We need a Carbon Budget

Searching for the word “climate” through the 2021 Pre-Budget document published earlier this week entitled Towards a Sustainable Economy one finds the word three times: twice referring to the United Nations Agenda which has to be addressed by Malta as a prospective UN Security Council member, while a third reference is to policy documents under preparation in Malta. The word climate in the pre-budget document is not associated with any climate change policy implementation or action and its impact on the Maltese economy.

It is already five years since the Paris Climate Summit and its conclusions are still being “studied” in Malta. If we keep on procrastinating, achieving carbon neutrality by 2050 will be very difficult to attain.

When Parliament approved the Climate Action Act in 2015 it identified that one of the tools to be used in the politics of climate change was the formulation of a Low Carbon Development Strategy. Consultation on a Vision to develop such a strategy was carried out in 2017, but three years down the line the final policy document is nowhere in sight, even though the Minister for Climate Change Aaron Farrugia has indicated that it may be concluded towards the end of this year. 

A Low Carbon Development Strategy will identify those sectors which are of considerable relevance in developing a low carbon strategy. Some of them are major carbon emission contributors to be addressed. Other sectors are part of the solution as they provide alternative tools which serve to decouple the economy from intensive energy use, in the process reducing carbon emissions.

The Vision which was subject to public consultation three years ago identifies a number of sectors as areas for climate action, namely: enterprise, energy, transport, waste, water, agriculture, tourism, information and communication technologies (ICT) and finance.

The Low Carbon Development Strategy, when published, should address these areas of action. It would also be expected that such a strategy would also identify the manner in which we will be in a position to achieve our target of carbon neutrality. Such a strategy would also, for completeness be expected to be coupled with a carbon budget which would break down the general target into specific manageable objectives which could be achieved over a specific and reasonable timeframe.

At the Paris Climate Summit, together with all other countries, Malta made pledges to take action in order to lay the foundations for reducing climate impacts. If all the pledges made at Paris are honoured, however, we will still be very far off from achieving the target of not exceeding a two-degree Celsius temperature rise. Much more is required.

Unfortunately, Malta’s climate related policies are double faced. On one hand the Malta government publicly pledges action to address climate change. Simultaneously, however, it proceeds with massive road infrastructural projects which encourage more cars on our roads. On the other hand, plans for the electrification of our roads are apparently subject to an elephantine gestation period. In the meantime, car emissions compete with power generation emissions as Malta’s major contributor to climate change.

It is unfortunate that the Low Carbon Development Strategy and the associated Carbon Budget are taking too long to be formulated. It will take much longer to implement them as special interest groups will undoubtedly seek to protect their specific areas to the detriment of attaining our carbon-neutral objective.  

Malta should be at the forefront of climate change action. Parliament’s declaration recognising the existence of a climate emergency is not enough. Words must give way to action. As an island, Malta should be aware that a primary climate change challenge in the years to come will be a rising sea level as a result of which the coastline may recede inwards at a rate so far unknown. The coast, we may remember, is home to most of our maritime and tourism infrastructural facilities, all of which are under threat. Even residential areas close to the sea level will be impacted. This would include all sandy beaches and the residential/commercial areas at l-Għadira, Xemxija, Salini, Gzira, Msida, Sliema, Ta’ Xbiex, Pietà, Marsa, Marsaxlokk, Marsaskala, Birzebbuga, Xlendi, and Marsalforn. Impacts could also move towards inland low-lying areas such as Qormi.

If we take too long to bring our own house in order, it may be too late.

published in The Malta Independent on Sunday : 13 September 2020

Malta: b’politika diżonesta dwar il-klima

Stimi dwar kemm jista’ jogħla l-livell tal-baħar, b’mod globali kif ukoll fl-Ewropa, ivarjaw skond kif wieħed iqis ir-rata tad-dewbien tas-silġ akkumulat fil-poli kif ukoll fi Greenland. Il-mod kif nilqgħu għall-emissjonijiet tal-karbonju ukoll għandu impatt fuq dawn l-istimi. Dawn l-istimi fil-fatt ivarjaw minn żieda ta’ 34 ċentimetru sa żieda ta’ 172 ċentimetru sa tmiem dan is-seklu. Imma jekk l-emissjonijiet tal-karbonju jkunu indirizzati b’politika iffukata u effettiva, din iż-żieda tista’ tkun waħda iżgħar.

