Dritt ta’ aċċess għax-xemx

Id-dritt li jkollna aċċess għax-xemx reġa’ għal darba oħra qed jissemma b’insistenza. Dawk fostna li huma konxji li l-użu tax-xemx għall-ħtiġijiet tagħna jagħmel kemm sens ambjentali kif ukoll sens ekonomiku qiegħed dejjem jiżdied. Sfortunatament huma ostakolati mill-politika dwar l-użu tal-art li hi interessata biss biex taqdi lir-rebgħa li, jippruvaw jgħidulna li hi żvilupp.

Li nagħmlu użu mill-enerġija li tiġġenera x-xemx jiddependi minn dak li jkun hemm jostakola l-wasla tar-raġġi tax-xemx meta jkollna ħtieġa tagħhom! Meta l-parti l-kbira tal-pjani lokali kienu approvati fis-sajf tal-2006, kien żdied bil-kbir l-għoli tal-bini permissibli f’diversi lokalitajiet. F’xi każi l-ammont ta’ sulari li jistgħu jinbnew żdiedu minn 2 għal 5, inkluż penthouse. Is-sitwazzjoni hi agħar fejn jista’ jkun hemm garaxxijiet li jkunu parzjalment taħt il-livell tal-triq (semi-basement). Din il-bidla f’dak li jista’ jinbena effettwat ħafna żoni fejn kien hemm bini b’żewġ sulari.

L-impatt ta’ din il-bidla fl-għoli permissibli tal-bini qiegħed jiżdied biż-żmien għax issa qed isir żvilupp mill-ġdid ta’ bosta propjetajiet li ilhom ftit ta’ żmien li nbnew. Dan qed joħloq ħafna dellijiet fuq bosta djar residenzjali fl-ibliet u l-irħula tagħna. Bħala riżultat ta’ dan il-pannelli fotovoltajċi u l-istallazzjonijiet li jsaħħnu l-ilma bix-xemx (solar water heaters) stallati fuq il-bjut ta’ bosta residenzi issa qegħdin fid-dell għall-ħin twil u ġew ma jiswew xejn. Dawn huma investimenti li għamlu ħafna familji Maltin li ġew issagrifikati fuq l-altar tar-rebgħa tal-hekk imsejjaħ żvilupp. Sussidji użati bħala għajnuna biex niġġeneraw l-enerġija mix-xemx, inkluż dawk li oriġinaw minn fondi Ewropej, f’numru mhux żgħir ta’ każi spiċċaw moħlija.

Dan kollu hu riżultat ta’ politika dwar l-ippjanar tal-użu tal-art bla viżjoni fit-tul. Politika li falliet biex tqis u tindirizza impatti ovvji. B’mod speċifiku hi riżultat li teżamina l-proposta dwar l-għoli permissibli tal-bini fid-dawl tal-proċeduri stabiliti mid-direttiva tal-Unjoni Ewropea dwar l-istima ta’ l-effetti ta’ ċerti pjanijiet u programmi fuq l-ambjent (Strategic Environment Assessment Directive). Din hi direttiva li tfittex li teżamina politika (policy), pjani u programmi biex ikun stabilit u eżaminat l-impatt ambjentali tagħhom.

Dawk minnha li huma familjari ma kif taħdem u ħadmet l-Awtorità tal-Ippjanar jafu li l-Pjani Lokali ġew approvati bl-għaġġla fis-sajf tal-2006. Dan sar l-għaliex iktar dewmien kien ikun ifisser illi dawn il-pjani kienu jkun soġġetti għal eżami dwar l-impatti ambjentali tagħhom skond kif tipprovdi d-direttiva tal-Unjoni Ewropea dwar l-istima ta’ l-effetti ta’ ċerti pjanijiet u programmi fuq l-ambjent (Strategic Environment Assessment Directive). Inevitabilment kien jirriżulta minn dan l-eżami li ż-żieda fil-għoli tal-bini li seta jingħata l-permess kien ser ikollu impatt negattiv fuq il-ġenerazzjoni tal-elettriku mix-xemx, kif fil-fatt qed jiġri llum! Dan l-impatt kien ikollu jkun indirizzat u l-għoli tal-bini kien ikollu jonqos.

