From Dubai to Singapore

Last week, the President of the Republic, laying out the programme for the new government in what is known as the speech from the throne, emphasised that the environment is a core value for this government. Reading through the speech prepared by government, his Excellency was clear by dwelling on a number of different topics of considerable environmental importance.

However, Dr Vella was unfortunately not advised as to how and when the government intends to address its continuous contradictions in its drive to shift its focus from the infrastructure to the environment.

The elastic environmental politics presented by this government ranges from more flyovers to achieving carbon neutrality, simultaneously being dependent on two interconnectors tapping the Sicilian energy market.

Previous governments led by the Labour party had sought to transform Malta into another Dubai, that is a land of high rises and extensive land reclamation . The attempt at Dubai-ification embarked on by the Muscat led government will apparently now be transformed into a Singaporization as emphasised by infrastructure Minister Aaron Farrugia. This is the implementation of the policy of continuity which his Excellency was apparently not sufficiently advised about.

The current crop will do their best to outshine their predecessors. Since there is not much more land to ruin, they have therefore turned their gaze towards the sea which they will be ruined in due course.

Preliminary studies carried out in the past had identified the areas in Maltese waters where land reclamation could be considered, subject to more in-depth studies. The coastal areas identified and studied are those along the  Magħtab/Baħar iċ-Ċagħaq coastline and the Xgħajra/Marsaskala coastline. These are the coastal zones which have to be watched and protected.

The basic question to ask before embarking on planning any land reclamation projects is: what do we need land reclamation for? In the past land was reclaimed to construct the Freeport or to protect the coast at Msida, Gżira and elsewhere.

If any new pressing need is identified one should carefully consider them.

The Netherlands used land reclamation successfully to adequately manage its low-lying land. Hong Kong made use of land reclamation to create high value land required for its airport on the Chek Lak Kok island. Through land reclamation Singapore expanded its container port, an essential cornerstone in its economy.

The way to go about tackling land reclamation is through serious public consultation. Labour in government has, so far, only consulted developers on land reclamation. It has, in the recent past, only consulted those who were seeking new ways to make a quick buck! These are the fourth-floor guys who are only interested in making hay while the sun shines.

If government is serious about land reclamation it should immediately publish a list of its proposed projects. This should be accompanied by a draft national land-reclamation strategy for public consultation. At this point consultation should not be with the speculation lobby: it has already been extensively consulted. Consultation at this stage should primarily be with environmental NGOs and the coastal communities, in particular those directly impacted.

Having said the above I do not think that land reclamation is or should be a priority. Rather, the priority should be the restructuring of the construction industry: specifically cutting it down to size and putting it to good use.

The country would be economically, environmentally and socially much better off if the construction industry is assisted in its much-needed restructuring. It would undoubtedly need to shed labour which can be absorbed by other sectors of the economy. Retraining would be required to ease the entry of the shed labour force into other economic areas.

After years of haphazard and abusive land-use planning, land reclamation is the last thing we need!

published in The Malta Independent on Sunday : 15 May 2022

The Metro consultation: taking us for a ride

In 2008 Professor Mir Ali from the School of Architecture, University of Illinois at Urbana-Champaign, published a paper entitled “Urban Design Strategy Report on Tall Buildings in Malta.”

Professor Ali comments on the lack of mass transport facilities in Malta and links the functionality of tall buildings with the availability of mass transport facilities. He emphasises that: “Once there is a BRT or MRT system, integration of tall buildings with transportation can result in high efficiency, consolidation of services and a better urban life.” BRT signifies Bus Rapid Transit System. MRT signifies Mass Rapid Transport.

The need for a mass transport network has been felt for a long time. Greens in Malta have been emphasising that it is one of various solutions to address transport issues in the Maltese islands.

Government’s announcement last weekend on a three-route metro is just a first step. Greens definitely agree with the objective though not with the specifics proposed. As ARUP emphasised, government’s massive expenditure on long-term road building will not solve anything. Most of it is money down the drain.

Government’s announcement has only presented a sketch of a solution. The proposal needs to be much more detailed than that. While the identification of the routes as well as the location of the stations is definitely important information, we need more analytical information to digest.

ARUP identified potential routes and stations on the basis of studies. It is said that studies were also carried out on various options, as a result of which ARUP discarded the Bus Rapid Transit, the surface tram, the elevated light metro and combinations. We need to be able to digest these studies to understand why ARUP have discarded alternative solutions. All studies carried out by ARUP should be available for examination in the Metro public consultation. If this is not possible what is the purpose of a public consultation?

The proposal for a Metro should not be an excuse for developing open spaces as has already been pointed out with reference to the proposed B’Kara and Pembroke Metro stations. We already have too few open spaces.