Minkejja dan, ħadd ma qiegħed f’posizzjoni li jantiċpa jekk din iż-żieda fil-livell tal-baħar tkunx waħda gradwali inkella jekk din isseħħx f’daqqa. Hemm iżda l-biża’ li l-gravità tas-sitwazzjoni tista’ taċċellera avolja il-jekk u l-meta ħadd ma jaf. Din hi xi ħaga ġdida għal kulħadd!

Kull żieda fil-livell tal-baħar, kemm jekk isseħħ b’mod gradwali kif ukoll jekk isseħħ f’daqqa, ikollha impatt fuq il-kosta u b’mod partikolari fuq l-infrastruttura żviluppata tul iż-żmien. Din l-infrastruttura hi primarjament waħda turistika imma tinkludi ukoll żvilupp residenzjali li xi drabi jasal sax-xifer, sal-baħar: kemm bl-approvazzjoni tal-awtoritajiet u anke xi minndaqqiet mingħajrha!

Il-ħsara potenzjali għall-infrastruttura kostali hi kwistjoni li għandha tħassibna. Din diġà sofriet ħsarat diversi minħabba il-maltemp qalil li żied fil-frekwenza u l-intensità tul dawn l-aħħar snin. L-impatt ta’ żieda fil-livell tal-baħar bla dubju ser joħloq tibdil kbir tul il-kosta kollha tal-gżejjer Maltin. L-istorja tgħallimna. Nhar it-Tnejn 28 ta’ Diċembru 1908 fil-5.20 ta’ fil-għodu Messina fi Sqallija ġarrbet wieħed mill-iktar terrimoti qliel li qatt kien hawn fl-Ewropa, b’qawwa mkejla ta’ 7.5 fuq l-iskala Richter. Immedjatament, inħoloq tsunami b’mewġ għoli sa 9 metri. Madwar sagħtejn wara, fit-7.45 ta’ fil-għodu dan it-tsunami, ftit immansat, wasal fil-gżejjer Maltin.

Diversi gazzetti Maltin ta’ dak iż-żmien irrappurtaw li l-lokalitajiet mal-kosta viċin il-livell tal-baħar kienu mgħarrqa fl-ilma mit-7.45 ta’ fil-għodu għax b’effett taz-tsunami l-baħar tela’ l-art. Dan baqa’ sal-4.00 ta’ waranofsinnhar meta l-baħar reġa’ ikkalma u rritorna lejn il-livelli normali tiegħu! Herbert Ganado, f’l-ewwel volum ta’ Rajt Malta Tinbidel jgħid li residenzi u ħwienet tul il-kosta ta’ tas-Sliema, l-iMsida u tal-Pietà kienu mgħarrqa f’tebqa’ t’għajn għax daħlilhom kwantità ta’ ilma fis-sular terran. Bħala medja l-baħar għola madwar erba’ piedi : 1.20 metri. Fil-Port il-Kbir, imma, ma ġara xejn għax kien imħares mill-breakwater, li l-bini tiegħu kien ġie ffinalizzat madwar sentejn qabel, fis-sena 1906.

Żieda fil-livell tal-baħar bħala riżultat tat-tibdil fil-klima tkun tfisser repetizzjoni tal-impatti taz-tsunami tal-1908 mifruxa iktar u fuq bażi permanenti. Il-lokalitajiet Maltin tul il-kosta li qegħdin viċin tal-livell tal-baħar jispiċċaw b’mod permanenti fl-ilma baħar. Dan ikun jinkludi r-ramliet kollha u żoni kummerċjali u residenzjali fl-Għadira, ix-Xemxija, is-Salini, l-Gzira, l-iMsida, tas-Sliema, Ta’ Xbiex, Tal-Pietà, il-Marsa, Marsaxlokk, Marsaskala, Birzebbuġa, ix-Xlendi, u Marsalforn. L-impatti jistgħu jinħassu iktar il-ġewwa mill-kosta ukoll, f’lokalitajiet li huma f’livell tal-baħar bħal Ħal-Qormi u allura jeffettwa l-inħawi kollha mix-xatt tal-Marsa sa Ħal-Qormi b’dik li hi magħrufa bħala l-Marsa tal-Inġliżi b’kollox. Dan jeffettwa ukoll l-investiment fl-infrastruttura sportiva.

Li jogħla l-livell tal-baħar issa hu inevitabbli. Imma b’ħidma bil-għaqal għad hemm ċans li nnaqqsu kemm dan jogħla. Dan jista’ jseħħ kemm-il darba nieħdu passi biex innaqqsu l-emmissjonijiet tal-karbonju u allura inkunu qed nagħtu kontribut biex iż-żieda fit-temperatura globali tkun l-inqas possibli.

