini minflok ta’ binja ta’ tlett sulari b’diżinn modern b’qies ikbar minn dak tal-bini eżistenti. Il-pjanti jipprovdu għal kċina żgħira u żona mdaqqsa fejn joqgħodu bil-qegħda n-nies.

Il-MEPA insistiet, u l-Kunsill Lokali ta’ Ħad-Dingli aċċetta, li l-proposta ta’ żvilupp kellha tkun emendat biex tikkonċerna r-restawr tal-binjiet eżistenti flmkien ma alterazzjonijiet u żidiet għalihom biex ikunu mibdula f’ċentru interpretattiv. Il-bejgħ ta’ ikel u xorb fuq is-sit kellu jkun limitat għal dak li seta jsir bil-magni (vending machines).

Iktar tard il-Kunsill Lokali ta’ Ħad-Dingli ippreżenta applikazzjoni dettaljata (full development permission) li kienet approvata mill-MEPA. Din l-applikazzjoni approvata (PA0425/08), jgħidilna r-rapport tal-Uffiċċju tal-Verifika, “ippermetta li ikel u xorb setgħu jinxtraw miċ-ċentru interpretattiv bħala attivitá anċillari (allowed food and drink to be served at the Interpretation Centre as an ancillary activity). Dan minkejja li dan kollu kien ipprojibit mill-permess bażiku li kien approvat iktar qabel, meta kienu ġew stabiliti l-parametri bażiċi tal-proġett.

Ir-rapport tal-Uffiċċju tal-Verifika jgħidilna li meta l-investigaturi għarblu liċ-Ċhairperson tal-Kummissjoni għall-Kontroll tal-Iżvilupp fuq il-każ, din qaltilhom li d-diskrepanza kienet żball u li hi kellha l-impressjoni li l-permess approvat kien jirrifletti d-diskussjoni li saret fil-bord u allura kien jipprojibixxi li jkun possibli li sservi l-ikel fis-sit (this variance as an oversight, and that she was under the impression that the permit issued reflected the Board’s discussion, and therefore excluded catering on site).

Il-kelma li tintuża hi “oversight”, liema kelma tfisser “żball li jsir bi żvista għax tkun qabżitlek xi ħaġa”.

Meta fittixt fid-dokumentazzjoni tal-MEPA sibt li mill-minuti tal-laqgħat tal-Kummissjoni għall-Kontroll tal-Iżvilupp ma tantx jidher li qabeż xejn biex sar dan “l-iżball”. Fil-fatt il-minuti tat-18 ta’ Marzu 2009 speċifikament jgħidu li l-Kummissjoni kellha l-intenzjoni li tirrifjuta l-applikazzjoni minħabba li dak propost dwar il-“catering facilities” (jiġifieri l-użu magħruf bħala Class 6 use) ma kienux approvati fl-ewwel permess.

Fid-dokument tal-MEPA li nirreferu għalih bħala DPAR (Development Permit Application report) fit-taqsima tiegħu intitolata “Notes to Committee” hemm miktub li l-perit tal-Kunsill Lokali rinfaċċjat b’dan ippreżenta pjanti mibdula li fihom il-faċilitajiet għall-catering tneħħew.

F’laqgħat li saru iktar tard mill-Kummissjoni għall-Kontroll tal-Iżvilupp, din l-intenzjoni tal-Kummissjoni inbidlet u l-applikazzjoni bil-faċilitajiet tal-catering b’kollox kienet approvata nhar l-20 ta’ Jannar 2010.

Dan tista’ issejjaħlu kollox minbarra “żball”. Kienu jafu x’inhuma jagħmlu.

Ir-rapport tal-Uffiċċju Nazzjonali tal-Verifika jgħidilna li “Din l-investigazzjoni tinnota li bejn it-18 ta’ Marzu 2009 u l- 10 ta’ Marzu 2010, il-MEPA bidlet il-posizzjoni tagħha minn waħda li teskludi l-faċilitajiet li jipprovdu għat-tisjir tal-ikel (Class 6 facilities) għal waħda li tippermettihom bħala faċilitá anċillari.” Flok mill-bieb daħlu mit-tieqa.

Il-mistoqsija bażika hi waħda sempliċi ħafna: x’ġara bejn it-18 ta’ Marzu 2009 u l-10 ta’ Marzu 2010 biex wassal lill-Kummissjoni biex tibdel il-fehma tagħha?