Proposals have to be analysed within the wider context of transport policy in Malta.  Specifically private car use must be substantially reduced for any mass transport proposal to be economically feasible! This must be clear even at this stage. It is inevitable, but government is conveniently being silent on the matter! Has ARUP advised on the matter in its feasibility studies? We have a right to know.

It is the intention to utilise the stations to attract metro users from the surrounding areas. Some, living nearby, will come on foot. Others living or working slightly further away may come by private car, by bus or by bike.  Most potential metro stations do not have parking areas around them. This signifies that it is essential that more emphasis is laid on the interaction between the proposed Metro and local and regional transport.

The metro’s functioning has to be seen within the existing urban context. This is very relevant to the debate but unfortunately the detailed advice which government has received in this respect has not been divulged. Just one tit-bit of information has inadvertently emerged. When asked as to why the Metro will not make it to Gozo, it was stated that there is not sufficient population on the sister island. This begs the question: how come then that a tunnel is planned below the sea to link the two islands?

The announcement further informed us that most of the Metro will be underground with only a small stretch being above ground for topographical reasons.  Depending on the size of the tunnels between the metro stations this could generate a substantial amount of inert waste. An estimated excavation volume of 4.9 million cubic metres, presumably measured in situ, is indicated. Once excavated this would amount to around 8.6 million cubic metres after taking account of the increase in volume after excavation. This is a substantial amount of inert waste which, as already hinted, can only be utilised in land reclamation projects. For comparative purposes 8.6 million cubic metres of inert waste is close to the amount that was used in the whole Freeport project at Kalafrana for land reclamation purposes!

I am not aware of any land reclamation currently required in the national interest. We cannot be forced into land reclamation as the only solution to dispose of the inert waste generated by the Metro project.

Excavation of an underground Metro does not only generate excessive inert waste. It also endangers our historical heritage: in particular when excavating below, around or close to national monuments in Valletta, Mosta, Balluta and elsewhere. Excavation is also proposed next to ecologically sensitive sites.

This is definitely not on.

Proposed solutions above ground have to be examined in detail too and discussed as part of the public consultation. A hybrid metro-tram system mostly above ground, and/or a Bus Rapid Transit system, are other possibilities which should make it on the table of any serious public consultation. They do not generate inert waste, can be implemented in a shorter time frame from that proposed by ARUP and cost a fraction of the proposed outlay. In addition, substantially less environmental impacts are involved. Any selected solutions should respect our historical and ecological heritage.

Through constructive criticism we can explore alternative solutions which are being deliberately shut out with a stage-managed consultation. We need more than PR stunts: logos and flashy video clips are not the information we need for a mature public consultation. Government must put all its cards on the table. The ARUP studies must be subject to public scrutiny. Otherwise, the public consultation is taking us for a ride.

published in The Malta Independent on Sunday : 10 October 2021

Il-metro: ħtieġa ta’ informazzjoni

Fi tmiem il-ġimgħa l-Gvern ħabbar il-posizzjoni tiegħu dwar il-Metro. Imma l-istudji li għandu ma ippubblikahomx.

Kif jista’ jkollna diskussjoni matura dwar il-proposta jekk il-Gvern iżomm għalih l-informazzjoni li għandu?

Naqblu dwaril-ħtieġa urġenti li l-pajjiż ikollu mezz ta’ transport tal-massa. Dan ilna ngħiduh bħalma ilna ngħidu lil-infieq massiċċ tal-Gvern fuq it-toroq ma solva xejn. Kien ħela ta’ flus. Anke l-konsulenti tal-Gvern qed jgħidu li minkejja l-infieq fl-infrastruttura tat-toroq għad għandna problem kbar.

L-issue l-kbira li teħtieġ diskussjoni hi dwar jekk il-metro jkunx taħt l-art inkella jekk ikunx prinċipalment f’livell tat-triq. Prinċipalment dan qed ngħidu minħabba l-iskart li ser ikun ġġenerat kemm-il darba l-metro jsir taħt l-art.

Jekk, kif indika l-Gvern, l-għażla tmur favur metro taħt l-art l-iskart ġġenerat ser jispiċċa radam fil-baħar, reklamazzjoni sfurzata. Aħna ma naqblux ma dan u jidhrilna li għandu jsir sforz biex dan ikun evitat.

L-għażla ta’ metro f’livell tat-triq [jeżistu ukoll sistemi hybdrid: metro/tramm] jelimna l-parti l-kbira tal-iskart, inaqqas iż-żmien tal-implimentazzjoni, inaqqas l-ispiża u jkun ta’ benefiċċju ambjentali ferm ikbar.

Fid-dawl ta’ dan hu meħtieġ li jkunu ppubblikati b’mod urġenti ir-rapporti u l-istudji kollha li saru u dan għax sa llum ftit li xejn ġiet ippubblikat informazzjoni li tista’ tkun ta’ għajnuna għad-diskussjoni pubblika. Il-logos u l-videos huma ‘PR’, mhux informazzjoni. Ma jistax ikollna diskussjoni matura dwar dawn il-proposti jekk  l-informazzjoni li għandu l-Gvern iżommha għalih u din tibqa’ moħbija mill-iskrutinju pubbliku.

