L-aħdar: sens komun ambjentali

Iktar minn sentejn ilu, nhar l-20 ta’ Marzu 2017, il-Kunsill Eżekuttiv tal-Awtorità tal-Ippjanar irrifjuta applikazzjoni għal kontroll tal-iżvilupp intenzjonata biex tistabilixxi x’jista’ jinbena fuq art f’ Ta’ Durumblat il-Mosta, b’kejl ta’ 38,600 metru kwadru.

Ma kienitx sorpriża meta iktar kmieni din il-ġimgħa din l-applikazzjoni reġgħet tfaċċat fil-forma ta’ applikazzjoni ġdida fuq art ftit ikbar fid-daqs, din id-darba 40,500 metru kwadru. Il-proposta hi biex iż-żona kollha tkun żviluppata f’waħda residenzjali b’binjiet ta’ erba’ sulari, b’waħda minnhom parzjalment taħt il-livell tat-triq.

Il-ġlieda biex inħarsu l-ambjent jeħtieġ li nġedduha kuljum billi l-forzi tar-rebgħa qegħdin f’posizzjoni b’saħħitha li jibqgħu jippruvaw sakemm iġibuha żewġ.

Għadna taħt l-effett tal-eżerċizzju ta’ razzjonalizzazzjioni li kien implimentat taħt id-direzzjoni tal-ex Ministru tal-Ambjent tal-PN George Pullicino bir-riżultat li madwar żewġ miljun metru kwadru ta’ art barra miz-zona tal-iżvilupp (ODZ) ingħataw għall-iżvilupp. Dakinnhar, fl-2006, l-Opposizzjoni Laburista kienet ivvutat kontra din l-inizjattiva, imma hekk kif ħadet is-setgħa, konvenjentement insiet kollox. Huwa biss issa li bosta qed jirrealizzaw kemm hi kbira l-ħsara ambjentali li ser tkun ikkawżata minn dan l-eżerċizzju ta’ razzjonalizzazzjoni. Sfortunatament, ir-rimedji possibli għal din il-ħsara huma limitati. Is-sitwazzjoni hi agħar minħabba li l-Gvern, bi strateġija ċara ma jaġixxix. Għax hu konvenjenti li jistax jwaħħal fil-Gvern ta’ qablu għal din il-mandra.

Il-punt hu li ma għandna l-ebda ħtieġa ta’żvilupp massiċċ fuq art verġni, bil-konsegwenza li tisparixxi iktar art agrikola fil-periferija taż-żoni urbani tagħna, bil-possibiltà li jingħaqdu fiżikament il-lokalitajiet. Il-mistoqsijiet li qamu sentejn ilu meta konna ffaċċjati bl-applikazzjoni oriġinali għadhom hemm, mhux imwieġba. Dawn ġew injorati mill-iżviluppaturi u dan minħabba li l-applikazzjoni l-ġdida hi identika għal dik oriġinali.

Għalfejn iridu żvilupp daqshekk intensiv? Xi studji hemm li jkejlu l-impatt tal-proposti ta’ żvilupp fuq l-infrastruttura tal-inħawi? Iż-żona li hu propost li tkun żviluppata hi sostanzjali. Zona li kien jagħmel sens li tkun pulmun aħdar għall-Mosta ser tispiċċa mibnija b’mijiet ta’ residenzi u garaxxijiet.

Meta għandna Gvern li mhux kapaċi jieħu posizzjoni ċara kontra żvilupp esaġerat, l-Awtorità tal-Ippjanar ma tantx għandha fejn tiċċaqlaq u dan billi d-deċiżjoni bażika favur l-iżvilupp esaġerat ilha li ttieħdet mill-Parlament sa mill-2006. Li baqa’ li jkun deċiż huwa n-natura tal-iżvilupp permissibli, inkluż jekk ikunx permess bini intensiv inkella bini baxx b’ħafna spazji miftuħin madwaru.

L-iżvilupp propost fil-Mosta m’huwiex sostenibbli għax ma nistgħux nibqgħu nitilfu iktar raba’ bla bżonn.

Alternattiva Demokratika hi l-uniku partit politiku li konsistentment oppona l-pjan ta’ razzjonalizzazzjoni u emfasizza l-ħsara ambjentali li dan kien ser jikkawża fil-lokalitajiet tagħna. Dawk li jridu jħaxxnu bwiethom, ovvjament jaħsbuha mod ieħor. Dawk li jiddeċiedu, min-naħa l-oħra, b’mod konsistenti injoraw l-impatti ambjentali.
Din il-problema mhix waħda limitata għall-Mosta, imma hi mifruxa ma’ Malta u Għawdex. Kelli l-opportunità li niġbed l-attenzjoni għal diversi eżempji f’lokalitajiet oħra bħall-Marsaxlokk, il-Mellieħa, Ħ’Attard, Pembroke, San Ġiljan, tas-Sliema u diversi lokalitajiet oħra, fejn ir-rgħiba tħalliet issaltan.

