Il-ħarsien tal-kosta: ma hemmx rieda politika

Il-kosta Maltija hi taħt assedju. Ilha żmien hekk. Il-kummerċjalizzazzjoni tal-kosta mhiex fenomenu riċenti. Ilha għaddejja s-snin.

L-abbozz ta’ Masterplan għal Paceville, li issa ġie skartat, ma kellu l-ebda skop li jħares il-kosta. Kemm min fassal dan il-pjan kif ukoll it-tmexxija tal-Awtorità tal-Ippjanar, li mexxietu ‘l quddiem, fittxew li jiffaċilitaw il-kummerċjalizzazzjoni tal-kosta. L-abbozz ta’ pjan għal Paceville injora kompletament il-liġi dwar id-dimanju pubbliku, eżatt bħal ma qiegħed iseħħ fir-regolamentazzjoni dwar l-ippjanar għall-użu tal-art b’mod ġenerali.

It-titjib li sar fl-2016 fil-leġislazzjoni lokali dwar id-dimanju pubbliku kien eżerċizzju biex jagħti stampa li mhiex minnha. Beda bil-pubblikazzjoni fl-2012 tal-White Paper bit-titlu bombastiku ta’ The Public Domain. Classifying Public Property – Achieving a Qualitative Leap in Protection and Governance.” Iktar tard, il-Parlament approva l-liġi bħala riżultat ta’ mozzjoni mressqa mill-Opposizzjoni. Bla dubju, jeżistu problemi fil-proċess tal-implimentazzjoni, problemi li ser idumu biex tinstabilhom soluzzjoni, sal-mument li ftit li xejn ikun baqa’ x’tipproteġi!

Minkejja l-liġi li ssaħħaħ u taġġorna l-qafas regolatorju għall-governanza tad-dimanju pubbliku, wara tlett snin, is-sitwazzjoni qed tmur mill-ħażin għall-agħar. Talbiet li saru mill-għaqdiet ambjentali biex immedjatament jibda l-proċess ta’ implimentazzjoni tqiegħed fil-ġemb għax ma hemm l-ebda rieda politika li l-affarijiet jiċċaqalqu. L-għaqdiet ambjentali ilhom sa minn Ġunju 2016 li issottomettew id-dokumentazzjoni meħtieġa dwar 23 sit mal-kosta biex dawn ikunu protetti. L-Awtorità tal-Ippjanar ilha minn dakinnhar tkaxkar saqajha, attenta li ma tmurx tippreġudika l-interessi tal-iżviluppaturi li hi sservi bi skruplu kbir.

Il-ħarsien tal-kosta tfisser ferm iktar minn tindifa u ġbir ta’ skart mormi. Ifisser li għandna nibdlu l-attitudnijiet tagħna kif ukoll li nduru dawra l-politika żbaljata li l-pajjiż għandu llum. Għandna bżonn urġenti ta’ amministrazzjoni pubblika li tkun kapaċi tifhem li hi teżisti biex isservi u biex tħares il-ġid komuni. Sfortunatament, f‘Malta, l-awtoritajiet jagħtu messaġġ ċar li l-viżjoni tagħhom hi li jiffaċilitaw li jkun hawn min ibill subgħajh f’dak li jamministra l-istat Malti.

Il-ħarsien tal-kosta u lil hinn minnha hi meħtieġa biex ikollna governanza tajba, li aħna nieqsa minnha. L-oriġinI ta’ dan fil-liġi Maltija taf il-bidu tagħha għal influwenza mil-liġi Rumana li kienet tqis il-kosta u lil hinn minnha bħala propjetà pubblika biex titgawda minn kulħadd: jiġifieri l-kosta hi tagħna lkoll. Il-Kodiċi Ċivili Malti jinkludi artikli li jikkunsidraw iċ-ċirkustanzi li bħala riżultat tagħhom il-parti l-ġewwa mill-kosta protetta tista’ tasal sa fejn twassal l-ikbar mewġa, u dan jista’ jkun sa ħmistax-il metru ‘l-ġewwa mill-kosta. F’din iz-zona ta’ 15-il metru hemm numru ta’ propjetajiet privati.