Il-mina mhix soluzzjoni: hi problema

Il-mina li hi proposta taħt qiegħ il-baħar bejn Għawdex u Malta ser ikollha impatti negattivi konsiderevoli kemm fuq Għawdex kif ukoll fuq Malta. L-iżjed wieħed ovvju hu l-ġenerazzjoni ta’ madwar miljun u nofs metru kubu ta’ radam li ser jispiċċa fil-baħar. Dan ser jagħti bidu għal ħmar il-lejl ambjentali ieħor: għax l-iżviluppaturi ma baqgħalhomx fejn “jiżviluppaw” fuq l-art! Qed ifittxu l-ispazju. L-Awtorità dwar l-Ambjent u r-Riżorsi diġa identifikat fejn dan jista’ jsir. Mhux ta’ b’xejn li r-residenti tax-Xgħajra qed jirvellaw.

Il-problemi assoċjati mal-mina proposta huma bosta. Art agrikola madwar il-punti tad-dħul, fuq iż-żewġ naħat, kemm f’ Ta’ Kenuna fil-limiti tan-Nadur kif ukoll ħdejn

L-Għerien fil-periferija tal-Mellieħa u ma tul il-wied tal-Pwales ser ikollha tagħmel il-wisgħa. Din ser tispiċċa tkun trasformata f’toroq kif ukoll f’faċilitajiet għall-kontroll tad-dħul fil-mina. Magħhom imbagħad jiżdiedu pompi tal-petrol, kull naħa tal-mina.

Hu ċar, minn dak magħruf s’issa, li d-dħul għall-mina min-naħa ta’ Malta ser ikun viċin ħafna tal-ilma tal-pjan tal-Miżieb, jekk mhux dritt minn ġo fih ukoll! Dan l-ilma tal-pjan hu f’kundizzjoni tajba, l-aħjar wieħed fil-gżejjer Maltin. Din kienet ukoll waħda mir-ragunijiet ewlenin l-għaliex fil-passat riċenti kellhom ikunu abbandunati żewġ proġetti kbar fl-inħawi, dak tal-golf course u ieħor konness mat-toroq (in-network TEN-T).

Għandu jingħad ukoll li volum kbir ta’ traffiku ser ikun iġġenerat u dan ser jgħaddi viċin ħafna tar-riżerva naturali tas-Simar fix-Xemxija. Il-ħsejjes, id-dwal u t-tniġġiż tal-arja ser ikollhom impatt negattiv konsiderevoli fuq ir-riżerva, b’mod partikolari matul il-lejl, ħin li fih in-natura ukoll tfittex li tistrieħ.

Dawn il-problemi li inevitabilment jinħolqu mill-mina għandhom iwasslu lil min hu rasu fuq għonqu biex ifittex soluzzjoni alternattiva biex titjieb il-konnettività bejn Għawdex u Malta. Soluzzjoni li tevita dawn il-problemi u iktar.

Ħa nkun ċar: il-konnettività bejn il-gżejjer ta’ Għawdex u Malta teħtieġ titjib konsiderevoli: is-soluzzjoni imma, mhiex il-mina. Is-soluzzjoni għandha tkun waħda li tiffaċilita l-moviment bejn il-gżejjer mingħajr ma żżid mal-problemi li diġa għandna. B’mod partikolari għandna nevitaw li nkabbru l-problema tat-traffiku iktar milli hi diġa. Dan nistgħu nagħmluh jekk niżviluppaw soluzzjoni li tnaqqas flok ma tkabbar id-dipendenza tagħna fuq il-karozzi.

Hu stmat li l-mina proposta ser iżżid il-medja kull jum tal-movimenti tat-traffiku bejn il-gżejjer mit-3000 tal-lum għal madwar 9000: żieda bi tlett darbiet fuq perjodu ta’ ħmistax-il sena. Wieħed ma jridx wisq għerf biex jifhem dawn iċ-ċifri, li nsibuhom ukoll fl-istudju ekonomiku kkummissjonat fl-2015 mill-Awtorità tat-Trasport u l-Kamra tal-Kummerċ Għawdxija. Għax il-ħlas biex tgħaddi mill-mina ser jinġabar minn fuq kull karozza u allura d-dħul ser jiddependi mill-ġenerazzjoni tal-ikbar ammont possibli ta’ traffiku. L-eżistenza tal-mina tiddependi fuq dan: bla traffiku ma tistax teżisti. Dan imur kontra l-oġġettiv ewlieni tal-Pjan Nazzjonali tat-Trasport (National Transport Master-Plan 2025) li fi kliem mill-iktar ċar jispjega kemm it-tnaqqis tal-karozzi mit-toroq tagħna hu l-mira fit-tul tal-politika tagħna dwar it-trasport.

