We need a Carbon Budget

Searching for the word “climate” through the 2021 Pre-Budget document published earlier this week entitled Towards a Sustainable Economy one finds the word three times: twice referring to the United Nations Agenda which has to be addressed by Malta as a prospective UN Security Council member, while a third reference is to policy documents under preparation in Malta. The word climate in the pre-budget document is not associated with any climate change policy implementation or action and its impact on the Maltese economy.

It is already five years since the Paris Climate Summit and its conclusions are still being “studied” in Malta. If we keep on procrastinating, achieving carbon neutrality by 2050 will be very difficult to attain.

When Parliament approved the Climate Action Act in 2015 it identified that one of the tools to be used in the politics of climate change was the formulation of a Low Carbon Development Strategy. Consultation on a Vision to develop such a strategy was carried out in 2017, but three years down the line the final policy document is nowhere in sight, even though the Minister for Climate Change Aaron Farrugia has indicated that it may be concluded towards the end of this year. 

A Low Carbon Development Strategy will identify those sectors which are of considerable relevance in developing a low carbon strategy. Some of them are major carbon emission contributors to be addressed. Other sectors are part of the solution as they provide alternative tools which serve to decouple the economy from intensive energy use, in the process reducing carbon emissions.

The Vision which was subject to public consultation three years ago identifies a number of sectors as areas for climate action, namely: enterprise, energy, transport, waste, water, agriculture, tourism, information and communication technologies (ICT) and finance.

The Low Carbon Development Strategy, when published, should address these areas of action. It would also be expected that such a strategy would also identify the manner in which we will be in a position to achieve our target of carbon neutrality. Such a strategy would also, for completeness be expected to be coupled with a carbon budget which would break down the general target into specific manageable objectives which could be achieved over a specific and reasonable timeframe.

At the Paris Climate Summit, together with all other countries, Malta made pledges to take action in order to lay the foundations for reducing climate impacts. If all the pledges made at Paris are honoured, however, we will still be very far off from achieving the target of not exceeding a two-degree Celsius temperature rise. Much more is required.

Unfortunately, Malta’s climate related policies are double faced. On one hand the Malta government publicly pledges action to address climate change. Simultaneously, however, it proceeds with massive road infrastructural projects which encourage more cars on our roads. On the other hand, plans for the electrification of our roads are apparently subject to an elephantine gestation period. In the meantime, car emissions compete with power generation emissions as Malta’s major contributor to climate change.

It is unfortunate that the Low Carbon Development Strategy and the associated Carbon Budget are taking too long to be formulated. It will take much longer to implement them as special interest groups will undoubtedly seek to protect their specific areas to the detriment of attaining our carbon-neutral objective.  

Malta should be at the forefront of climate change action. Parliament’s declaration recognising the existence of a climate emergency is not enough. Words must give way to action. As an island, Malta should be aware that a primary climate change challenge in the years to come will be a rising sea level as a result of which the coastline may recede inwards at a rate so far unknown. The coast, we may remember, is home to most of our maritime and tourism infrastructural facilities, all of which are under threat. Even residential areas close to the sea level will be impacted. This would include all sandy beaches and the residential/commercial areas at l-Għadira, Xemxija, Salini, Gzira, Msida, Sliema, Ta’ Xbiex, Pietà, Marsa, Marsaxlokk, Marsaskala, Birzebbuga, Xlendi, and Marsalforn. Impacts could also move towards inland low-lying areas such as Qormi.

If we take too long to bring our own house in order, it may be too late.

published in The Malta Independent on Sunday : 13 September 2020

Malta: b’politika diżonesta dwar il-klima

Stimi dwar kemm jista’ jogħla l-livell tal-baħar, b’mod globali kif ukoll fl-Ewropa, ivarjaw skond kif wieħed iqis ir-rata tad-dewbien tas-silġ akkumulat fil-poli kif ukoll fi Greenland. Il-mod kif nilqgħu għall-emissjonijiet tal-karbonju ukoll għandu impatt fuq dawn l-istimi. Dawn l-istimi fil-fatt ivarjaw minn żieda ta’ 34 ċentimetru sa żieda ta’ 172 ċentimetru sa tmiem dan is-seklu. Imma jekk l-emissjonijiet tal-karbonju jkunu indirizzati b’politika iffukata u effettiva, din iż-żieda tista’ tkun waħda iżgħar.