Huwa ta’ sfortuna li l-Awtorità tal-Ippjanar tinjora dan kollu meta tkun qed tikkunsidra applikazzjonijiet ta’ żvilupp li għandhom faċċata fuq il-kosta ta’ San Ġiljan. Tliet applikazzjonijiet dwar l-istess sit mal-kosta diġa ġew approvati, bir-raba’ applikazzjoni qed toqrob għal deċiżjoni. Il-propjetà oriġinali kienet ilha żmien mibnija. Tidher fis-survey sheets il-qodma tal-1906. B’żieda ma dan, fis-sit tal-Awtorità tal-Ippjanar hemm survey fotografiku tal-bini minn ġewwa li juri li l-bini mal-kosta faċċata tal-kunvent tal-Karmelitani fil-Balluta, San Ġiljan hu ta’ kostruzzjoni qadima.

L-iżvilupp inkwistjoni ngħata permess fuq art mal-kosta. B’żieda ma dan kif jidher fil-pjanta approvata li qed nippubblika ma dan l-artiklu, jidher ċar li l-binja tibqa’ ħierġa fuq il-baħar. Jidher li l-Awtorità tal-Artijiet l-anqas biss tniffset dwar dan.

Xi ħtieġa għandna ta’ konferma li l-Awtorità tal-Ippjanar mhiex interessata fil-ħarsien tal-kosta? L-Awtorità tal-Ippjanar issa għandha kompliċi ġdid, l-Awtorità tal-Artijiet, li suppost hi l-gwardjan u l-amministratur tal-propjetà pubblika. Jidher li għad baqa’ biex isseħħ il-qabża fil-kwalità imwegħda fil-ħarsien u l-amministrazzjoni tal-propjetà pubblika.

Minflok, qegħdin kontinwament niffaċċjaw inizjattivi ġodda li bihom assi pubbliċi jsiru privati. Il-ħarsien tal-kosta teħtieġ amministrazzjoni serja li jkollha r-rieda politika li taġixxi. Sfortunatament la għandna l-waħda u l-anqas l-oħra.

Ippubblikat fuq Illum : Il-Ħadd 14 t’April 2019

 

Protecting our Coast: no political will in sight

Our coast is under siege. It has been for a number of years and its commercialisation is not a recent phenomenon: this has also been going on for years.

The draft Paceville Masterplan, now dumped, did not envisage the protection of our coast. Its drafters and promoters of it – part of the Planning Authority’s top management -sought to facilitate the coast’s commercialisation, with the result that it ignored the Public Domain legislation, following the lead of planning policy in general.

The 2016 upgrading of local public domain legislation was just an exercise in white-washing that started with the publication of the 2012 White Paper bombastically entitled The Public Domain. Classifying Public Property – Achieving a Qualitative Leap in Protection and Governance. It was subsequently enacted by Parliament as a result of an Opposition private members’ motion.

There are clearly some teething troubles in the implementation process, troubles that will undoubtedly take quite some time to solve, until, that is, there is nothing left to protect.

Notwithstanding the enactment of legislation which reinforced and updated the public domain regulation and governance framework, after almost three years the situation gets worse every day. Requests by environmental NGOs, to proceed rapidly with its implementation have been placed on the back-burner as there is no political will to act. As far back as June 2016, environmental NGOs submitted documented requests relating to 23 coastal sites in order that these be protected in terms of the updated legislation. The Planning Authority has been procrastinating ever since, being as cautious as ever not to prejudice the interests of the development lobby which it scrupulously serves.

Protecting the coastline means much more than physical clean-ups. Basically, what we require is an extensive clean-up of our attitudes and the weeding out of ineffective policies. We urgently require a public administrative set-up that is aware that it exists specifically in order to facilitate the protection of the common good. Unfortunately, most of the time, the authorities in Malta send a clear message that their vison is focused on facilitating the plundering of everything that is administered by the Maltese state.

Protecting the coast and the foreshore is a measure of good governance that has been absent for a very long time. Its origin in Maltese law is influenced by Roman law which considered the coast, as well as the foreshore, to be public property and for the enjoyment of all. Malta’s Civil Code includes legal provisions which consider circumstances as a result of which the foreshore may extend as far inland as the reach of the largest waves, and that could extend as much as 15 metres inland from the coastline. A number of so-called “private” properties lie within this zone.