Din hi kampanja favur is-sens komun, għax is-sens komun ambjentali hu aħdar. Huwa d-difiża tal-ġid komuni. Il-ħarsien tar-raba’ minn żvilupp mhux neċessarju hu essenzjali għax ma nistgħux nibqgħu nitilfu iktar art fi ġlieda mar-rgħiba. Hu mod kif inqegħdu fil-prattika dak li nipprietkaw dwar l-iżvilupp sostenibbli.

Meta jkollok daqshekk politiċi jipprietkaw kemm jemmnu fil-prinċipji tal-iżvilupp sostenibbli diffiċli li wieħed jifhem kif Alternattiva Demokratika hi prattikament waħedha fuq il-front politiku li jopponi l-iżvilupp esaġerat.

Il-ħarsien tal-ambjent hu ferm iktar minn eserċizzju ta’ tindif. Huwa dejjem tajjeb li jinġabar l-iskart mormi mal-kosta jew fil-kampanja. Li topponi l-iżvilupp esaġerat huwa tindif preventiv tal-periferiji urbani tagħna. Ir-residenti jeħtieġu l-appoġġ. Imma anke huma jeħtieġ li jifhmu li jekk ser jivvutaw bħas-soltu l-affarijiet mhux ser jinbidlu.

 

Ippubblikat fuq Ilum: Il-Ħadd 28 t’April 2019

Advertisements

Environmental common sense is green in colour

Over two years ago, on 20 March 2017, the Planning Authority’s Executive Council threw out a Planning Control application intended to determine the nature of permissible development in a stretch of land at Ta’ Durumblat Mosta having an area of 38,600 square metres.

It was no surprise that, earlier this week, the application was resubmitted to the Planning Authority in respect of a slightly larger area in the region of approximately 40,500 square metres. The proposal is to develop the whole site into a residential area subject to a proposed height limitation of three floors and a semi-basement.

The battle to defend our environment needs to be renewed every day, as the forces of greed are well placed to continue with their endeavours, until they succeed in gaining acceptance of their proposals.

The rationalisation exercise was carried out under the direction of former PN Environment Minister George Pullicino. It has resulted in around two million square metres of land outside the development zone (OZD) being given up for development – and the full impact is yet to be felt.

In 2006, the then Labour Opposition voted against this initiative, yet it conveniently forgot all about its stand when it was elected into office and it is only now that many are starting to realise the significant environmental impact of the rationalisation exercise. Unfortunately, the possibilities to remedy the damage in store are very limited and this limitation to act is further compounded by a government which (strategically) fails to act, as it is most convenient to be able to point fingers at your PN predecessors in government.

The point at issue is whether we need further large-scale development on virgin land, with the result of gobbling up more agricultural land on the periphery of our urban areas which will potentially merging neighbouring localities.

The queries raised two years ago – when the original application was submitted – are still unanswered. These queries have been ignored by the developers as the application that has been resubmitted is practically identical to the original one.

Why are the developers proposing so intensive a development? Do studies exist to assess the impacts which this proposal will have on the infrastructure of the area – which is substantial? Hundreds of residential units and garages will be constructed in an area when it would make more sense for it to remain as a green belt around Mosta.

Faced with a government which is reluctant to act against over-development, the Planning Authority does not have much elbow room for manoeuvre because, for all intents and purposes, the basic decision in favour of over-development has already been taken by Parliament – way back in 2006. What’s left to be decided is the nature and extent of the development. Whether, for example, the development would be intensive as proposed in the application or else low-density, such as limited to bungalows with a 25 per cent site coverage

The proposed development in Mosta is certainly not sustainable, as we cannot afford to lose more land to the current development spree.

Alternattiva Demokratika has been the only political party to continuously and consistently point out that the implementation of the rationalisation exercise will cause environmental havoc in our local communities. Those seeking to line their pockets obviously think otherwise. The decision-makers have also been consistent in ignoring environmental impacts.

This problem is not limited to Mosta but is spread all over the islands. I have had the opportunity to point out various other instances in Marsaxlokk, Mellieħa, Attard, Pembroke, St Julians, Sliema and various other areas where, once again, greed has won the day.

This is a campaign for commonsense to prevail, as environmental common sense is inevitably green in colour, in defence of the ecology and the common good. Protecting agricultural land from unnecessary development is essential as we cannot keep losing more land to greed. It is also the only practical way to implement sustainable development.

With so many political personalities proclaiming their adherence to basic principles of sustainable development, I fail to understand how Alternattiva Demokratika is practically on its own on the political front in consistently opposing over-development.

Protecting the environment entails much more than clean-ups. It is laudable to clean up the mess of rubbish accumulated along the coast or in the countryside but at this point in time campaigning against over-development is an exercise in preventively cleaning up the periphery of our urban areas. Residents need our support but they must, however, also note that if they vote as usual, they will be condemning themselves to more of the same.

 

published in The Malta Independent on Sunday : 28 April 2019

A gambit declined

 

The setting up of a pre-electoral alliance is a complex exercise. Alternattiva Demokratika recognised the strategic importance of forming pre-electoral alliances a long time ago – in fact, prior to the 2008 general election, it had (unsuccessfully) taken up such an initiative itself.