Fis-summit ta’ Pariġi, Malta, flimkien mal-bqija tal-pajjiżi, wegħdet li tieħu azzjoni konkreta biex ikun possibli li jonqsu l-impatti fuq il-klima. Però anke jekk il-wegħdiet kollha li saru f’Pariġi jkunu onorati, hu ċar li għadna l-bogħod ħafna milli nilħqu l-mira miftehma li ma naqbżux iż-żieda ta’ żewġ gradi Celsius fit-temperatura. Hu meħtieġ ħafna iktar mingħand kulħadd. Hemm bżonn mhux biss iktar azzjoni konkreta imma ukoll politika koerenti u konsistenti.

Il-politika ta’ Malta dwar il-klima, imma, hi waħda diżonesta. Nuru wiċċ b’ieħor kontinwament. Min-naħa l-waħda l-Gvern Malti jwiegħed li jaġixxi biex ikun possibli li nindirizzaw il-klima. Imma fl-istess ħin jibqa’ għaddej bi proġetti infrastrutturali li jinkoraġixxu iktar karozzi fit-toroq u allura iktar emissjonijiet. L-emissjonijiet tal-karozzi jikkompetu ma dawk li joriġinaw mill-ġenerazzjoni tal-elettriku.

Hemm bżonn li ndaħħlu ftit sens u konsistenza fil-politika ta’ Malta dwar il-klima. Għax sakemm nibqgħu inkonsitenti kullma qed nagħmlu hu li qed ngħinu biex ikompli jitħaffar il-qabar tagħna.

 

ippubblikat fuq Illum : il-Ħadd 24 ta’ Mejju 2020

Malta: a double-faced climate change policy

Estimates for sea-level rise, both globally as well as in Europe, vary depending on the assumptions made as to the rate at which ice at the polar caps and Greenland is melting.

The carbon emission-mitigation policy scenario also has a direct bearing on these estimates. These estimates range between a 34- and 172-centimetres potential sea-level rise by the end of the current century. Lower emissions together with a focused mitigation policy may restrict sea-level rise towards the lower end of the range.

However, notwithstanding, no one is in a position to predict as to whether such a sea-level rise will be gradual or sudden. It is however feared that once a tipping point is reached changes may occur at a much faster pace than anticipated. We all are on a learning curve on this!

Any sea-level rise, gradual or sudden, will have an impact on our coastline and in particular on the infrastructure developed over the years along the coast. This infrastructure is primarily of a touristic nature but it also includes residential development at times built along the water’s edge with or without the acquiescence of the planning authorities.

There is nothing to worry about if the sea-level rise wipes out abusive development. When one considers the potential impact on coastal infrastructure that is, however, a different kettle of fish.

The coastal infrastructure is already battered by the ever-frequent storms. The impact of a sea-level rise will without any doubt redraw the coastal map of the Maltese islands.

Let us have a look at our history books. At 5.20am of Monday 28 December 1908, Messina in neighbouring Sicily experienced one of the most powerful earthquakes to ever hit Europe, measuring 7.5 on the Richter scale. Immediately, a tsunami generating waves as high as 9 metres was unleashed. Just over two hours later, at 7.45am, the tsunami, slightly tamed, reached the Maltese Islands.

Various local newspapers of the time reported that low-lying areas were flooded from 7.45am until around 4.00pm when the sea receded back to its “normal level”. Herbert Ganado, in his Rajt Malta Tinbidel (Volume 1, page 37) states that residences and shops along the coast in Sliema, Msida, and Pietà were suddenly flooded. The average sea-level rise was 1.20 metres. The Grand Harbour was spared as it was protected by the breakwater, whose construction had been finalised a couple of years earlier.

A sea-level rise as a result of climate change would repeat the Malta impacts of the 1908 tsunami on a permanent basis. The low-lying parts of the Maltese coastline would then be permanently underwater. This would include all sandy beaches and the residential/commercial areas at l-Għadira, Xemxija, Salini, Gzira, Msida, Sliema, Ta’ Xbiex, Pietà, Marsa, Marsaxlokk, Marsaskala, Birzebbuga, Xlendi, and Marsalforn. Impacts could also move towards the inland low-lying areas such as Qormi.

Sea-level rise is inevitable. It is only its extent which can be reduced. This can happen if we take appropriate action which reduces carbon emissions and hence contributes to nudging the temperature increase towards the least possible.

At the Paris Climate Summit, together with all other countries, Malta made pledges to take action to lay the foundations for reducing climate impacts. If all the pledges made at Paris are honoured, however, we will still be very far off from achieving the target of not exceeding a two-degree Celsius temperature rise. Much more is required.