It is indeed unfortunate that the Planning Authority ignores all this when considering planning applications for the redevelopment of properties abutting onto the coast at St Julian’s. Three applications relating to the same site with an elevation on the coastline have already been approved, while a fourth one is in the pipeline. The old property has been in existence for quite some time. It features in old survey sheets dating to the beginning of the 20th century. In addition, an internal photographic survey available for examination on the Planning Authority’s website clearly indicates clearly that the property along the coast, just in front of the Carmelite Priory in St Julian’s is of old construction.

The development in question has been permitted on a footprint starting along the coastline itself. In addition, as evidenced by the accompanying approved section drawing, planning permission issued by the Planning Authority includes part of the approved structure protruding over the sea. Not even a whimper has been heard from the Lands Authority on the matter.

Do we need any more confirmation that the Planning Authority is not interested in the protection of the coast? The Planning Authority is now joined by a new accomplice, the Lands Authority, the guardian and administrator of public property.

The qualitative leap promised in the protection and governance of public property is nowhere in sight. Instead we are continuously faced with new initiatives transforming public assets into private assets. Protecting our coast requires a serious administration that has the political will to act. Unfortunately we lack both.

published in The Malta Independent on Sunday: 14 April 2019

L-ispekulaturi tal-art mgħejjuna mill-Gvern: ħa jaħtfu l-baħar ukoll

Qieshom mejtin bil-ġuh. Wara li ħarbtu l-art, issa ser iduru għall-baħar. Għalissa qed jillimitaw ruhom mir-Rikasli saż-Żonqor. Imma wara jibqgħu għaddejjin sa Baħar iċ-Ċagħaq.

Hu ċar daqs il-kristall li l-ispekulaturi tal-art lokali dawwru għajnejhom lejn il-kosta tagħna biex jissodisfaw ir-regħba tagħhom bla qies.

L-informazzjoni li l-Awtorità għall-Ambjent u r-Riżorsi (ERA) identifikat il-kosta bejn ir-Rikażli u iż-Żonqor bħala l-iktar parti tal-kosta li hi addattata għar-riklamazzjoni hi ta’ tħassib kbir. L-ERA qed tgħid li għaliex iż-żona hija diġa’ iddegradata (jiġifieri prattikament mejta), allura ma jimpurtax li tkompli issirilha aktar u aktar ħsara, għax daqslikieku ma baqax tama għal din iż-żona. Hekk qed tgħid l-ERA b’ħafna logħob bil-kliem.

Għalkemm għadha ma ttieħdet l-ebda deċiżjoni definittiva, l-identifikazzjoni mill-ERA ta’ din iż-żona hija r-riżultat ta’ pressjoni biex jinstab sit adattat għar-rimi ta’ skart tal-kostruzzjoni li jirriżulta minn proġetti fuq skala kbira bħall-mina proposta bejn Malta u Għawdex, kif ukoll il-proġett dB fis-sit tal-ITS u l-proġett Corinthia fuq il-peniżola ta’ Pembroke. Dawn il-proġetti se jipproduċu madwar miljun u nofs metru kubu ta’ skart tal-kostruzzjoni.

Iż-żona matul il-kosta tax-Xgħajra diġà ntużat bħala sit għar-rimi tal-iskart tal-kostruzzjoni minn proġetti oħra kbar, bħall-proġett mostru tal-MIDI fuq il-peniżola ta’ Tigne. Hi żona li ġiet wkoll effetwat bħala riżultat tal-outfall tad-drenaġġ tul is-snin.

Il-Gvern irċieva madwar għoxrin espressjoni ta’ interess, liema sejħa ħarget mill-Gvern innifsu, għal proġetti li jinvolvu r-riklamazzjoni tal-art f’diversi partijiet tal-kosta. Deċiżjonijiet dwar dawn il-proġetti għadhom pendenti. Huwa magħruf ukoll li fost l-aktar proġetti msemmija huma dawk bejn Portomaso u Baħar iċ-Ċagħaq. Fosthom hemm it-talba riċenti relatata mal-proġett Corinthia fuq il-peniżola ta’ Pembroke kif ukoll iż-żona marbuta ma’ Portomaso li kienet tifforma parti mill-Masterplan ta’ Paceville li illum suppost li ġie skartat.