The actual result of the 2008 general election was so close that any pre-election alliance would have had a substantial impact on the final result. This was very clear in the polls commissioned and published in the run-up to that general election.  The difference in votes on a national level between the PN and the PL in the March 2008 general election was a mere 1580, with AD receiving 3810 votes first count votes.

When examining the possibility of forging a pre-election alliance there is generally a choice between two approaches to take: either a principle-based approach or a pragmatic one.

The principle-based approach for a pre-election alliance seeks a long-term view based on building bridges that can possibly withstand the test of time. A pre-election alliance based on principles is based on an agreed shared vision. Even if it is not all-encompassing, this can be easier for voters to identify with as it entails a positive proposal: the shared vision.

On the other hand, the pragmatic approach is one aimed solely at the desired result. It is arithmetically driven. It can signify the lumping together under one umbrella of all sorts of views with (possibly) a minimum common denominator.

The National Front pre-electoral alliance set up by Simon Busuttil and Marlene Farrugia  was, in my opinion, one of the latter. Not only did it include the Nationalist Party and the Democratic Party but also the fringe elements of the PN itself, which had previously been weeded out over the years as undesirables.

The National Front was a pragmatic exercise to the extent that an analysis of the actual votes cast clearly shows that the PD link with the PN resulted in no votes being added to the PN by the PD.  Some may argue, for example,  that votes cast for PD candidates in the fifth district (Marlene Farrugia’s home district),  helped the PN turning the tides on Labour by recapturing Labour’s fourth seat. This is not so, as the gain of an additional seat by the PN on the fifth district was exclusively due to boundary changes: the village of Marsaxlokk having been moved to the third district and it being substituted by the hamlet of Ħal-Farruġ from the sixth district.

The PN/PD alliance failed in its major arithmetic objective as it is clear that it failed to attract a significant number of disgruntled voters. Actually, it rather repelled them with its continuous negative messages and sent most of them back to Labour. Unfortunately, this failed attempt will dissuade any other attempt at alliance-building in the immediate future, as no political party enjoys being taken for a ride, as was Simon Busuttil’s party.

Declining the invitation to join  the National Front as an appendix to the PN  was the correct response from Alternattiva Demokratika. It was an exercise in foresight that has been proved right. Listening to “independent” journalists and self-centred intellectuals advocating the Busuttil/Farrugia National Front was a very sad experience, as these were the same people who should have taken the PN itself to task for its internal contradictions on issues of good governance. By endorsing the PN-led National Front, unfortunately, they ended up endorsing the PN’s misdemeanours when they should have been at the forefront of those insisting that the PN clean up its act before claiming any right to wear the suit of shining armour.

In another context, it was former PN Finance Minister Tonio Fenech who made the most appropriate statement earlier this week in the Malta Independent. Answering his own rhetorical question as to what the Nationalist Party stands for, Tonio Fenech replied: “The only true answer I can give is, I don’t know”.

And so say all of us.

published in the Malta Independent on Sunday – 18 June 2017

Sens komun: fil-Mosta u f’Marsaxlokk

 

 

Matul dawn l-aħħar ġranet, Alternattiva Demokratika kienet qed tikkampanja kontra żvilupp massiċċ li ġie propost kemm fil-Mosta kif ukoll f’Marsaxlokk.  Din hi kampanja li ilha li bdiet ħdax-il sena, u tibqa’ għaddejja,  kontra t-tkabbir taż-żona żviluppabbli proposta minn George Pullicino, dakinnhar Ministru responsabbli għall-ambjent u l-ippjanar għall-użu tal-art.

Nhar il-Ġimgħa, f’Marsaxlokk, kien ta’ sodisfazzjoni li s-Sindku Horace Gauci, elett f’isem il-Partit Laburista, ingħaqad magħna ta’ Alternattiva Demokratika waqt konferenza stampa b’appoġġ għar-residenti Tal-Marnisi Marsaxlokk.

Hi kampanja biex is-sens komun favur l-ambjent jipprevali fuq id-deċiżjoni li kien ħa l-Parlament fl-2006 meta l-Gvern immexxi mill-PN mexxa ‘l-quddiem proposta biex żewġ miljun metru kwadru ta’ art li kienu barra miż-żona ta’ żvilupp, ma jibqgħux iktar ODZ u minn dakinnhar jibdew jiffurmaw parti miż-żona ta’ żvilupp. Dan sar mingħajr ma ġew eżaminati l-impatti ta’ deċiżjoni bħal din, lejliet li kellha tidħol fis-seħħ id-Direttiva tal-Unjoni Ewropeja dwar il-kejl tal-impatti strateġiċi ambjentali. Li ma sarx dan l-kejl, ifisser li l-impatti kumulattivi tal-iżvilupp li kien qed ikun propost kienu kompletament injorati.

Nhar it-Tnejn 20 ta’ Marzu l-Kumitat Eżekuttiv tal-Awtoritá tal-Ippjanar ħa żewġ deċiżjonijiet kontrastanti dwar żewġ meded kbar ta’ art. Dwar l-ewwel waħda, art agrikola fil-Mosta tal-qies ta’ 38500 metru kwadru l-proposta bi pjan ta’ żvilupp kienet rifjutata filwaqt li dwar it-tieni waħda ukoll primarjament agrikola u b’qies ta’ 17,530 metru kwadru, l-propost pjan ta’ żvilupp kien approvat.