Kellna parti mill-Gvern taħdem favur il-ħtieġa li nagħmlu użu mix-xemx biex niġġeneraw enerġija nadifa. Imma kellna parti oħra mill-Gvern li kienet ostaġġ tal-lobby tal-iżviluppaturi li riedu iktar spazju fejn jistgħu jiżviluppaw. Il-bqija nafu x’ġara. Dak l-ispazju issa qed jiġi żviluppat u bħala riżultat spiċċajna bil-pannelli fid-dell fuq il-bjut!

Iktar kmieni din il-ġimgħa, fil-Parlament, Miriam Dalli, Ministru għall-Enerġija, l-Intrapriża u l-Iżvilupp Sostenibbli fi tweġiba għal mistoqsija parlamentari ta’ Ryan Callus kelliemi tal-Opposizzjoni dwar l-Enerġija qalet li l-Gvern għaddej b’konsultazzjonijiet interni dwar dan kollu.

Tant ilna niddiskutu dan kollu li mhux nifhem x’għandha f’moħħha l-Onorevoli Ministru. Fil-fatt ftit hemm possibilitajiet x’jiġu kkunsidrati.

L-iktar possibilità ovvja hi li fejn hu possibli jitreġġa’ lura l-għoli permissibli tal-bini għal dak li kien fl-2006. Dan imma, hu diffiċli biex isir, u kieku kellu jsir immedjatament tasal talba għal kumpens ta’ miljuni ta’ euro.

Hu possibli li jkunu introdotti drittijiet dwar l-aċċess għax-xemx f’bini ġdid. Dan għandu jsir immedjatament. Hu possiblili li jkunu emendati r-regoli tal-ippjanar b’mod li jkun assigurat illi fil-bini ġdid, b’mod partikolari fil-bini ta’ flats, ikun possibli li minn fuq il-bjut tagħhom tkun ġġenerata l-enerġija mix-xemx. Dan għandu jkun biżżejjed u jagħmel tajjeb għall-konsum tal-elettriku fil-blokk tal-flats kollu. Dan ikun ifisser li l-arja ma tinżammx mill-iżviluppatur iżda tkun parti mill-blokk f’idejn is-sidien tal-flats biex fuqha jistallaw pannelli foto-voltajiċi. Dan jassigura li kull blokk ġdid ta’ flats ikun carbon neutral, jiġifieri jiġġenera elettriku mix-xemx daqs kemm ikun ikkunsmat. Il-pannelli b’hekk jieħdu post il-penthouse.

B’hekk nistgħu nibdew bil-mod insewwu l-ħsara li saret.

Ippubblikat fuq Illum : il-Ħadd 21 ta’ Frar 2021

Solar rights and planning wrongs

Solar rights are once more in the public debate. The number of those aware that utilising solar energy for our needs makes both environmental and economic sense is on the increase. Unfortunately, they are being obstructed by land use planning policy which is only interested in serving greed, camouflaged as development.

The utilisation of the sun’s energy is dependent on what gets in the way of the sun’s rays when we need them!  When most of the Local Plans were approved way back in summer of 2006, the permissible heights of building development in a multitude of areas were substantially increased. At times this increase was from 2 to 5 floors, including a penthouse level. It is worse where semi-basement garages are permissible. This change was in particular applied in respect of large areas with a previous predominance of two floored terraced houses. 

The impact of this change in the permissible height limitation is increasing in severity with time as the redevelopment of old properties is being gradually taken in hand. This is resulting in the shadowing of an ever-increasing number of residential units in a number of residential areas. As a result, solar water heaters and photo voltaic panels installed on a number of roofs in the past years, are now in the shade for a considerable amount of time and consequently are practically useless. Investments made by a number of our families have been sacrificed on the altar of development greed. Subsidies (including those originating from EU funds) which were utilised to assist the tapping of solar energy in a substantial number of cases have thus been thrown down the drain.