Sfortunatament il-Gvern huwa favur ir-riklamazzjoni tal-art u għalhekk id-dikjarazzjonijiet minn uffiċjali tal-gvern li jipprovaw jitfgħu l-ballun f’saqajn l-ERA mhux kredibbli.

Alternattiva Demokratika hi kontra l-estensjoni tal-kankru tal-ispekulazzjoni tal-art għal fuq il-baħar tagħna. Tħeġġeġ lill-Gvern biex jieħu miżuri effettivi biex jipproteġi l-kosta u l-aċċess għaliha. Għad hemm diversi talbiet pendenti minn NGOs ambjentali għall-protezzjoni tal-kosta u dan in konnessjoni mal-implimentazzjoni tal-ligi tad-dimanju pubbliku. Kemm se jdumu fuq l-ixkaffa dawn it-talbiet?

Making hay …….. in St George’s Bay

The 23-storey Pender Gardens high-rise is nearly completed, after nearly 10 years of continuous construction activity. The application for the 31-storey Mercury House was approved last month and next Thursday, the Planning Authority Board will consider planning application PA2478/16 submitted by Garnet Investments Limited in respect of a substantial stretch of land along St George’s Bay on the outskirts of Paceville St Julian’s.

The applicant has requested the following: “Demolition of all existing buildings forming part of St. George’s Bay Hotel and ancillary facilities, Dolphin House, Moynihan House and Cresta Quay. Construction of Parking facilities, Hotels and ancillary facilities, Commercial Area, Multi Ownership holiday accommodation, Bungalows, Language school with accommodation. Restoration of the Villa Rosa and upgrading of the facilities including parking facility, kitchen and toilets all below existing site levels within the Villa Rosa Area to address catering facilities/wedding hall.”

The project includes mixed-uses covering a total site area of 48,723 square metres, a building footprint of 18,345 square metres and a total gross floor area of 82,917 square meters.

It is a small part of the area that was tentatively tackled by a draft Masterplan for Paceville which, after being rejected by public opinion was sent back to the drawing board. I consider it highly unethical for the Planning Authority to proceed with considering this application after the clear and resounding verdict of public opinion. As a minimum, the consideration of this application should have been postponed until a new, reasonable and acceptable Masterplan has received the go-ahead. A minimum effort at achieving consensus as to what development is acceptable is essential.

The Planning Authority is unfortunately insensitive to public opinion. It is amply clear that it, and those who appoint most of its Board members, are on the same wavelength as the development lobby, which is hell-bent on making hay while the sun shines. At this point in time, it is the turn of the St George’s Bay area.

The project is obviously recommended for approval in the 43-page report from the Planning Directorate.

The basic point of contention with such large-scale projects is that they are considered in isolation. Most of them would never get off the drawing board (real or virtual) if the consolidated impact of all neighbouring projects (existing or in the pipeline) are taken into account. Earlier this week, I had the opportunity to address similar concerns to the EIA public consultation on the db Group ITS site project.

Five large-scale projects are earmarked for St George’s Bay. Each will generate considerable havoc from excavation throughout construction and right through operation in the whole St George’s Bay area. Cumulatively it will be hell. Who cares?

Way back in 2006, when the Strategic Environmental Assessment Directive of the EU was about to be implemented in Malta, the Lawrence Gonzi – George Pullicino tandem rushed through the approval of the Local Plans in such a manner as to ensure that the accumulated environmental impact resulting from their implementation was not scrutinised and acted upon. The present state of affairs is the direct result of that irresponsible Gonzi-Pullicino action 12 years ago.

The Environment and Resources Authority (ERA) occasionally tries to patch things up. For example, within the framework of the ITS EIA exercise ERA suggested that the traffic assessment of the ITS and the Villa Rosa projects be consolidated. This has, however, been avoided: a case of too little, too late.

So where do we go from here?

The development lobby is maximising its efforts to make hay while the sun shines. In reality, a consolidated mess is taking shape with massively built-up areas in a relatively restricted space punctured by high rises mimicking phallic symbols of all shapes and sizes spread all over the place. Pender Place has 23 floors. Mercury House will have 31. The ITS phallus will have a 37-floor residential tower. The Villa Rosa/Cresta Quay project will have more modest heights.

Next Thursday, the Planning Authority has the opportunity to scrutinise the proposal for this Villa Rosa-Cresta Quay project. We will see once more the extent to which the concrete lobby still holds the Authority by its balls – obviously where this is applicable.