Minkejja dan, ħadd ma qiegħed f’posizzjoni li jantiċpa jekk din iż-żieda fil-livell tal-baħar tkunx waħda gradwali inkella jekk din isseħħx f’daqqa. Hemm iżda l-biża’ li l-gravità tas-sitwazzjoni tista’ taċċellera avolja il-jekk u l-meta ħadd ma jaf. Din hi xi ħaga ġdida għal kulħadd!

Kull żieda fil-livell tal-baħar, kemm jekk isseħħ b’mod gradwali kif ukoll jekk isseħħ f’daqqa, ikollha impatt fuq il-kosta u b’mod partikolari fuq l-infrastruttura żviluppata tul iż-żmien. Din l-infrastruttura hi primarjament waħda turistika imma tinkludi ukoll żvilupp residenzjali li xi drabi jasal sax-xifer, sal-baħar: kemm bl-approvazzjoni tal-awtoritajiet u anke xi minndaqqiet mingħajrha!

Il-ħsara potenzjali għall-infrastruttura kostali hi kwistjoni li għandha tħassibna. Din diġà sofriet ħsarat diversi minħabba il-maltemp qalil li żied fil-frekwenza u l-intensità tul dawn l-aħħar snin. L-impatt ta’ żieda fil-livell tal-baħar bla dubju ser joħloq tibdil kbir tul il-kosta kollha tal-gżejjer Maltin. L-istorja tgħallimna. Nhar it-Tnejn 28 ta’ Diċembru 1908 fil-5.20 ta’ fil-għodu Messina fi Sqallija ġarrbet wieħed mill-iktar terrimoti qliel li qatt kien hawn fl-Ewropa, b’qawwa mkejla ta’ 7.5 fuq l-iskala Richter. Immedjatament, inħoloq tsunami b’mewġ għoli sa 9 metri. Madwar sagħtejn wara, fit-7.45 ta’ fil-għodu dan it-tsunami, ftit immansat, wasal fil-gżejjer Maltin.

Diversi gazzetti Maltin ta’ dak iż-żmien irrappurtaw li l-lokalitajiet mal-kosta viċin il-livell tal-baħar kienu mgħarrqa fl-ilma mit-7.45 ta’ fil-għodu għax b’effett taz-tsunami l-baħar tela’ l-art. Dan baqa’ sal-4.00 ta’ waranofsinnhar meta l-baħar reġa’ ikkalma u rritorna lejn il-livelli normali tiegħu! Herbert Ganado, f’l-ewwel volum ta’ Rajt Malta Tinbidel jgħid li residenzi u ħwienet tul il-kosta ta’ tas-Sliema, l-iMsida u tal-Pietà kienu mgħarrqa f’tebqa’ t’għajn għax daħlilhom kwantità ta’ ilma fis-sular terran. Bħala medja l-baħar għola madwar erba’ piedi : 1.20 metri. Fil-Port il-Kbir, imma, ma ġara xejn għax kien imħares mill-breakwater, li l-bini tiegħu kien ġie ffinalizzat madwar sentejn qabel, fis-sena 1906.

Żieda fil-livell tal-baħar bħala riżultat tat-tibdil fil-klima tkun tfisser repetizzjoni tal-impatti taz-tsunami tal-1908 mifruxa iktar u fuq bażi permanenti. Il-lokalitajiet Maltin tul il-kosta li qegħdin viċin tal-livell tal-baħar jispiċċaw b’mod permanenti fl-ilma baħar. Dan ikun jinkludi r-ramliet kollha u żoni kummerċjali u residenzjali fl-Għadira, ix-Xemxija, is-Salini, l-Gzira, l-iMsida, tas-Sliema, Ta’ Xbiex, Tal-Pietà, il-Marsa, Marsaxlokk, Marsaskala, Birzebbuġa, ix-Xlendi, u Marsalforn. L-impatti jistgħu jinħassu iktar il-ġewwa mill-kosta ukoll, f’lokalitajiet li huma f’livell tal-baħar bħal Ħal-Qormi u allura jeffettwa l-inħawi kollha mix-xatt tal-Marsa sa Ħal-Qormi b’dik li hi magħrufa bħala l-Marsa tal-Inġliżi b’kollox. Dan jeffettwa ukoll l-investiment fl-infrastruttura sportiva.