Is-soluzzjoni meħtieġa trid tindirizza l-moviment tan-nies u mhux il-moviment tal-karozzi. L-unika soluzzjoni raġjonevoli allura hi l-introduzzjoni ta’ katamaran (fast ferry service) bejn Għawdex u Malta: bejn l-Imġarr f’Għawdex u punti varji mal-kosta f’Malta li jistgħu jinkludu x-Xemxija, Tas-Sliema u l-Belt Valletta. Ma dan imbagħad ikun hemm ħtieġa tat-titjib tas-servizz tat-trasport pubbliku minn fejn jieqaf il-katamaran għall-bqija tal-pajjiż.

Hu essenzjali li s-soluzzjonijiet li nagħżlu għall-problemi tagħna tat-trasport ikun jħarsu fit-tul ħalli nnaqqsu u mhux inżidu l-problemi li nħallu lil ta’ warajna.

Ippubblikat f’Illum: il-Ħadd 3 ta’ Frar 2019

The proposed Tunnel is not a solution: it is a problem

The proposed tunnel below the seabed linking Malta and Gozo will have considerable negative impacts on both Gozo and Malta. The most obvious one is the generation of around one and a half million cubic metres of bits of rock which will be dumped into our seas, kick-starting another environmental nightmare, land reclamation. The construction lobby has run out of space to “develop” on land. The Environment and Resources Authority has already started identifying potential sites. The residents of Xgħajra have good reason to be up in arms.

The problems associated with the proposed tunnel are manifold. Agricultural land around the two points of exit of the proposed tunnel will be gobbled up: at Ta’ Kenuna on the outskirts of Nadur, and close to L-Għerien, on the periphery of Mellieħa and further along the Pwales valley. This agricultural land will make way for the roads and toll-control facilities leading to the tunnel. Then, they will inevitably be complemented by more petrol stations.

On the basis of what is known so far, it is already clear that on the Malta side the tunnel will be bored through or very close to the Miżieb aquifer, which is still in a very good state – the only one on the island so graded. This fact has been one of the determining issues leading to the abandonment of other large scale projects in the area (the golf-course and part of the TEN-T network).

One could also add that a substantial amount of traffic will be channelled very close to the Simar Nature Reserve in Xemxija. The resulting noise, light and air pollution will have a considerable negative impact on the reserve, especially at night, a time when nature seeks its resting time.

The problems generated by the proposed tunnel are substantial. There is, however, a reasonable solution to the connectivity issue.

Let me be clear: connectivity between the islands of Gozo and Malta needs considerable improvement. The proposed tunnel, however, is not the solution. The solution should be one which facilitates movement between the islands without creating more problems than we already have! In particular, we should avoid worsening the traffic problem. This can be done if the solution we seek is not one which increases our car dependency.

It is estimated that the proposed tunnel will increase average daily traffic movements between the two islands from the current 3,000 to a projected 9,000 – a threefold increase estimated over a fifteen-year period. One immediately understands the purpose of these projections referred to in the feasibility study commissioned jointly by Transport Malta and the Gozo Business Chamber in 2015. The toll to be charged – and, consequently, the tunnel’s economic performance – is dependent on generating the maximum traffic possible. Traffic underpins the very existence of the tunnel. This runs counter to the basic objective of the National Transport Master-Plan 2025 which in crystal clear language spells out the reduction of cars from our roads as the long-term objective of Malta’s National Transport Policy.

The solution needs to address the movement of people between the islands, not the movement of cars. The only reasonable solution would be the introduction of a fast-ferry service between Gozo and Malta, between Mġarr in Gozo and various points in Malta, which would include Xemxija, Sliema and Valletta. This should be linked to an improvement in the public transport links between these points and the rest of the country.

It is essential that we seek long-term solutions to our transport problems, such that we do not leave future generations burdened by our problems.

published in The Malta Independent on Sunday – 3 February 2019

L-ispekulaturi tal-art mgħejjuna mill-Gvern: ħa jaħtfu l-baħar ukoll

Qieshom mejtin bil-ġuh. Wara li ħarbtu l-art, issa ser iduru għall-baħar. Għalissa qed jillimitaw ruhom mir-Rikasli saż-Żonqor. Imma wara jibqgħu għaddejjin sa Baħar iċ-Ċagħaq.

Hu ċar daqs il-kristall li l-ispekulaturi tal-art lokali dawwru għajnejhom lejn il-kosta tagħna biex jissodisfaw ir-regħba tagħhom bla qies.