 

published in The Malta Independent on Sunday – 18 February 2018

Is-sit tal-ITS f’Pembroke : l-art pubblika, profitti tal-privat

L-iżvilupp tas-sit preżentement okkupat mill-Istitut tal-Istudji Turistiċi f’Pembroke reġa’ fl-aħbarijiet. Is-settur pubbliku jipprovdi l-art filwaqt li l-Grupp dB jimpala l-euro, bil-miljuni.

Matul din il-ġimgħa l-media tkellmet dwar il-miljuni li qed jiġi miftieħem li jitħallsu għall-bejgħ eventwali ta’ sulari sħaħ fit-torrijiet tal-Grupp dB. Dawn m’humiex flejjes li ser jitħallsu għal xiri ta’ propjetà fuq il-pjanta, għax s’issa la hemm permessi u l-anqas għad m’hemm l-ebda pjanta ffinalizzata. L-awtoritajiet tal-ippjanar għadhom fl-istadji inizzjali fl-eżami tagħhom tal-proġett propost: l-Awtorità għall-Ambjent u r-Riżorsi (ERA) għadha kif bdiet il-proċess ta’ konsultazzjoni statutorja dwar l-Istudju tal-Impatt Ambjentali (EIA) li għandu għaddej sat-12 ta’ Frar. Minkejja li l-ERA għad tista’ tirrakkomanda tibdil, żgħir jew kbir, fil-proġett wara li tkun ikkunsidrat bir-reqqa l-EIA, qiesu li l-iżviluppaturi huma ċerti li mhu ser ikun hemm l-ebda konsiderazzjoni ta’ ippjanar jew ambjent li ser ixxekkel dak li bosta jqiesu li hu proġett żejjed u mhux meħtieġ.

Id-dokumenti ppreżentati għall-iskrutinju pubbliku huma sostanzjali u voluminużi. Imma possibilment fihom in-nieqes u għaldaqstant diġa ktibt lill-Awtorità tal-Ambjent u r-Riżorsi biex tirrimedja u tippubblika dak li ġie identifikat bħala nieqes s’issa.

Dokument ta’ interess li insibuh fuq is-sit elettroniku tal-ERA huwa l-Project Description Statement (PDS) li tħejja minn ditta (partnership) ta’ periti li ftit kienet magħrufa s’issa. Din id-ditta iġġib l-isem ta’ Landmark Architects u jirriżulta li titmexxa mill-ekx-Ministru tat-Trasport il-Perit Jesmond Mugliett.

Fil-paġna 5 ta’ dan id-dokument, il-Perit Mugliett jikteb hekk “Nhar it-2 ta’ Frar 2017, il-Gvern u s-soċjetà dB San Gorg Property Limited iffirmaw il-kuntratt għat-trasferiment tal-art li dwarha ħarġet sejħa pubblika għall-proposti. Kemm il-Gvern ta’ Malta kif ukoll is-soċjetà dB San Gorg Property Limited jaqblu li l-evalwazzjoni tal-proġett ta’ żvilupp m’għandhiex iddum iktar mill-perjodu minimu stabilit mill-leġislazzjoni tal-ippjanar. (On the 2nd of February 2017, the Government of Malta and dB San Gorg Property Limited signed the contract for the granting of the RFP site. Both the Government of Malta and dB San Gorg Property Ltd. agree that evaluation of the project development should not extend beyond the minimum time frames established by Planning Law.) Fil-fehma tiegħi dan ifisser li l-Gvern diġa rabat idejn l-Awtorità tal-Ippjanar dwar kif din għandha topera f’dan il-kaz.

L-iżviluppatur donnu mhux inkwetat li l-Masterplan imfassal għal Paceville ġie skartat u beda l-proċess biex dan jitfassal mill-ġdid u dan wara l-konsultazzjoni pubblika mqanqla li kellna lejn tmiem l-2016. L-awtur tal-PDS fil-fatt jinfurmana li “L-Gvern ta’ Malta u s-soċjetà dB San Gorg Property Limited komplew bin-negozjati, u eventwalment qablu li ma kienx fl-interess tal-proġett, tal-industrija Maltija tat-Turiżmu u tal-ekonomija Maltija li joqgħdu jistennew li jkun konkluż dan il-Masterplan.” (The Government of Malta and dB San Gorg Property Limited continued with negotiations, eventually coming to an agreement that it was not in the interest of the project, the Maltese Tourism Industry and the Maltese economy to wait for the conclusion of this masterplan.)