Li jogħla l-livell tal-baħar issa hu inevitabbli. Imma b’ħidma bil-għaqal għad hemm ċans li nnaqqsu kemm dan jogħla. Dan jista’ jseħħ kemm-il darba nieħdu passi biex innaqqsu l-emmissjonijiet tal-karbonju u allura inkunu qed nagħtu kontribut biex iż-żieda fit-temperatura globali tkun l-inqas possibli.

Fis-summit ta’ Pariġi, Malta, flimkien mal-bqija tal-pajjiżi, wegħdet li tieħu azzjoni konkreta biex ikun possibli li jonqsu l-impatti fuq il-klima. Però anke jekk il-wegħdiet kollha li saru f’Pariġi jkunu onorati, hu ċar li għadna l-bogħod ħafna milli nilħqu l-mira miftehma li ma naqbżux iż-żieda ta’ żewġ gradi Celsius fit-temperatura. Hu meħtieġ ħafna iktar mingħand kulħadd. Hemm bżonn mhux biss iktar azzjoni konkreta imma ukoll politika koerenti u konsistenti.

Il-politika ta’ Malta dwar il-klima, imma, hi waħda diżonesta. Nuru wiċċ b’ieħor kontinwament. Min-naħa l-waħda l-Gvern Malti jwiegħed li jaġixxi biex ikun possibli li nindirizzaw il-klima. Imma fl-istess ħin jibqa’ għaddej bi proġetti infrastrutturali li jinkoraġixxu iktar karozzi fit-toroq u allura iktar emissjonijiet. L-emissjonijiet tal-karozzi jikkompetu ma dawk li joriġinaw mill-ġenerazzjoni tal-elettriku.

Hemm bżonn li ndaħħlu ftit sens u konsistenza fil-politika ta’ Malta dwar il-klima. Għax sakemm nibqgħu inkonsitenti kullma qed nagħmlu hu li qed ngħinu biex ikompli jitħaffar il-qabar tagħna.

 

ippubblikat fuq Illum : il-Ħadd 24 ta’ Mejju 2020

Malta: a double-faced climate change policy

Estimates for sea-level rise, both globally as well as in Europe, vary depending on the assumptions made as to the rate at which ice at the polar caps and Greenland is melting.

The carbon emission-mitigation policy scenario also has a direct bearing on these estimates. These estimates range between a 34- and 172-centimetres potential sea-level rise by the end of the current century. Lower emissions together with a focused mitigation policy may restrict sea-level rise towards the lower end of the range.

However, notwithstanding, no one is in a position to predict as to whether such a sea-level rise will be gradual or sudden. It is however feared that once a tipping point is reached changes may occur at a much faster pace than anticipated. We all are on a learning curve on this!

Any sea-level rise, gradual or sudden, will have an impact on our coastline and in particular on the infrastructure developed over the years along the coast. This infrastructure is primarily of a touristic nature but it also includes residential development at times built along the water’s edge with or without the acquiescence of the planning authorities.

There is nothing to worry about if the sea-level rise wipes out abusive development. When one considers the potential impact on coastal infrastructure that is, however, a different kettle of fish.

The coastal infrastructure is already battered by the ever-frequent storms. The impact of a sea-level rise will without any doubt redraw the coastal map of the Maltese islands.

Let us have a look at our history books. At 5.20am of Monday 28 December 1908, Messina in neighbouring Sicily experienced one of the most powerful earthquakes to ever hit Europe, measuring 7.5 on the Richter scale. Immediately, a tsunami generating waves as high as 9 metres was unleashed. Just over two hours later, at 7.45am, the tsunami, slightly tamed, reached the Maltese Islands.

Various local newspapers of the time reported that low-lying areas were flooded from 7.45am until around 4.00pm when the sea receded back to its “normal level”. Herbert Ganado, in his Rajt Malta Tinbidel (Volume 1, page 37) states that residences and shops along the coast in Sliema, Msida, and Pietà were suddenly flooded. The average sea-level rise was 1.20 metres. The Grand Harbour was spared as it was protected by the breakwater, whose construction had been finalised a couple of years earlier.

A sea-level rise as a result of climate change would repeat the Malta impacts of the 1908 tsunami on a permanent basis. The low-lying parts of the Maltese coastline would then be permanently underwater. This would include all sandy beaches and the residential/commercial areas at l-Għadira, Xemxija, Salini, Gzira, Msida, Sliema, Ta’ Xbiex, Pietà, Marsa, Marsaxlokk, Marsaskala, Birzebbuga, Xlendi, and Marsalforn. Impacts could also move towards the inland low-lying areas such as Qormi.