Fiż-żewġ każi ma sar l-ebda eżami tal-impatti soċjali, ekonomiċi u ambjentali u dan billi l-professjonisti tal-ippjanar li taw il-parir lill-Kumitat Eżekuttiv tal-Awtoritá tal-Ippjanar kienu tal-fehma li d-deċiżjoni tal-2006 tal-Parlament kienet kemm ċara kif ukoll finali. Sfortunatament ma dehrilhomx meħtieġ li jeżaminhaw dan minn lenti kritika.

Fl-2006, il-Parlament kien iddeċieda li dawn iż-żewġ miljun metru kwadru ta’ art ma kellhomx iktar ikunu meqjusa bħala barra miż-żona tal-iżvilupp (ODZ). Il-grupp parlamentari tal-PN kien ivvota favur din il-proposta, u dan jispjega l-għaliex dak li taparsi kkonverta favur l-ambjent, Simon Busuttil, għadu ma fetaħx ħalqu dwar dan kollu.  Imma l-Partit Laburista, dakinnhar fl-Opposizzjoni ma kienx qabel u kien ivvota kontra li din l-art tkun tista’ tingħata għall-iżvilupp. Għalhekk Joseph Muscat bħalissa qiegħed f’posizzjoni imbarazzanti.

Il-Partit Laburista għadu tal-istess fehma, jew bidel il-ħsieb? Għax issa waslet is-siegħa tal-prova. X’ser jagħmel? Għax anke jekk ikun meqjus li d-deċiżjoni tal-Parlament tal-2006 titfa’ ċerti obbligi fuq il-Gvern u fuq l-Awtoritá tal-Ippjanar, xorta hu possibli li l-impatt tal-iżvilupp massiv li ġie propost ikun imtaffi.

Id-deċiżjoni tal-20 ta’ Marzu tal-Kumitat Eżekuttiv tal- Awtoritá tal-Ippjanar li biha l-applikazzjoni dwar l-art fil-Mosta kienet rifjutat hu l-mod kif għandhom isiru l-affarijiet. Hi deċiżjoni li s-Segretarju Parlamentari Deborah Schembri għandha żżomm quddiem għajnejha meta l-każ ta’ Marsaxlokk jiġi quddiema biex tikkunsidra jekk tagħtix l-approvazzjoni tagħha. Jiena naħseb li s-Segretarju Parlamentari Schembri għandha tibgħat il-każ ta’ Marsaxlokk lura quddiem l- Awtoritá tal-Ippjanar biex ikun ikkunsidrat mill-ġdid.

Żvilupp massiv ta’ din ix-xorta m’għandux ikun possibli meta hawn tant propjetajiet residenzjali vojta. Anke f’Marsaxlokk stess l-aħħar ċensiment, dak tal-2011, juri li 18.7% tar-residenzi huma battala filwaqt li 5.9% tagħhom jintużaw biss kultant. Nistgħu nibqgħu nibnu bil-goff meta għandna din il-kwantitá ta’ propjetá vojta?

Għandna bżonn ftit sens komun fl-ippjanar ta’ l-użu ta’ l-art. Sens komun li jagħti piz u konsiderazzjoni tal-impatti fuq il-komunitá kollha qabel ma jittieħdu deċiżjoniiet bħal dawn.

Fiż-żewġ każi, l-Mosta u Marsaxlokk, qed nitkellmu dwar raba’ li kienet tinħadem u li issa intelqet minħabba l-pressjoni kkawżata mill-iżvilupp. Dan hu process li jeħtieġ li nwaqqfuh minnufih. Illum qabel għada.

 

ippubblikat f’ Illum –  2 t’April 2017

Green sense is common sense

 

In the last few days Alternattiva Demokratika-the Green Party- has been campaigning against over-development at both Mosta and Marsaxlokk. It is the renewal of an everlasting campaign, started 11 years ago against the increase in the development zone piloted by former Environment and Land Use Planning Minister George Pullicino.

In Marsaxlokk last Friday we were joined by Labour Mayor Horace Gauci who arrived at, and addressed an AD press conference in support of the residents of Il-Marnisi, Marsaxlokk, in view of the impact of the rationalisation exercise in the area.

It is a campaign to see green sense prevail over the rationalisation exercise, as a result of which, in 2006 on the proposal of a PN-led government, Parliament included around two million square metres of land within the development zone overnight. This was done without a strategic environment assessment having been carried out to examine the proposals. It was on the eve of the coming into force of the Strategic Environment Assessment EU Directive which, just days later, would have made such an assessment compulsory. Not carrying out such an assessment signifies that the cumulative impacts of development were ignored by not being factored into the decision-taking process.

On 20 March, the Planning Authority Executive Committee took two contrasting decisions in respect of two large tracts of land. Regarding the first – 38,500 square metres of agricultural land at Mosta –  the scheme for a development proposal was turned down, while in respect of the second – 17,530 square metres of largely agricultural land in Marsaxlokk – the proposal for development was approved.