This is the result of myopic land use planning which failed to consider obvious impacts. Specifically, it is the result of the failure to subject the proposed height relaxation planning policies to the EU Strategic Environment Assessment Directive. The Strategic Environment Assessment Directive seeks to examine policies, plans and programmes in order to ensure that their environmental aspects are effectively considered.

Those of us familiar with the workings of the Planning Authority are aware that most of the Local Plans were rushed through to approval during the summer of 2006. This was done as any further delay would have made them subject to Strategic Environment Assessment procedures which would have inevitably highlighted the impact of height relaxation on the generation of solar energy. As a result, the conflict with the need to have solar energy generated would have been highlighted and most probably addressed.

While one section of government was encouraging one and all on the need to tap the sun’s rays to generate clean and renewable energy, another section, hostage to the development lobby was obstructing this and pushing forward their need for more space to develop! The rest is history. That space is currently being developed today, in the process obstructing the further generation of renewable energy on our rooftops.

In Parliament, earlier this week Minister for Energy, Enterprise and Sustainable Development Miriam Dalli in reply to a Parliamentary Question from Ryan Callus, spokesperson for Energy on behalf of the Opposition, stated that government was holding internal discussions on the matter.

The matter has been discussed many times to date so I cannot decipher exactly what Minister Miriam Dalli has in mind. There are in fact very few possible options which can be considered.

The most obvious option is to revise as much as possible the height relaxation carried out in 2006. This will be very difficult to carry out, and, if done, it will be immediately followed-up by a request for compensation running into many millions of euro.

Alternatively, one can seek to introduce solar rights on new buildings without further delay. It is possible that planning policy is amended to ensure that all new properties, in particular blocks of flats, should generate sufficient electricity to cater for the number of units in the new block, thus ensuring carbon neutrality. Such a measure would essentially require that the roof is owned together with the individual units in order that owners of the said units may install photo voltaic panels. Consequently, it would signify that the space which till now has been utilised for the development of penthouses would henceforth be reserved for the generation of renewable energy.

In so doing a history of planning wrongs would commence the long and difficult road of correction.

Published in The Malta Independent on Sunday : 21 February 2021

Iktar dellijiet, inqas enerġija mix-xemx

solar rights

Qed jipproponu li lukandi li jeħtieġu iktar spazju jkollhom il-possibilita’ li jibnu żewġ sulari oħra. Nifhem li dawn ser ikunu żewġ sulari iktar milli l-pjan lokali preżentement jippermetti.

L-iskuża hi li bidla bħal din tgħin lit-turiżmu u lill-ekonomija.

Fil-fehma tiegħi bidla bħal din m’hiex meħtieġa. La tgħin lit-turiżmu u l-anqas lill-ekonomija. Toħloq chaos iktar milli hawn bħalissa fil-qasam tal-ippjanar fl-użu tal-art. Għax jekk ir-regoli jinbidlu għal settur wieħed, ġustament ser iqumu setturi oħra u jippretendu trattament ugwali.

Għax għandek tippermetti għoli addizzjonali għat-turiżmu u mhux għoli addizzjonali għall-uffiċini jew għar-residenzi?

Imbagħad hemm argument addizzjonali dwar l-enerġija solari. Il-bini eżistenti madwar dawn il-lukandi ser ikun effettwat ħażin. Ser ikun hemm diversi minn dan il-bini li fih sar investiment f’apparat li jagħmel użu mix-xemx. Dan l-apparat  (pannelli foto-voltaiċi u solar water heaters) li issa ser ikun fid-dell ser ikun investiment moħli.

Tiftakru lill-Labour Party jitkellem fuq solar rights?  Leo Brincat, 5 snin ilu kien qalilna: MLP calls for solar rights as civil rights. M’ilux ħafna li qalulna dan, iżda konvenjentement ġja insew!