Dan, fil-fehma tiegħi jimmina l-proċess ta’ konsultazzjoni pubblika. Għax liema huma r-regoli u policies tal-ippjanar li l-Awtorità tal-Ippjanar ser isegwi fuq is-sit illum okkupat mill-Istitut tal-Istudji Turistiċi? Il-proposta diġa tidher ċar li tmur kontra dak li jipprovdi l-pjan lokali tal-2006 li hu applikabbli. Allura fuq liema kriterji ser tkun ivvalutata l-proposta ta’ żvilupp?

Xi żmien ilu konna infurmati li l-ebda żvilupp fl-inħawi m’hu ser jitħalla jibda sakemm ikun konkluż Masterplan ġdid għal Paceville. Dakinnhar kien emfasizzat li l-proposti dwar is-sit tal-ITS f’Pembroke seta jkun evalwat biss wara l-approvazzjoni tal-Masterplan ġdid għal Paceville.

Din hi wegħda li kienet skartata kompletament!

Kien ukoll ġie mwiegħed li l-Masterplan il-ġdid ma kienx ser ikun imniġġes minn kunflitti ta’ interess. Tgħid din il-wegħda ser tkun injorata ukoll?

 

ippubblikat fuq Illum : Il-Ħadd : 21 ta’ Jannar 2018

Pembroke ITS site : public land – private profits

 

The redevelopment of the site currently occupied by the Institute for Tourism Studies (ITS) in Pembroke is again in the news: the public sector is providing the land while the dB Group will rake in the profits – amounting to millions of euro.

During the week various media outlets focused on the millions being forked out for the eventual purchase of entire floors in the dB Group towers. These are not the price for purchase of property still on plan, because no permits have yet been issued, nor have the plans as yet been finalised. The examination of the proposed development by the planning authorities is still in its initial stages: the Environment and Resources Authority (ERA) has just kicked off the Environment Impact Assessment (EIA) statutory consultation period, which is scheduled to run until 12 February. Notwithstanding the fact that the ERA may recommend changes to the planned project as a result of its consideration of the EIA, it seems that the developers are sure that there will be no planning or environmental issues which can put the breaks to what most people consider an ill-advised project.

The documents presented for public scrutiny are voluminous, but possibly incomplete, and I have already written to ERA to complete the missing information gaps, at least those identified to date.

A basic document of interest, available on the ERA website, is the Project Description Statement (PDS) – the work of an as yet unknown partnership of architects going by the name of “Landmark Architects”. It transpires that this partnership is headed by former Transport Minister Jesmond Mugliett, who writes on page 5 of the PDS : “On the 2nd of February 2017, the Government of Malta and dB San Gorg Property Limited signed the contract for the granting of the RFP site. Both the Government of Malta and dB San Gorg Property Ltd. agree that evaluation of the project development should not extend beyond the minimum time frames established by Planning Law.” To my mind this signifies that the government has already tied the Planning Authority’s hands as to how it should operate in this case.

The developer is not (apparently) worried that the Paceville Master Plan was sent back to the drawing board after the agitated public consultation late in 2016. The author of the PDS, in fact, informs us that “The Government of Malta and dB San Gorg Property Limited continued with negotiations, eventually coming to an agreement that it was not in the interest of the project, the Maltese Tourism Industry and the Maltese economy to wait for the conclusion of this masterplan.”

Does this not undermine the whole consultation process? What planning rules and/or policies will the Planning Authority follow at the former ITS site? On what criteria will the development proposal be evaluated – it already clearly goes beyond what is permitted in the applicable 2006 local plan.

Some time ago, we were informed that no new developments in the area would be given the go-ahead until such time as a new draft Paceville Master Plan was launched. It was then emphasised that the proposals for the Pembroke ITS site can only be properly assessed when the Paceville Master Plan is in place.

This pledge has been blatantly ignored by the development proposal.

It was also pledged that the new proposed Master Plan will not be tainted by conflicts of interest as was the original one. Will this pledge also be ignored?

published in The Malta Independent on Sunday : 21 January 2018