In neither case was any assessment of the social, economic and environmental impact carried out, as the professional land-use planners advising the Executive Committee of the Planning Authority consider that Parliament’s decision in 2006 was definite and any assessment unnecessary. Unfortunately they did not think it appropriate to examine the matters before them critically.

In 2006, Parliament had decided that this two million square metre area of land, formerly considered as ODZ land, was henceforth to be part of the development zone. The PN Parliamentary group had  voted in favour of this proposal, which is why the pseudo-environmental convert Simon Busuttil is completely silent on the issue. However, the Labour Party Opposition voted against the proposal, thus placing Joseph Muscat in an awkward position today.

Has the Labour Party changed its views? The chickens are now coming home to roost.

When push comes to shove, and notwithstanding the PN mantra that “ODZ is ODZ”, the PN always seeks to consent to ODZ development, as long as such development is given the go-ahead when it is in the driving seat!

But what about the Labour Party today? Even if it factors in the views of those who maintain that the 2006 decision ties its hands, it can certainly take mitigation measures that would substantially reduce the negative impact of the 2006 parliamentary decision which favours such massive over-development.

The decision of the Executive Committee of the Planning Authority on the 20 March to reject the proposal for the development of the tract of land in Mosta is the way forward. It should be taken on board by Parliamentary Secretary for land use planning Deborah Schembri when the Marsaxlokk case is placed on her desk for her consideration. I respectfully ask Ms Schembri to request the Planning Authority to reconsider its decision and hence send it back to the drawing board.

The proposed reconsideration should be undertaken primarily because such massive development is not required: it is not necessary to sacrifice so much agricultural land. (I am informed that on the site there is also a small stretch of garigue with a number of interesting botanical specimens.) The results of the 2011 Census indicated that 18.7 per cent of Marsaxlokk’s housing stock was then vacant and 5.9 per cent of it only in occasional use.  Why should we keep adding to the vacant housing stock through proposals for massive development projects?

We need some green sense in the planning of land-use. We need some common sense in considering the impact on the whole community before far-reaching decisions are taken.  In both cases mentioned above, the land that has been the subject of proposed  development schemes is agricultural land that has fallen into disuse as a result of development pressures. This process should be reversed forthwith, and the sooner the better: it is only common sense.

published in The Malta Independent on Sunday – 2 April 2017

Il-ħut fil-baħar ta’ Sandro Chetcuti

Fi stqarrija li ħarġet l-Assoċjazzjoni tal-Iżviluppaturi, bi tweġiba ovvja għall-konferenza stampa li jiena indirizzajt il-bieraħ fMarsaxlokk, Sandro Chetcuti qed jiddefendi lil min xtara l-ħut fil-baħar.

Għax hekk ġralu min xtara art li l-Parlament fl-2006 approva biex tkun tajba għall-bini, bħalma għamlu dawk li xtraw l-art fil-Mosta (Torri Cumbo) u Marsaxlokk (Marnisi), fl-aħbarijiet fdawn il-ġranet.

Meta fl-2006 il-Parlament bil-voti favur tal-Membri Parlamentari Nazzjonalisti u bil-voti kontra tal-Membri Parlamentari Laburisti approva li żewġ miljun metru kwadru ta art minn ODZ saru parti miżżona ta żvilupp ma iddeċiediex xseta jinbena fuqhom. L-anqas ma iddeċieda l-għoli li seta jinbena.

Imma min kellu l-art f’ħafna każi fassal it-toroq u beda jbiegħ il-plots. U għamel kemxa ġmielha!

Min approva fejn ser jgħaddu t-toroq?

Ħadd. Tant li meta per eżempju nhar l-20 ta Marzu l-Kumitat Eżekuttiv tal-Awtoritá tal-Ippjanar kien qed jiddiskuti l-applikazzjoni tal-Mosta (dawk it-38,500 metru kwadru ħdejn it-Torri Cumbo) wieħed mill-membri tal-kumitat qal li l-applikanti ippruvaw jorbtu idejn l-Awtoritá billi fasslu t-toroq u qasmu l-plots bdawn it-toroq qabel ma ittieħdet id-deċiżjoni.

Issa xjiġri jekk l-Awtorita tal-Ippjanar tiddeċiedi (kif għandha kull dritt li tagħmel) li tfassal it-toroq bmod differenti? Jew inkella jekk tiddeċiedi li l-art għandha tinbena bdensitá baxxa, bsular wieħed biss?

Dan kollu Sandro ma jgħidux. Għax min fittex li jbiegħ l-art daħaq bin-nies meta qassamhom fi plots kif ried hu u mingħajr ma kellu f’idejh il-permessi tal-ippjanar biex ikun jista jagħmel dan.

Xtraw il-plots meta ma kellhom l-ebda konferma dwar xjista jinbena fuqhom. L-anqas biss ma kellhom konferma li l-plot li xtraw kellha faċċata mat-triq.

Għalhekk xtraw il-ħut fil-baħar.