L-informazzjoni li l-Awtorità għall-Ambjent u r-Riżorsi (ERA) identifikat il-kosta bejn ir-Rikażli u iż-Żonqor bħala l-iktar parti tal-kosta li hi addattata għar-riklamazzjoni hi ta’ tħassib kbir. L-ERA qed tgħid li għaliex iż-żona hija diġa’ iddegradata (jiġifieri prattikament mejta), allura ma jimpurtax li tkompli issirilha aktar u aktar ħsara, għax daqslikieku ma baqax tama għal din iż-żona. Hekk qed tgħid l-ERA b’ħafna logħob bil-kliem.

Għalkemm għadha ma ttieħdet l-ebda deċiżjoni definittiva, l-identifikazzjoni mill-ERA ta’ din iż-żona hija r-riżultat ta’ pressjoni biex jinstab sit adattat għar-rimi ta’ skart tal-kostruzzjoni li jirriżulta minn proġetti fuq skala kbira bħall-mina proposta bejn Malta u Għawdex, kif ukoll il-proġett dB fis-sit tal-ITS u l-proġett Corinthia fuq il-peniżola ta’ Pembroke. Dawn il-proġetti se jipproduċu madwar miljun u nofs metru kubu ta’ skart tal-kostruzzjoni.

Iż-żona matul il-kosta tax-Xgħajra diġà ntużat bħala sit għar-rimi tal-iskart tal-kostruzzjoni minn proġetti oħra kbar, bħall-proġett mostru tal-MIDI fuq il-peniżola ta’ Tigne. Hi żona li ġiet wkoll effetwat bħala riżultat tal-outfall tad-drenaġġ tul is-snin.

Il-Gvern irċieva madwar għoxrin espressjoni ta’ interess, liema sejħa ħarget mill-Gvern innifsu, għal proġetti li jinvolvu r-riklamazzjoni tal-art f’diversi partijiet tal-kosta. Deċiżjonijiet dwar dawn il-proġetti għadhom pendenti. Huwa magħruf ukoll li fost l-aktar proġetti msemmija huma dawk bejn Portomaso u Baħar iċ-Ċagħaq. Fosthom hemm it-talba riċenti relatata mal-proġett Corinthia fuq il-peniżola ta’ Pembroke kif ukoll iż-żona marbuta ma’ Portomaso li kienet tifforma parti mill-Masterplan ta’ Paceville li illum suppost li ġie skartat.

Sfortunatament il-Gvern huwa favur ir-riklamazzjoni tal-art u għalhekk id-dikjarazzjonijiet minn uffiċjali tal-gvern li jipprovaw jitfgħu l-ballun f’saqajn l-ERA mhux kredibbli.

Alternattiva Demokratika hi kontra l-estensjoni tal-kankru tal-ispekulazzjoni tal-art għal fuq il-baħar tagħna. Tħeġġeġ lill-Gvern biex jieħu miżuri effettivi biex jipproteġi l-kosta u l-aċċess għaliha. Għad hemm diversi talbiet pendenti minn NGOs ambjentali għall-protezzjoni tal-kosta u dan in konnessjoni mal-implimentazzjoni tal-ligi tad-dimanju pubbliku. Kemm se jdumu fuq l-ixkaffa dawn it-talbiet?

Sandro’s Monaco: as if tomorrow never comes

 

Having an area of 2.02 square kilometres, the principality of Monaco is around 58 per cent the size of Comino, which has an area of 3.50 square kilometres. Monaco is home to 38,000 persons: Comino having only one resident!

There is practically no ODZ in Monaco: in fact land development there is so intensive that it has been taking up small chunks of the Mediterranean along its coastline which it has been reclaiming since way back in 1880 in order to make up for a lack of land for development.

Malta Development Association (MDA) President Sandro Chetcuti is on record as stating that Malta’s future ought to be one that follows the path traced by Monaco. This, in my opinion, signifies just one thing: the development of every possible square metre of these islands.

The building development lobby is only concerned about today: making hay (today) while the sun shines. Sandro Chetcuti believes that the Monaco blueprint is the only realistic one. This is a vision very similar to Joseph Muscat’s “Dubaification” of the Maltese islands: a vision of high rises and land reclamation.

Chetcuti and Muscat sing from the same song sheet. They think and act as if tomorrow never comes. Development cannot stop, maintains Chetcuti, as “many” would be hurt. The “many”, obviously, being those seeking to make hay, while their sun still shines. They are aware that, at some point, their sun will set and hence they will no longer be able to make hay. Until such a day comes, should they be allowed to ruin everywhere?

Tomorrow will come, and the sun will rise again only for us to realise that we have increased substantially the problems bequeathed to future generations.

Obviously, the point about Monaco which sets Chetcuti ticking is that practically all its 2.02 square kilometres is an urban area. Monaco has no ODZ which can be taken up by rationalisation schemes to increase its building stock. Instead, it reclaims land from the sea and thus slowly adding to its land mass over the years.