Sea-level rise is inevitable. It is only its extent which can be reduced. This can happen if we take appropriate action which reduces carbon emissions and hence contributes to nudging the temperature increase towards the least possible.

At the Paris Climate Summit, together with all other countries, Malta made pledges to take action to lay the foundations for reducing climate impacts. If all the pledges made at Paris are honoured, however, we will still be very far off from achieving the target of not exceeding a two-degree Celsius temperature rise. Much more is required.

Malta’s climate related policies are double faced. On one hand the Malta government pledges action to address climate change. Simultaneously it proceeds with road infrastructural projects which encourage cars on our roads. Car emissions compete with power generation emissions as Malta’s major contributor to climate change. Is it not about time that we bring our own house in order? We are digging our own grave with a double-faced climate policy.

published on The Malta Independent on Sunday : 24 May 2020

Tunnel vision

cart-horse

 

Gozo’s connectivity issues are considered as a problem when in reality they define Gozo and determine its distinct features. Unfortunately, in this respect both the government and the opposition have developed a tunnel vision, that is they tend to focus on just one view and ignore everything else.

The latest twist in the current debate is the declaration by the Finance Minister in his budget statement earlier this month that the feasibility study commissioned by Transport Malta, together with the Gozo Business Chamber has been concluded positively  and that the next step would be  the commissioning of a technical and geological study relative to the projected tunnel across the Gozo Channel.

Transport Malta, prodded by the Gozo Business Chamber, seems to be bent on putting the cart before the horse as it is inconceivable how a feasibility study could be concluded without first having identified all the geological issues and examined them in detail.  Knowing that the Gozo Channel contains a number of geological faults, including active ones, leads to the logical preliminary conclusion that geological studies of the area proposed to be tunnelled could have a substantial bearing on the technical parameters of the project. This would include the specific  route to be selected, the actual works to be carried out and the costings. The geological studies could also lead to a technical recommendation to select an alternative solution other than boring a tunnel below the seabed .

When the PN-led government placed the issue on the national agenda, former Minister Chris Said gave his guesstimate that the tunnel would cost in the region of €150 million. We have recently been informed that this guesstimate has increased substantially to between €250 and €300 million.

These guesstimates are on the low side, because when the geological issues have been examined the estimate could well shoot up to over €1 billion- this being around 4 times what has been taken into consideration in the so-called “feasibility study”.

These type of project very rarely follow estimated costs. The tunnel linking the Marsa and Delimara powers stations in Malta, for example, overshot its projected costs by around 100% due to the absence of adequate geological information. As a result, parts of the  tunnel caved in during works, necessitating substantial additional work, including redirecting parts of it. On the other hand,  expenditure on the Channel Tunnel linking Folkestone in Kent to Coquelles near Calais exceeded the projected estimates by around 80% notwithstanding the availability of detailed geological studies.

Last week, one of the Sunday newspapers referred to a survey carried out by the Gozo Tourism Association which indicates that 64% of tourism operators in Gozo are adamantly against the proposed tunnel because the direct result of this would be to render Gozo as an appendage of Malta. Gozo would be transformed into a one- day destination, just like most of the other tourism attractions spread over the Maltese islands.

Gozitan tourism operators have a very valid point, as the direct result of this tunnel vision is that Gozo would be transformed from an island into a remote village. Most hotels in Gozo as well as the flats and farmhouses available to let, could then require the identification of another use.

This matter has not yet been examined and yet it is fundamental to the decision-making process and should have been the first step in the whole exercise.

All this muddle and I have not yet commenced discussing the environmental impacts of the proposed tunnel!

The tunnel will generate large quantities of rock which require disposal. The precise amount would depend on the route to be followed (and consequently the length of the tunnel) as well as the selected design (the cross sectional area) and could be anything between one and two million cubic metres of fragmented rock.

In addition, the proposed point of entry of the tunnel at Iċ-Ċumnija on the outskirts of Mellieħa, would most probably be accessed through a new road network in the area immediately behind the Għadira Nature Reserve and bird sanctuary. This means that all the environmental issues which were discussed when the proposed TEN-T network was being debated will once more be of relevance.

There are many other ways through which Gozo’s connectivity issues can be addressed and there are certainly more cost effective ways than the proposed tunnel. The costs to be considered are not just financial: they include social and environmental costs, which should be considered on the drawing board and not as an afterthought.

This is the problem with the tunnel vision – you just have one view, excluding all the others.