 

A farce in the making

external-emergency-plan-censored

 

Public consultation on the Delimara operational permit has commenced. This permit has to be issued in terms of the provisions of the EU Directive  on Integrated Pollution Prevention and Control (IPPC).

Feeding this public consultation exercise, last week the Environment and Resources Authority released 293 reports detailing information on different aspects of the Delimara power station. These reports are available on the authority’s website as well as at the offices of Marsaxlokk and Birżebbuġa local councils. They run into thousands of pages – varying from those which are very short to others which are substantial in length.

Originally, the public consultation exercise was planned to last 30 days – the minimum time  established by law. After a number of protests, this was increased to 40 days, which is still too short,  given the substantial amount of information that must be digested and analysed. Common sense should have dictated a much longer consultation period as the lack of sufficient time to examine the information released will bring into question the validity of the whole exercise.

The  reports require considerable time to be examined in order that their contents are understood in their proper perspective. Most of these reports were submitted to the Environment and Resources Authority many months ago and in the intervening period have been examined by officials of the Authority, who, in a number of cases, requested amendments or additions. These changes were identified by the Authority’s officers as a result of their examination of the said reports over a number of months.

It stands to reason that the Environment and Resources Authority is, on the basis of its own work,  fully aware that the real time required for  this public consultation would be in the region of four months and that anything less is insufficient.

There is, however, one exception. The report entitled “External Emergency Plan” drawn up by the Civil Protection Department, has been censored. A whole section has been removed and, as such, is not being subjected to the current public consultation exercise. Page 21 of the report contains the tile of the section : Section B Operational. On the following page we then have a note which informs us that “Information in the Operational Section (Section B) of this document is being withheld from publication on grounds on national security”.

This is a farce. The most important part of the document that requires dissemination and feedback has been withheld. This report should have been placed in the public domain in its entirety, as it is essential for those members of the public who are interested (or preoccupied) on the issue as they live too close for comfort to the Delimara power station. They  need the whole report in order to be informed and thus be in a position to give their reactions. Familiarity on the part of Marsaxlokk and Birżebbuġa residents with the Operational Section of the External Emergency Plan would eventually be put into use in the civil protection drills and simulation exercises which have to be organised by the Civil Protection Department on a regular basis at both Marsaxlokk and Birżebbuġa.

The Civil Protection Department leadership team should realise, even at this stage, that the local population must own the operational plans. These plans will not work if the local population is not aware of at least the basic contents of these plans.

The public consultation process is a basic and essential component of the workings of a democratic society. Tampering with the required information, or unnecessarily restricting the consultation period, will transform it into a farce.

It is for these reasons that the Delimara power station consultation process is a farce in the making!

published in The Malta Independent on Sunday – 30 October 2016

Wara t-tejatrin ta’ Singapore …………….. lil hinn mill-partiġjaniżmu politiku

Delimara floating gas stirage terminal

 

Qed joqrob il-jum li fih it-tanker għall-ħażna tal-gass tal-power station jidħol u jitqiegħed fil-Port ta’ Marsaxlokk. Qed jgħidulna li dan ser ikun temporanju, jiġifieri għal ftit taż-żmien, sakemm jitlestew l-istudji dwar il-pipline tal-gass bejn Sqallija u Malta. Ovvjament trid iżżid ukoll iż-żmien biex il-pipeline jitqieghed f’qiegħ il-baħar inkluż ukoll il-perjodu tal-finanzjament, tendering u commissioning. Mhux xahar u tnejn.

Kemm ser ikun twil dan il-perjodu temporanju? Jiddependi mix-xogħol li sar diġà. Peró ma neħodiex bi kbira jekk dan iż-żmien ikun bejn 5 u 8 snin.

Sadanittant hemm il-ħtieġa li jkun ikkunsidrat il-permess operattiv tal-power station taħdem bil-gass f’Delimara. Dan il-permess ikun irid jissodisfa tlett tipi ta’ direttivi/regolamenti. Dawk dwar l-impjanti industrijali, dawk dwar l-impatti ambjentali (IPPC – Integrated Pollution Prevention and Control) u dawk dwar il-ħarsien minn inċidenti industrijali u l-impatti kemm ambjentali kif ukoll dawk ta’ protezzjoni ċivili (Direttivi ta’ Seveso).

Dan kollu jkun ikkunsidrat mill-Awtorità tal-Ambjent u Riżorsi flimkien ma’ awtoritajiet oħra, prinċipalment id-Dipartiment tal-Protezzjoni Ċivili u l-Awtorità għall-Ħarsien tas-Saħħa fuq il-Post tax-Xogħol. Imma ser ikun hemm ukoll bla dubju ħtieġa  ta’ eżami sewwa ta’ issues ta’ navigazzjoni minn Trasport Malta minħabba kemm it-tanker stazzjonarju (marbut mal-moll) fil-bajja ta’ Marsaxlokk kif ukoll minħabba li madwar 8 darbiet fis-sena ser jidħlu tankers bil-ħtiġijiet tal-gass skond kemm tkun qed tikkonsma gass il-Power Station ta’ Delimara.