The concrete jungle developing all around us is suffocating. It is fuelled by a building development industry which has no idea of where to stop and which wants more land for development.

It is about time that the building industry is cut down to size. We  should all realise, before it is too late, that the ongoing building spree is unsustainable and that progress is not measured in terms of buildings, roads or the enormous number of cars on our roads.

Our quality of life is actually measured through the open spaces we can enjoy and through rediscovering our natural roots, which have been obliterated through the ever- expanding urban boundaries.

The building industry is bent on producing more hay while the sun shines: on building more and more until such time that the Dubaification policy of the present government remains in implementation. Unfortunately the resulting “hay-fever” is being inflicted on all of us.

The sun rises for everyone, not just for those seeking to make hay, and when it sets, we rest – preparing for the morrow and hoping that, when it comes, we will still be in time to repair the extensive damage being done to us all.

(note cartoon published in Malta Today)

published in The Malta Independent on Sunday : 5 August 2018

Ħmar il-lejl: l-ippjanar għall-kosta u r-riżorsi marittimi

Nhar it-Tnejn il-Parlament beda d-diskussjoni dwar l-implimentazzjoni tal-leġislazzjoni tad-dimanju pubbliku u b’mod partikolari dwar rapport li ħejjiet l-Awtorità tal-Ippjanar fuq is-siti nominati. Ir-rapport jirreferi għal 24 sit nominati prinċipalment mill-għaqdiet ambjentali: 16-il sit kienu nominati minn Flimkien għal Ambjent Aħjar (FAA), seba’ siti minn Friends of the Earth u sit wieħed mill-Ministru għall-Ambjent Josè Herrera.

Id-diskussjoni għadha fl-istadji inizzjali u s’issa kienet limitata għal spjegazzjoni tal-liġi li l-Parlament approva lejn nofs l-2016.

Moħbi mill-attenzjoni pubblika hemm il-ħtieġa urġenti li tkun implimentata d-Direttiva tal-Unjoni Ewropeja dwar l-Ippjanar tal-Ispazju Marittimu. Din id-Direttiva kellha tkun addottata sa tmiem l-2014. Permezz tal-Avviż Legali 341 tal-2016 Malta nnominat lill-Awtorità tal-Ippjanar bħala l-awtorità kompetenti li ser tieħu ħsieb dak li għandu x’jaqsam mal-ippjanar tal-ispazju marittimu fil-gżejjer Maltin.

Wara li staqsejt inġibdet l-atttenzjoni tiegħi li l-Pjan dwar l-Ispazju Marittimu għal Malta diġà jifforma parti mill-Pjan Strateġiku dwar l-Ambjent u l-Iżvilupp (Strategic Plan for the Environment and Development – SPED). Ngħid il-verità ma kontx irrealizzajt dan. Ħsibt li kien hemm xi paġni f’dak id-dokument li kienu qabżuli u allura mort infittex mill-ġdid u sibt sezzjoni intitolata Coastal Zone and Marine Area u taħtha tlett oġġettivi għall ħarsien tal-kosta. Dawn l-oġġettivi jistgħu, u nittama li jkunu, sviluppati fi strateġija dettaljata dwar l-Ispazju Marittimu Malti.

Waqt li Malta jidher li llimitat ruħha għal tlett oġġettivi xotti, pajjiżi oħra għamlu ħidma kbira biex jippreparaw il-pjani tagħhom dwar l-Ispazju Marittimu. L-Irlanda, per eżempju, ippubblikat dokument ta’ 88 paġna intitolat Harnessing our Ocean Wealth. An Integrated Marine Plan for Ireland. Min-naħa l-oħra, ir-Renju Unit ippubblika dokument ta’ 55 paġna intitolat UK Marine Policy Statement.

Dawn iż-żewġ dokumenti jidħlu fid-dettall dwar l-Ippjanar għall-Ispazju Marittimu meħtieġ fl-Irlanda u r-Renju Unit. Bla dubju dawn id-dokumenti jeħtieġ li jkunu supplimentati bi pjani ħafna iktar dettaljati. Id-Direttiva tal-Unjoni Ewropeja fil-fatt tistabilixxi s-sena 2021 bħala d-data sa meta għandhom ikunu ffinalizzati l-Pjani għall-Ispazju Marittimu.

Malta hi gżira mdawra bil-baħar Mediterran. Fatt li għandu jkun rifless f’politika marittima serja u aġġornata. Sfortunatament dan mhux il-kaz għax jidher li għalina f’Malta it-tlett oġġettivi dwar il-kosta fil-Pjan Strateġiku dwar l-Ambjent u l-Iżvilupp (SPED) huma biżżejjed.

