L-ispekulaturi tal-art mgħejjuna mill-Gvern: ħa jaħtfu l-baħar ukoll

Qieshom mejtin bil-ġuh. Wara li ħarbtu l-art, issa ser iduru għall-baħar. Għalissa qed jillimitaw ruhom mir-Rikasli saż-Żonqor. Imma wara jibqgħu għaddejjin sa Baħar iċ-Ċagħaq.

Hu ċar daqs il-kristall li l-ispekulaturi tal-art lokali dawwru għajnejhom lejn il-kosta tagħna biex jissodisfaw ir-regħba tagħhom bla qies.

L-informazzjoni li l-Awtorità għall-Ambjent u r-Riżorsi (ERA) identifikat il-kosta bejn ir-Rikażli u iż-Żonqor bħala l-iktar parti tal-kosta li hi addattata għar-riklamazzjoni hi ta’ tħassib kbir. L-ERA qed tgħid li għaliex iż-żona hija diġa’ iddegradata (jiġifieri prattikament mejta), allura ma jimpurtax li tkompli issirilha aktar u aktar ħsara, għax daqslikieku ma baqax tama għal din iż-żona. Hekk qed tgħid l-ERA b’ħafna logħob bil-kliem.

Għalkemm għadha ma ttieħdet l-ebda deċiżjoni definittiva, l-identifikazzjoni mill-ERA ta’ din iż-żona hija r-riżultat ta’ pressjoni biex jinstab sit adattat għar-rimi ta’ skart tal-kostruzzjoni li jirriżulta minn proġetti fuq skala kbira bħall-mina proposta bejn Malta u Għawdex, kif ukoll il-proġett dB fis-sit tal-ITS u l-proġett Corinthia fuq il-peniżola ta’ Pembroke. Dawn il-proġetti se jipproduċu madwar miljun u nofs metru kubu ta’ skart tal-kostruzzjoni.

Iż-żona matul il-kosta tax-Xgħajra diġà ntużat bħala sit għar-rimi tal-iskart tal-kostruzzjoni minn proġetti oħra kbar, bħall-proġett mostru tal-MIDI fuq il-peniżola ta’ Tigne. Hi żona li ġiet wkoll effetwat bħala riżultat tal-outfall tad-drenaġġ tul is-snin.

Il-Gvern irċieva madwar għoxrin espressjoni ta’ interess, liema sejħa ħarget mill-Gvern innifsu, għal proġetti li jinvolvu r-riklamazzjoni tal-art f’diversi partijiet tal-kosta. Deċiżjonijiet dwar dawn il-proġetti għadhom pendenti. Huwa magħruf ukoll li fost l-aktar proġetti msemmija huma dawk bejn Portomaso u Baħar iċ-Ċagħaq. Fosthom hemm it-talba riċenti relatata mal-proġett Corinthia fuq il-peniżola ta’ Pembroke kif ukoll iż-żona marbuta ma’ Portomaso li kienet tifforma parti mill-Masterplan ta’ Paceville li illum suppost li ġie skartat.

Sfortunatament il-Gvern huwa favur ir-riklamazzjoni tal-art u għalhekk id-dikjarazzjonijiet minn uffiċjali tal-gvern li jipprovaw jitfgħu l-ballun f’saqajn l-ERA mhux kredibbli.

Alternattiva Demokratika hi kontra l-estensjoni tal-kankru tal-ispekulazzjoni tal-art għal fuq il-baħar tagħna. Tħeġġeġ lill-Gvern biex jieħu miżuri effettivi biex jipproteġi l-kosta u l-aċċess għaliha. Għad hemm diversi talbiet pendenti minn NGOs ambjentali għall-protezzjoni tal-kosta u dan in konnessjoni mal-implimentazzjoni tal-ligi tad-dimanju pubbliku. Kemm se jdumu fuq l-ixkaffa dawn it-talbiet?