Malta’s Nine Ghost Towns

The 2005 Census had revealed that 53,136 residential units in Malta were vacant. This was an increase of 17,413 units over the 35,723 vacant residential units identified during the 1995 Census. Faced with an increase of over 48 per cent in 10 years, a responsible government would have contained the development boundaries as existing supply can satisfy the demand for residential accommodation for many years to come.

In 2006, just nine months after the 2005 Census, the Nationalist Party-led Government defied common sense and, instead of applying the brakes, it further increased the possibilities for building development through three specific decisions. Through the rationalisation process, the PN-led Government extended the boundaries of development in all localities. Then it facilitated the construction of penthouses by relaxing the applicable conditions. If this were not enough, it increased the height limitations in various localities, intensifying development in existing built-up areas.

As a result of increasing the permissible heights, sunlight was blocked off low-lying residential buildings in the affected areas.

These residences were using sunlight to heat water through solar water heaters or to generate electricity through photovoltaic panels installed on their rooftops.

They can now discard their investments in alternative energy thanks to the PN-led Government’s land use policies!

The result of these myopic land use planning policies further increased the number of vacant properties, which is estimated as being in excess of 70,000 vacant residential units. (Mepa chairman Austin Walker, in an interview in June 2010, had referred to an estimated 76,000 vacant residential properties.)

The estimated total of vacant residential properties is equivalent to nine times the size of the residential area of Birkirkara, the largest locality in Malta, which, in 2005, had 7,613 residential units.

These ghost towns over the years have gobbled up resources to develop or upgrade an infrastructure that is underutilised. Spread all over the Maltese islands, these ghost towns have required new roads, extending the drainage system, extending the utility networks and street lighting as well as various other services provided by local councils.

The funds channelled to service ghost towns could have been better utilised to upgrade the infrastructure in the existing localities over the years.

The above justifies calls for an urgent revision of development boundaries through a reversal of the 2006 rationalisation exercise where land included for development in 2006 is still uncommitted.

Similarly, the relaxation of height limitations and the facilitated possibility to construct penthouses should be reversed forthwith.

All this is clearly in conflict with the efforts being made by the Government itself, assisted with EU funds, to increase the uptake of solar water heaters and photovoltaic panels.

I am aware of specific cases where decisions to install photovoltaic panels have had to be reversed as a result of the development permitted on adjacent property subsequent to the 2006 height relaxation decisions.

In its electoral manifesto for the forthcoming election, AD, the Green party, will be proposing a moratorium on large-scale development in addition to the reversal of the above policies as it is unacceptable that the construction industry keeps gobbling up land and, as a result, adding to the stock of vacant property.

The market has been unable to deal with the situation and, consequently, the matter has to be dealt by a government that is capable of taking tough decisions in the national interest.

Neither the PN nor the Labour Party are capable of taking such decisions as it has been proven time and again that both of them are hostages to the construction industry.

The slowdown of the activities of the construction industry is the appropriate time to consider the parameters of its required restructuring. It is clear that the construction industry has to be aided by the State to retrain its employees in those areas of operation where lack of skills exist.

There are three such areas: traditional building trades, road construction and maintenance as well as marine engineering.

Traditional building skills are required primarily to facilitate rehabilitation works of our village cores and to properly maintain our historical heritage. Our roads require more properly-trained personnel so that standards of road construction and maintenance are improved and works carried out in time. Our ports and coastal defences require a well-planned maintenance programme and various other adaptation works as a result of the anticipated sea-level variations caused by climate change.

The construction industry employs about 11,000 persons. It is imperative that its restructuring is taken in hand immediately.

In addition to halting more environmental damage, a long overdue restructuring will also serve to mitigate the social impacts of the slowdown on the families of its employees through retraining for alternative jobs both in the construction industry itself and elsewhere.

The so-called ‘social policy’ of the PN and the PL have neglected these families for years on end.

 

published in The Times on 29 September 2012