Id-Direttiva tal-Unjoni Ewropeja dwar l-Ippjanar tal-Ispazju Marittimu bla dubju hi intenzjonata biex iċċaqlaqna ħalli nimlew it-toqob fil-politika tagħna. L-ekonomija l-blu, jiġifieri l-ħidma ekonomika li tiddependi fuq l-użu tar-riżorsi marittimi, teħtieġ attenzjoni ħafna iktar dettaljata.

Il-Gvernijiet Maltin, wieħed wara l-ieħor, għamlu ħerba fuq l-art u ħsara bla qies fiż-żoni naturali. F’xi kazi l-ħsara li saret ftit tista’ tiġi rimedjata. L-ilma tal-pjan hu l-eżempju ewlieni.

L-ippjanar b’attenzjoni tal-Ispazju Marittimu jista’ jkun ta’ għajnuna biex din l-imġieba żbaljata tal-Gvernijiet ma tkunx esportata lil hinn mill-kosta ħalli wara li ħarbatna l-art ma nħarbtux il-baħar ukoll.

Snin ilu kien pass għaqli li kienet indirizzata l-kwalità tal-ilma baħar bl-introduzzjoni tal-impjanti għat-tisfija tad-drenaġġ. Għad baqa’ xi jsir biex l-ilma msoffi, flok jintrema, jibda jintuża. Kontinwament għadna niffaċċjaw it-tniġġiż mill-gaġeġ tal-ħut li għandna fl-ibħra u li qed ikollhom impatti kemm fuq iż-żoni residenzjali kif ukoll fuq il-faċilitajiet turistiċi. Imbagħad hemm ukoll is-sajd, it-tibdil fil-klima, l-bijodiversita, is-sigurtà marittima, il-fdalijiet arkeologiċi fil-baħar kif ukoll il-ħmar il-lejl li nassoċjaw mar-riklamazzjoni tal-baħar. Pjan għall-Ispazji marittimi fil-gżejjer Maltin irid jindirizza dawn l-oqsma u bosta oħra b’mod integrat.

Il-gżejjer Maltin fihom 316 kilometru kwadrat. L-ibħra Maltin sa 25 mil nawtiku mill-kosta fihom medda ferm ikbar b’kejl ta’ 11,480 kilometru kwadrat filwaqt li l-blata kontinentali taħt il-ġurisdizzjoni Maltija fiha 75,779 kilometru kwadrat.
Din hi l-isfida li għandna quddiemna biex inħarsu l-ibħra tagħna.

ippubblikat fuq Illum – 24 ta’ Diċembru 2017 

Planning nightmares: the coastline and marine resources

 

Last Monday, Parliament commenced a discussion on the implementation of the Public Domain legislation, in respect of which the Planning Authority has submitted a report entitled “Sites Nominated to be declared as Public Domain”. This report refers to 24 sites, nominated primarily by eNGOs: 16 sites were nominated by Flimkien għal Ambjent Aħjar (FAA), seven by Friends of the Earth and one by Minister for the Environment Josè Herrera.

The discussion is still in its initial stages and so far it has been limited to an explanation of the legislation enacted by Parliament in mid-2016.

Currently under the radar is the urgent need to implement the EU Directive on Maritime Spatial Planning, which had to be adopted by end of 2014. Malta has, in fact, adopted it and through Legal Notice 341 of 2016 it identified the Planning Authority as the competent authority which will deal with issues of maritime spatial planning in the Maltese Islands.

After submitting a query, it was pointed out to me that the Strategic Plan for the Environment and Development (SPED) shall constitute Malta’s Maritime Spatial Plan – something I had not realised. Thinking that I had missed something, I checked the SPED and found a text entitled Coastal Zone and Marine Area under which are listed three coastal objectives. These are clearly objectives that can (and hopefully will) be developed into a detailed Maritime Spatial Plan.

While Malta has apparently limited itself to three brief objectives, other countries have gone into considerable detail to prepare their Maritime Spatial Plans. Ireland, for example, has published an 88-page document entitled Harnessing our Ocean Wealth – an Integrated Marine Plan for Ireland and the United Kingdom has published a 55-page document entitled UK Marine Policy Statement.

Both documents go into some detail as to the Maritime Spatial Planning required in Ireland and the United Kingdom and they will undoubtedly have to be supplemented with more detailed plans. The EU Directive determines the year 2021 as the deadline for the establishment of Maritime Spatial Plans.

The fact that Malta is an island should be reflected in more importance being given to maritime policy. Unfortunately, this is clearly not the case as it seems that we have to manage with three coastal objectives in our Strategic Plan for Environment and Development (SPED).

The EU Directive on Maritime Spatial Planning is intended to nudge us to fill the gaps in our policies and plans. The blue economy, which is the economic activity dependent on the utilisation of marine resources, requires much careful planning.

Successive Maltese governments have ruined land-based resources and natural habitats. At times this has been done almost beyond repair. The water table is one such glaring example.