Malta’s climate related policies are double faced. On one hand the Malta government pledges action to address climate change. Simultaneously it proceeds with road infrastructural projects which encourage cars on our roads. Car emissions compete with power generation emissions as Malta’s major contributor to climate change. Is it not about time that we bring our own house in order? We are digging our own grave with a double-faced climate policy.

published on The Malta Independent on Sunday : 24 May 2020

Il-mina mhix soluzzjoni: hi problema

Il-mina li hi proposta taħt qiegħ il-baħar bejn Għawdex u Malta ser ikollha impatti negattivi konsiderevoli kemm fuq Għawdex kif ukoll fuq Malta. L-iżjed wieħed ovvju hu l-ġenerazzjoni ta’ madwar miljun u nofs metru kubu ta’ radam li ser jispiċċa fil-baħar. Dan ser jagħti bidu għal ħmar il-lejl ambjentali ieħor: għax l-iżviluppaturi ma baqgħalhomx fejn “jiżviluppaw” fuq l-art! Qed ifittxu l-ispazju. L-Awtorità dwar l-Ambjent u r-Riżorsi diġa identifikat fejn dan jista’ jsir. Mhux ta’ b’xejn li r-residenti tax-Xgħajra qed jirvellaw.

Il-problemi assoċjati mal-mina proposta huma bosta. Art agrikola madwar il-punti tad-dħul, fuq iż-żewġ naħat, kemm f’ Ta’ Kenuna fil-limiti tan-Nadur kif ukoll ħdejn

L-Għerien fil-periferija tal-Mellieħa u ma tul il-wied tal-Pwales ser ikollha tagħmel il-wisgħa. Din ser tispiċċa tkun trasformata f’toroq kif ukoll f’faċilitajiet għall-kontroll tad-dħul fil-mina. Magħhom imbagħad jiżdiedu pompi tal-petrol, kull naħa tal-mina.

Hu ċar, minn dak magħruf s’issa, li d-dħul għall-mina min-naħa ta’ Malta ser ikun viċin ħafna tal-ilma tal-pjan tal-Miżieb, jekk mhux dritt minn ġo fih ukoll! Dan l-ilma tal-pjan hu f’kundizzjoni tajba, l-aħjar wieħed fil-gżejjer Maltin. Din kienet ukoll waħda mir-ragunijiet ewlenin l-għaliex fil-passat riċenti kellhom ikunu abbandunati żewġ proġetti kbar fl-inħawi, dak tal-golf course u ieħor konness mat-toroq (in-network TEN-T).

Għandu jingħad ukoll li volum kbir ta’ traffiku ser ikun iġġenerat u dan ser jgħaddi viċin ħafna tar-riżerva naturali tas-Simar fix-Xemxija. Il-ħsejjes, id-dwal u t-tniġġiż tal-arja ser ikollhom impatt negattiv konsiderevoli fuq ir-riżerva, b’mod partikolari matul il-lejl, ħin li fih in-natura ukoll tfittex li tistrieħ.

Dawn il-problemi li inevitabilment jinħolqu mill-mina għandhom iwasslu lil min hu rasu fuq għonqu biex ifittex soluzzjoni alternattiva biex titjieb il-konnettività bejn Għawdex u Malta. Soluzzjoni li tevita dawn il-problemi u iktar.

Ħa nkun ċar: il-konnettività bejn il-gżejjer ta’ Għawdex u Malta teħtieġ titjib konsiderevoli: is-soluzzjoni imma, mhiex il-mina. Is-soluzzjoni għandha tkun waħda li tiffaċilita l-moviment bejn il-gżejjer mingħajr ma żżid mal-problemi li diġa għandna. B’mod partikolari għandna nevitaw li nkabbru l-problema tat-traffiku iktar milli hi diġa. Dan nistgħu nagħmluh jekk niżviluppaw soluzzjoni li tnaqqas flok ma tkabbar id-dipendenza tagħna fuq il-karozzi.