Din il-mistoqsija tibqa’ bla tweġiba wara li nkunu qrajna r-rapport tal-Uffiċċju Nazzjonali tal-Verifika.

Huma biss iċ-ċwieċ li jistgħu jaċċettaw l-ispjegazzjoni li dan kien żball!

 

Ippubblikat f’Illum : Il-Ħadd 17 ta’ Ġunju 2018

The Dingli “oversight”

The National Audit Office (NAO) has just concluded an investigation into the Dingli Interpretation centre which sought to determine if there had been collusion between various government officials so that the site will be transformed from an interpretation centre into a catering establishment.

The investigation, as explained in the NAO’s report, did not uncover any evidence to suggest fraud and/or corruption. There is, however, reference to what is being described as an “oversight”. Of central importance in the development of this “oversight” was the authority dealing with land-use planning – then known as MEPA, today rebranded as PA!

When an application for an outline development permission was submitted by the Dingli Local Council in 2002 (application PA5314/02) the local council was requesting the incorporation of a catering area in the submitted plans. Drawing on planning documentation, the NAO report explains in detail how Dingli Local Council was requested by MEPA to revise the submitted proposal. These changes, the NAO report emphasised, “included the elimination of catering services”. To be very clear, MEPA insisted on a change to the development proposal itself.

The original development proposal submitted by the Local Council consisted of the demolition of the two existing buildings and the construction of a new building, consisting of three floors, of a modern design, which occupied a larger footprint than the existing structures. The plans included a kitchenette and a large area designated for seating.

MEPA insisted – and Dingli Local Council agreed – that the description of the proposed development be amended to read ‘restore existing structures, carry out alterations and additions to convert them to an interpretive centre’. The sale of food and drink on site was to be limited to the use of vending machines.

Subsequently, an application for full development permission was submitted by Dingli Local Council and approved by MEPA. We are informed by the NAO report that the approved application (PA0425/08), “allowed food and drink to be served at the Interpretation Centre as an ancillary activity” notwithstanding the fact that these were prohibited by the previous approved outline development permit which established the basic acceptable parameters of the project.

The NAO report states that when the Chairperson of the Development Control Commission (DCC) was queried on the matter, she explained this variance as an “oversight” and said that she was under the impression that the permit issued reflected the Board’s discussion, and therefore excluded catering on site.”

Now an “oversight”, according to my dictionary is “a mistake made through a failure to notice something”.

Going through the MEPA documentation available, I came across the minutes of the DCC which do not indicate an oversight. In fact, the minutes of the DCC held on 18 March 2009 specifically state that there was the intention to refuse the application specifically because catering facilities (that is Class 6 use) were not approved in the outline development permission.

In the MEPA documentation which is referred to as DPAR (Development Permit Application report) in the section entitled “Notes to Committee”, it is written that the Local Council architect reacted by submitting a revised set of drawings in which the catering facility was removed.

In later meetings of the DCC, this intention disappeared and the application (including the catering facilities) was approved on 20 January 2010.

This is anything but an “oversight”: they knew all along what was going on.

The NAO report states: “This Investigation notes that between 18 March 2009 and 10 March 2010, MEPA’s position changed from excluding Class 6 facilities to one that allowed catering as an ancillary facility.”

The basic question is: what happened between the 18 March 2009 and 10 March 2010, as a result of which the DCC changed its views? It is a question which the NAO report fails to answer.

Only idiots would accept that this is an “oversight”.

Published in The Malta Independent on Sunday : 16 June 2018

Snippets from the EGP Manifesto: (5) Lobbyists, fraud and corruption

EU.lobbying 

The EU needs a stronger anti-corruption policy and more effective instruments against organized crime to strengthen democracy and the rule of law, and also to strengthen the European economy.

Corrupt behaviour by EU officials or parliamentarians in their relations with lobbyists must be met with very strong reactions. Big business still influences the Commission too much. Almost 80% of all stakeholders appointed by the Commission represent corporate interests, despite a commitment to change.

Greens also fight to tackle the problem of “revolving doors” where top bureaucrats and politicians in European institutions join private organizations which they were previously responsible for regulating. We want to safeguard democracy from corruption by introducing robust regulation and transparency for the financing of political parties, candidates and election campaigns. We want to provide the Court of Justice of the EU and the European Court of Auditors with stronger tools to control the way in which EU resources are spent and to act against corruption both within the EU institutions and in the case of serious problems within the member states.

(EGP 2014 Manifesto section entitled  : Fight Fraud and Corruption)