L-appell dwar il-permess tad-dB f’Pembroke

 

L-appell kontra l-permess tad-dB biex iħarbat is-sit tal-ITS ġie sottomess.
Ir-raġunijiet għall-appell, fil-qosor huma s-segwenti:

1) Il-kunflitt ta’ interess ta’ Matthew Pace, membru tal-Bord tal-Awtoritá tal-Ippjanar u fl-istess ħin b’interess f’aġenzija tal-propjetá,
2) Il-kunflitt ta’ interess tal-Membru Parlamentari Clayton Bartolo, membru tal-Bord tal-Awtoritá tal-Ippjanar,
3) In-nuqqas ta’ skrutinju tal-presentazzjoni sħiħa minn Jacqueline Gili li twasslet għal-laqgħa tal-Bord bil-jet,
4) Nuqqas ta’ konformitá tal-proposta ta’ żvilupp mal-Height Limitation Adjustment Policy for Hotels,
5) Nuqqas ta’ konformitá tal-proposta ta’ żvilupp mal-Planning Policy Guide on the use and applicability of the Floor Area Ratio (FAR), artiklu 5.9 dwar l-ispejjes konnessi mal-iżvilupp tal-infrastruttura,
6) Nuqqas ta’ konformitá tal-proposta ta’ żvilupp mal-Planning Policy Guide on the use and applicability of the Floor Area Ratio (FAR), u dan dwar diversi dettalji tal-policy kif imfissra dettaljatament fid-dokument tal-appell,
7) Nuqqas ta’ konformitá dwar policies li jikkonċernaw l-impatt viżiv,
8) Hemm appartamenti li huma inqas fid-daqs minn dak stabilit mill-policies tal-ippjanar,
9) is-Social Impact Assessment ma sarx sewwa,
10) L-iżvilupp propost ma jikkonformax ma policies, liġijiet u obbligi internazzjonali dwar il-ħarsien tal-wirt storiku,
11) L-iżvilupp propost jikser diversi policies u liġijiet dwar il-ħarsien tal-kosta,
12) L-iżvilupp propost ma jsegwix policies intenzjonati biex iħarsu l-ispazji miftuħa,
13) L-impatt tat-traffiku mhux ikkunsidrat b’mod adegwat; ma sarux studji neċessarji u kien hemm nuqqas ta’ konsultazzjoni bi ksur tal-Konvenzjoni ta’ Aarhus,
14) Ma ġietx osservata l-liġi tad-Dimanju Pubbliku u dan dwar il-ħarsien tal-kosta,
15) Nuqqas ta’ konsiderazzjoni u piz mogħti lil materji diversi relevanti dwar ambjent, estetika u sanitá,
16) Nuqqas ta’ development brief u Master Plan,
17) Nuqqas ta’ ħarsien ambjentali dwar protezzjoni ta’ bijodiversitá, flora u fawna fuq l-art u fil-baħar, siti Natura 2000 u Għarq Ħammiem
18) Nuqqas ta’ osservanza ta’ liġijiet diversi dwar tniġġiż u emmissjonijiet kif ukoll dwar skart riżultanti mill-proġett.

Making hay …….. in St George’s Bay

The 23-storey Pender Gardens high-rise is nearly completed, after nearly 10 years of continuous construction activity. The application for the 31-storey Mercury House was approved last month and next Thursday, the Planning Authority Board will consider planning application PA2478/16 submitted by Garnet Investments Limited in respect of a substantial stretch of land along St George’s Bay on the outskirts of Paceville St Julian’s.

The applicant has requested the following: “Demolition of all existing buildings forming part of St. George’s Bay Hotel and ancillary facilities, Dolphin House, Moynihan House and Cresta Quay. Construction of Parking facilities, Hotels and ancillary facilities, Commercial Area, Multi Ownership holiday accommodation, Bungalows, Language school with accommodation. Restoration of the Villa Rosa and upgrading of the facilities including parking facility, kitchen and toilets all below existing site levels within the Villa Rosa Area to address catering facilities/wedding hall.”

The project includes mixed-uses covering a total site area of 48,723 square metres, a building footprint of 18,345 square metres and a total gross floor area of 82,917 square meters.

It is a small part of the area that was tentatively tackled by a draft Masterplan for Paceville which, after being rejected by public opinion was sent back to the drawing board. I consider it highly unethical for the Planning Authority to proceed with considering this application after the clear and resounding verdict of public opinion. As a minimum, the consideration of this application should have been postponed until a new, reasonable and acceptable Masterplan has received the go-ahead. A minimum effort at achieving consensus as to what development is acceptable is essential.