Careful maritime spatial planning could be of assistance in not exporting this erroneous behaviour beyond the coastline so that the environmental damage inflicted on the land is not repeated at sea.

Some years ago, addressing the quality of seawater by ensuring that urban wastewater dumped into the sea was adequately treated was a positive step. More still needs to be done to use the treated water. We repeatedly face issues of contamination arising out of fish-farms that has a negative impact on our residential and tourist facilities. What about fishing, energy, climate change, biodiversity, maritime safety, marine archaeological remains and land reclamation nightmares? A Maritime Spatial Plan for the Maltese Islands has to address all these issues and many more, in an holistic manner.

The Maltese Islands have a land area of 316 square kilometres. On the other hand, the area around the Maltese islands up to 25 nautical miles from the shoreline measures 11,480 square kilometres, while the area of the Continental Shelf under Malta’s jurisdiction in terms of the Continental Shelf Act measures approximately 75,779 square kilometres.

This is the physical extend of the challenge we face to protect our sea.

published in the Malta Independent on Sunday – 24th December 2017 

Claiming back our coast

portomaso-st-julian-s

 

The  Paceville Master Plan is rightfully subtitled : Malta’s prime coastal location.  However, it considers the coast as a money-spinner and completely ignores Parliament’s decision earlier this year to codify the importance of the coastal area through its inclusion in legislation regulating the public domain.

The Paceville Master Plan issued for public consultation on 26 September was the first opportunity for the Planning Authority, on behalf of the government – which instructs it on policy initiatives – to flesh out the bones of the declarations made in the public domain legislation, approved by Parliament in May. That it did not do so casts considerable doubt as to whether the unanimous approval by Parliament of the public domain legislation is another political gimmick.

The Paceville Master Plan covers a large tract of land bordering Pembroke to the north, Swieqi to the west, St Julian’s to the South and coastal waters to the east.  The Paceville coastline is extensive: it adds up to anything between three and four kilometres, depending on the manner of measurement.

We have been told that the Paceville coastline will be accessible through a passageway that will be created along the coast. As a matter of fact, most of the Paceville coastline is already dotted with commercial development on land which is either public property or else is subject to servitudes in favour of the state. During last Wednesday’s sitting of Parliament’s Environment and Development Planning Committee, representatives of the Government Property Department presented a drawing indicating all this property along the Paceville coastline. In a number of instances, the drawing submitted indicated passageways of a width varying between four and five metres along the coast which are obviously intended for public access, even though it is not always clear how one would be able to find their points of entry and exit.

Parliament’s approval of amendments to the Civil Code approved in May lays robust legal foundations for the protection of the coast. The government has been entrusted with protect the coast on behalf of future generations, hence it belongs to all of us, in trust, on behalf of those future generations.  The coastal perimeter extends to a minimum of 15 metres from the shoreline. To this, the newly-approved legislation adds the foreshore, which extends as far as the reach of the largest wave – a reach that can be substantial in those parts of the coastline that are exposed to the open sea.

Large sections of the Paceville coastline are developed, but there are still small pockets which are either not developed or else contain development that is not intensive. A proactive Master Plan would have identified this as an opportunity for plotting the way forward in implementing a programme for the protection of the Paceville coast.  Unfortunately, it seems that the consultants to the Planning Authority were not briefed on the matter and as a consequence there is a real danger that this opportunity will be lost.

After the current public consultation is concluded, the Planning Authority will have to examine the comments made and consider the extent to which such comments can and should be taken into consideration in the second draft of the Master Plan.

The Authority should take on board the public domain legislation in respect of the coast and plan for its implementation when it revises the first draft of Paceville Master Plan.  In the short term, this should be done in relation to those areas which are still undeveloped or underdeveloped. I would also expect the Planning Authority to plan for the longer timeframe in respect of those sections of the coastline which are already intensively developed.

This leaves one other basic issue: land reclamation. I feel that, on a policy level, Labour’s land reclamation policy is the marine equivalent of the Nationalist’s widely criticised 2006 rationalisation exercise through which the boundaries of development were irresponsibly extended.  Labour will be extending the limits to development outwards towards the sea whilst the Nationalist-led government extended the said limits towards the countryside.

The proposed Master Plan for Paceville recommends land reclamation off the Dragonara/Portomaso coastline. This is an ill-thought proposal as the area identified for land reclamation will be an extension of possibly the most intensively developed part of the Paceville coast. This proposal should undoubtedly be revisited as commonsense suggests that rather than increasing development in the area, this should, in the long term, be curtailed.

The proposed Paceville Master Plan should be utilised as a planning tool for adequate coastal management. It can, at this point in time, also be the optimum vehicle for translating the public domain legislation into practical policies through which we can start the process of reclaiming the coast for future generations.

This is an opportunity which should not be missed.

published in The Malta Independent : 16 October 2016