Dawn huma kollha affarijiet li ġew diskussi f’ċerta dettall madwar sentejn ilu meta kien qed ikun diskuss il-permess ta’ żvilupp quddiem il-MEPA. Dakinnhar kien intqal li dawn kollha kienu affarijiet li riedu jkunu deċiżi iktar tard. Preċiżament issa hu dak il-mument, matul dawn il-ġimgħat u xhur li ġejjin.

Ser naraw matul il-ġimgħat li ġejjin dwar il-ħtieġa ta’ sigurtà huwa u jkun trasferit il-gass mit-tankers ġejjin u sejrin għal ġot-tanker stazzjonarju. Jekk hux veru li għal ċertu ħin il-port ikun jeħtieġlu illi jkun magħluq u kif dan (jekk minnu) ser jeffettwa l-operat tal Freeport u tas-sajjieda.

Irridu naraw kemm il-miżuri ta’ sigurtà fl-operazzjoni tal-power station huma f’posthom u xi drills ser ikunu meħtieġa (inkluż il-frekwenza tagħhom) biex ikun assigurat illi l-popolazzjoni residenzjali fil-viċinanzi tkun imħejjija għal kull eventwalità, anke jekk remota.

Wara l-inċidenti ta’ tmiem il-ġimgħa fil-ħruq tan-nar tal-festa ta’ Marsaxlokk bla dubju jridu jittieħdu prewkazzjonijiet ħafna iktar biex ikun assigurat li dawn it-tip ta’ inċidenti, jekk iseħħu, jinżammu l-bogħod kemm jista’ jkun mill-power station ta’ Delimara u l-ħażna tal-gass.

Dan kollu dwaru hemm l-obbligu li jkun hemm konsultazzjoni pubblika mar-residenti effettwati, dawk ta’ Marsaxlokk prinċipalment, imma probabbilment ukoll dawk ta’ Birżebbuġa.

L-operazzjoni tal-power station bil-gass bla dubju ser tnaqqas it-tniġġż tal-arja u b’mod ġenerali ittejjeb l-impatti ambjentali. Il-kostruzzjoni tal-pipe tal-gass eventwalment tnaqqas u tbiegħed il-perikli. Imma sa ma jasal dak il-jum, il-possibiltà tal-perikli, anke jekk remoti xorta qegħda wara l-bieb tagħna.

Lil hinn mill-partiġġjaniżmu politiku għandna l-obbligu li nassiguraw li l-affarijiet isiru sewwa. Biex dan isir għandna l-obbligu li neżaminaw kull pass li jsir. Għax b’hekk biss kulħadd joqgħod attent li jagħmel xogħolu sewwa.

ippubblikat fuq iNews : it-Tlieta 2 t’Awwissu 2016

L-istorbju madwarna

noise_pollution

Nhar il-Ġimgħa li għaddiet, kmieni fil-għodu, bosta residenti ta’ Marsaxlokk u Birżebbuġa qamu maħsudin bi ħsejjes li bdew jinstemgħu għall-ħabta tas-sitta ta’ fil-għodu, liema ħsejjes baqgħu għaddejjin għal ftit minuti. S’issa, wara li għaddew iktar minn tlett ijiem għad mhux magħruf x’kien il-kawża ta’ dawn il-ħsejjes ħlief li dawn oriġinaw mill-inħawi tal-power station ta’ Delimara.

Għar-residenti ta’ Birżebbuġa din mhiex xi esperjenza ġdida għax f’Birżebbuġa  ilhom is-snin jisimgħu l-ħsejjes matul il-lejl: ħsejjes ġejjin mid-direzzjoni tal-Port Ħieles. Ħsejjes ikkawżati minn containers li jaħbtu jew jistabtu huma u jkunu qed jiġu mċaqalqa minn post għall-ieħor, inkella ħsejjes ikkawżati mill-generators tal-vapuri mal-mollijiet tal-Port Ħieles.

Ir-residenti ta’ Birżebbuġa, kif ukoll dawk ta’ diversi lokalitajiet fil-madwar, kemm matul il-lejl kif ukoll matul il-jum iridu jissaportu ukoll il-ħsejjes tal-ajruplani nieżla għall-mitjar Internazzjonali ta’ Malta fil-Gudja. Dawn l-ajruplani ħafna drabi jkunu l-iktar qrib il-bini meta jkunu għaddejjin minn fuq iż-żona residenzjali  tal-Papa f’Birżebbuġa.

Ir-residenti tal-Isla (u dawk ta’ Bormla) ilhom jilmentaw ukoll mill-ħsejjes matul il-lejl ġejjin mit-Tarżna ta’ Palumbo. Ħsejjes ġejjin mill-grit blasting li jkun għaddej matul il-lejl fit-tarżna, inkella minn xogħol ta’ tiswija ta’ vapuri jew ta’ oil rigs. Ħsejjes li ma jħalluhomx jorqdu.

Pajjiżna hu żgħir fid-daqs. L-ispazju li naħdmu fih hu ristrett u allura kull ħidma li issir fih bil-fors li jkollha impatt fuq l-inħawi tal-madwar li huma viċin wisq ta’ xulxin.