Hu stmat li l-mina proposta ser iżżid il-medja kull jum tal-movimenti tat-traffiku bejn il-gżejjer mit-3000 tal-lum għal madwar 9000: żieda bi tlett darbiet fuq perjodu ta’ ħmistax-il sena. Wieħed ma jridx wisq għerf biex jifhem dawn iċ-ċifri, li nsibuhom ukoll fl-istudju ekonomiku kkummissjonat fl-2015 mill-Awtorità tat-Trasport u l-Kamra tal-Kummerċ Għawdxija. Għax il-ħlas biex tgħaddi mill-mina ser jinġabar minn fuq kull karozza u allura d-dħul ser jiddependi mill-ġenerazzjoni tal-ikbar ammont possibli ta’ traffiku. L-eżistenza tal-mina tiddependi fuq dan: bla traffiku ma tistax teżisti. Dan imur kontra l-oġġettiv ewlieni tal-Pjan Nazzjonali tat-Trasport (National Transport Master-Plan 2025) li fi kliem mill-iktar ċar jispjega kemm it-tnaqqis tal-karozzi mit-toroq tagħna hu l-mira fit-tul tal-politika tagħna dwar it-trasport.

Is-soluzzjoni meħtieġa trid tindirizza l-moviment tan-nies u mhux il-moviment tal-karozzi. L-unika soluzzjoni raġjonevoli allura hi l-introduzzjoni ta’ katamaran (fast ferry service) bejn Għawdex u Malta: bejn l-Imġarr f’Għawdex u punti varji mal-kosta f’Malta li jistgħu jinkludu x-Xemxija, Tas-Sliema u l-Belt Valletta. Ma dan imbagħad ikun hemm ħtieġa tat-titjib tas-servizz tat-trasport pubbliku minn fejn jieqaf il-katamaran għall-bqija tal-pajjiż.

Hu essenzjali li s-soluzzjonijiet li nagħżlu għall-problemi tagħna tat-trasport ikun jħarsu fit-tul ħalli nnaqqsu u mhux inżidu l-problemi li nħallu lil ta’ warajna.

Ippubblikat f’Illum: il-Ħadd 3 ta’ Frar 2019

The proposed Tunnel is not a solution: it is a problem

The proposed tunnel below the seabed linking Malta and Gozo will have considerable negative impacts on both Gozo and Malta. The most obvious one is the generation of around one and a half million cubic metres of bits of rock which will be dumped into our seas, kick-starting another environmental nightmare, land reclamation. The construction lobby has run out of space to “develop” on land. The Environment and Resources Authority has already started identifying potential sites. The residents of Xgħajra have good reason to be up in arms.

The problems associated with the proposed tunnel are manifold. Agricultural land around the two points of exit of the proposed tunnel will be gobbled up: at Ta’ Kenuna on the outskirts of Nadur, and close to L-Għerien, on the periphery of Mellieħa and further along the Pwales valley. This agricultural land will make way for the roads and toll-control facilities leading to the tunnel. Then, they will inevitably be complemented by more petrol stations.

On the basis of what is known so far, it is already clear that on the Malta side the tunnel will be bored through or very close to the Miżieb aquifer, which is still in a very good state – the only one on the island so graded. This fact has been one of the determining issues leading to the abandonment of other large scale projects in the area (the golf-course and part of the TEN-T network).

One could also add that a substantial amount of traffic will be channelled very close to the Simar Nature Reserve in Xemxija. The resulting noise, light and air pollution will have a considerable negative impact on the reserve, especially at night, a time when nature seeks its resting time.

The problems generated by the proposed tunnel are substantial. There is, however, a reasonable solution to the connectivity issue.

Let me be clear: connectivity between the islands of Gozo and Malta needs considerable improvement. The proposed tunnel, however, is not the solution. The solution should be one which facilitates movement between the islands without creating more problems than we already have! In particular, we should avoid worsening the traffic problem. This can be done if the solution we seek is not one which increases our car dependency.

It is estimated that the proposed tunnel will increase average daily traffic movements between the two islands from the current 3,000 to a projected 9,000 – a threefold increase estimated over a fifteen-year period. One immediately understands the purpose of these projections referred to in the feasibility study commissioned jointly by Transport Malta and the Gozo Business Chamber in 2015. The toll to be charged – and, consequently, the tunnel’s economic performance – is dependent on generating the maximum traffic possible. Traffic underpins the very existence of the tunnel. This runs counter to the basic objective of the National Transport Master-Plan 2025 which in crystal clear language spells out the reduction of cars from our roads as the long-term objective of Malta’s National Transport Policy.

The solution needs to address the movement of people between the islands, not the movement of cars. The only reasonable solution would be the introduction of a fast-ferry service between Gozo and Malta, between Mġarr in Gozo and various points in Malta, which would include Xemxija, Sliema and Valletta. This should be linked to an improvement in the public transport links between these points and the rest of the country.

It is essential that we seek long-term solutions to our transport problems, such that we do not leave future generations burdened by our problems.

published in The Malta Independent on Sunday – 3 February 2019