The Planning Authority is unfortunately insensitive to public opinion. It is amply clear that it, and those who appoint most of its Board members, are on the same wavelength as the development lobby, which is hell-bent on making hay while the sun shines. At this point in time, it is the turn of the St George’s Bay area.

The project is obviously recommended for approval in the 43-page report from the Planning Directorate.

The basic point of contention with such large-scale projects is that they are considered in isolation. Most of them would never get off the drawing board (real or virtual) if the consolidated impact of all neighbouring projects (existing or in the pipeline) are taken into account. Earlier this week, I had the opportunity to address similar concerns to the EIA public consultation on the db Group ITS site project.

Five large-scale projects are earmarked for St George’s Bay. Each will generate considerable havoc from excavation throughout construction and right through operation in the whole St George’s Bay area. Cumulatively it will be hell. Who cares?

Way back in 2006, when the Strategic Environmental Assessment Directive of the EU was about to be implemented in Malta, the Lawrence Gonzi – George Pullicino tandem rushed through the approval of the Local Plans in such a manner as to ensure that the accumulated environmental impact resulting from their implementation was not scrutinised and acted upon. The present state of affairs is the direct result of that irresponsible Gonzi-Pullicino action 12 years ago.

The Environment and Resources Authority (ERA) occasionally tries to patch things up. For example, within the framework of the ITS EIA exercise ERA suggested that the traffic assessment of the ITS and the Villa Rosa projects be consolidated. This has, however, been avoided: a case of too little, too late.

So where do we go from here?

The development lobby is maximising its efforts to make hay while the sun shines. In reality, a consolidated mess is taking shape with massively built-up areas in a relatively restricted space punctured by high rises mimicking phallic symbols of all shapes and sizes spread all over the place. Pender Place has 23 floors. Mercury House will have 31. The ITS phallus will have a 37-floor residential tower. The Villa Rosa/Cresta Quay project will have more modest heights.

Next Thursday, the Planning Authority has the opportunity to scrutinise the proposal for this Villa Rosa-Cresta Quay project. We will see once more the extent to which the concrete lobby still holds the Authority by its balls – obviously where this is applicable.

 

published in The Malta Independent on Sunday – 18 February 2018

Serqa fid-dawl tax-xemx: min jidher u min ma jidhirx

Two Towers on ITS site

 

It-tender dwar żvilupp turistiku fuq l-art tal-ITS (Institute of Tourism Studies) ilu li għalaq. Ilna nisimgħu li hemm ħadma kbira.

Is-Sunday Times tal-lum f’artiklu ta’ Caroline Muscat tagħtina l-istorja bażika.

L-offerti intefgħu minn Silvio Debono tas-Seabank Group : offra €6.5 miljuni għal art tal-qies ta’ madwar 25,000 metru kwadru (iva: ħamsa u għoxrin elf metru kwadru, qed taqra tajjeb).

Din l-art li l-pjan lokali [North Harbours Local Plan] jiddeskrivi bħala Entertainment Priority Area tiswa’ ferm iktar minn hekk. Ċertament mhux inqas minn €100 miljun. Probabilment viċin il-€120 miljun.

S’issa l-art għadha ma ġietx trasferita imma wieħed mill-ágenti tal-propjetà diġa qiegħed jaċċetta deposits għal appartamenti lussużi li huma ippjanati għaż-żona, inkuż fis-żewġ torrijiet li hemm ippjanati.

Biex Silvio Debono, permezz tal-kumpaniji tiegħu, tefa’ offerta daqshekk baxxa għal art li għandha potenzjal enormi, bil-fors li għandu rasu mistrieħa li mhux ser ikollu diffikultajiet li jinfetħulu l-bibien għal biċċa “business” tajba.

Bil-fors li jitqanqlu suspetti kbar. Dwar min qed jidher u min possibilment ma jidhirx f’din is-serqa. Għax dan mhux “business” imma serq fid-dawl tax-xemx.

Huwa l-kaz ta’ investigazzjoni mhux biss mill-Awditur Ġenerali imma ukoll mill-Kummissarju tal-Pulizija. Illum qabel għada.