Uħud qed jargumentaw li dawn l-ilmenti kollha kontra l-ħsejjes huma ta’ theddida għall-għixien tal-familji li jiddependu għall-ħobża ta’ kuljum tagħhom mit-Tarżna ta’ PaIumbo, inkella mill-Port Ħieles jew mill-mitjar Internazzjonali tal-Gudja.

Għall-bosta snin l-awtoritajiet tal-pajjiż (kif ukoll il-management ta’ dawn l-azjendi) ġew jaqgħu u jqumu mill-fatt li l-gwadann ekonomiku ta’ dawn l-azjendi qed isir għad-detriment tar-residenti madwarhom, li lejl u nhar iridu jissaportu impatti kbar fuq ħajjithom. Impatti li qed iħallu effett fuq saħħithom u l-kwalità tal-ħajja tagħhom u tal-familji tagħhom.

Il-mistoqsija li teħtieġ tweġiba hi : kemm jagħmel sens li din il-ħidma issir daqshekk viċin ta’ żoni residenzjali? It-tweġiba, ħafna drabi tkun li din l-attività ekonomika ilha għaddejja s-snin u li m’hemm imkien iktar fejn issir. Allura, qiesu jridu jgħidu li m’hemm xejn x’tagħmel. Jgħidulna li Malta ajruport wieħed għandna u li l-faċilitajiet għat-tarznari jew għall-Port Ħieles ma hemm imkien iktar fejn isiru jekk mhux fejn ġja qegħdin. Sfortunatament dan hu kollu minnu bħalma hu minnu ukoll li dawn il-faċilitajiet ġew żviluppati meta ħadd ma kien jagħti kaz tal-impatti fuq ir-residenti.

Imma allura, nistaqsi, jekk ta’ qabilna ma kienux jagħtu kaz għandna nibqgħu aħna ukoll ma nagħtux kaz? Jekk il-Gvernijiet u l-awtoritajiet tal-bieraħ għalqu għajnejhom u widnejhom, dawn għandhom jibqgħu b’għajnejhom u widejhom magħluqa illum ukoll? L-ewwel pass jista’ jkun li dawn l-azjendi, matul il-lejl, iwaqqfu l-ħidma tagħhom li tikkawża l-istorbju.

Il-Gvern mhux ser jiċċaqalaq jekk in-nies tibqa’ lesta li tissaporti. Jekk in-nies ma titkellimx iktar l-ebda Gvern jew awtorità m’hi ser tiċċaqlaq.

Jiddependi minnek ukoll li qed tisma’ jew taqra dawn il-kelmtejn jekk jittieħdux passi. Mela jekk xbajt tissaporti qum minn hemm u tkellem. Jekk ma tagħmilx hekk, ikun inutli toqgħod tgorr, għax ser jibqgħu jgħadduk biż-żmien.

Il-gass għal Delimara: bil-vapur jew bil-pipeline?

laying the pipeline

 

X’ifisser id-dewmien fil-proġett tal-Gvern biex il-produzzjoni tal-elettriku taqbleb għall-gass?

Qed jissemmew ħafna raġunijiet. Fosthom il-qagħda finanzjarja tal-kumpanija Gasol plc, l-kumpanija barranija ewlenija li tifforma parti mill-Electrogas Malta Consortium inkarigat mill-proċess. L-Electrogas Malta Consortium huwa magħmul misSiemens Project Ventures GMBH (20%), SOCAR Trading SA (20%), Gasol plc (30%) u GEM Holdings Ltd (30%).

Qed jissemma ukoll li hemm kunflitt bejn l-obbligi li daħal għalihom il-Gvern ma dan il-Consortium u s-Shanghai Electric Power.

Minn diversi indikazzjonijiet jidher li l-Gvern ta’ Joseph Muscat beda juri interess partikolari fil-pipeline tal-gass minn Sqallija. Fil-fatt ilu ftit ma jissemma t-tanker tal-gass, kemm ġewwa l-port kif ukoll barra mill-port. Xi zmien ilu kienu qalulna li qed isir l-studju marittimu konness mal-proġett. S’issa ma nafx jekk hux konkluż, inkella jekk dan waqafx meta beda jidher ċar li l-problemi konnessi mal-wasla tal-gass bil-vapuri huma enormi.

Jekk dan hu l-każ ikun ifisser li qed isir il-progress u li d-diskussjoni pubblika qed tħalli l-frott, avolja wara ħafna żmien. Ikun għaqli kieku l-Gvern ikollu l-kuraġġ li jagħti l-informazzjoni vera ta’ x’qiegħed jiġri. Għax jekk il-Gvern ta’ Joseph Muscat hu kapaċi jirrealizza li kien żbaljat dwar it-tanker tal-gass fil-Port ta’ Marsaxlokk tkun rebħet ir-raġuni.

Igawdi l-pajjiż kollu u jitnaqqas drastikament il-periklu għall-komunitajiet ta’ Marsaxlokk u Birżebbuġa.

Mhux dgħjufija li tagħraf li kont żbaljat.