TEN-T : The Għadira Nodes

times_of_malta196x703

published Saturday 27 December 2008

by Carmel Cacopardo

__________________________________________________________

Two important points have to be borne in mind while searching for a solution to upgrade the Ten-T (Trans-European Transport Network) road link at Ghadira Bay, Mellieha.

Firstly, all identified solutions will have an environmental impact. Secondly, in order that the public discussion be fruitful all information must be freely available.

The stakeholders are not just NGOs and specific economic operators. The whole community is the stakeholder. Stakeholders require information not just from the perceived interested parties but more so from the public authorities that are vested with authority to defend the community’s interests.

A number of reports have been made public. Some have been quoted selectively. Others are still under wraps.

BCEOM (French engineering consultants), in its 2004 report entitled Feasibility And Environmental Impact Studies For Transport Infrastructure Projects In Malta – Final Feasibility Study Report and AIS Environmental Limited, in its 2005 report entitled Proposed Review Of Ghadira Road Options, identify the upgrading of the existing road along the beach as the preferred option.[vide also 1 and 2]

Since then a number of proposals have been publicised. These revolve around two possibilities: the retention of the existing road with modifications or the construction of an alternative road to the south of the Nature Reserve and the Danish Village.

Preliminary appraisal of environmental impacts has been drawn up and on its basis the authorities have issued opinions that have not yet been made public. These indicate the detailed studies that have yet to be carried out in order to arrive at a definite decision.

In particular, it is to be noted that the AIS report dated November 2005 states (pages 2 and 3) that BCEOM had rejected the tunnel design beyond the Danish Village, which would have reclassified the beach front route as a local road.

These proposals were rejected by BCEOM on the basis of “excessive and unpredictable costs”. In addition, the AIS report emphasises that “Mepa had rejected the tunnel options on environmental grounds because the area in question is classified as a Special Area of Conservation (SAC)”.

The AIS report further states that subsequent to the above-indicated Mepa rejection, ADT reassessed the situation and proposed three options, two focusing on the existing road and the third being a new road incorporating a tunnel and bridge through the garigue (an SAC) south of the Danish Village, which, like the SAC-protected Nature Reserve, has been officially approved by the EU and forms part of Natura 2000.

It is within this context that Mepa has requested a “holistic preliminary assessment of the impacts arising from the various options that ADT is now considering”. Mepa has requested a number of studies related to beach dynamics, ecology, agriculture, geology, geomorphology and hydrology, archaeology and others. These studies were requested way back in 2005 and none has to date seen the light of day, notwithstanding that everyone seems to be in a hurry! These studies, if properly carried out, are of fundamental importance in determining the manner in which the Ghadira Ten-T link is to proceed, if at all!

Various statements have been made in the past weeks. The most conspicuous were those related to the sandy beach. It is by now clear that these have originated (without scientific justification) from a consultant commissioned by one of the economic operators in Ghadira Bay and were intended to reinforce his proposal for a beach concession as a result of a possible re-routing of the Ghadira road.

Within this context it was highly unethical for the Ministry of Transport to invite the said consultant to sit alongside the ministry’s officials in a recent meeting with NGOs and the press. The ministry’s subsequent declaration that it would oppose proposals for beach concessions in the area can only be interpreted as an attempt to correct its ethical short-sightedness!

A further important statement was made last week by nature itself. The sea level temporarily rose to the road level, thereby reinforcing arguments already brought forward that the existing road during the winter months is doubling up as a coastal defence to the Nature Reserve, which, being sited on former salt pans is partly below sea-level.

At this point in the debate, matters are slightly less nebulous than they were in the beginning. The declaration by the Minister for the Environment that all the required studies will be carried out is welcome.

However, such a declaration risks being viewed as a cheap attempt at damage control unless an explanation is forthcoming as to why these studies have not yet been finalised notwithstanding that they were requested by Mepa way back in 2005!

It is clear that, until recently, some thought that these studies could be dispensed with only to realise at the 11th hour that the environmental lobby is vigilant and will keep insisting that the government, through its various agencies, should shoulder its responsibilities!

Ghadira Report Released by AD

ghadira-nature-reserve

Following a formal request which I made to MEPA on behalf of AD in terms of the Aarhus Convention (access to environmental information) MEPA has this morning released the report entitled  “Proposed Review of Ghadira Road Options Nodes NA3-NA4”. This was  produced in 2005 by AIS and commissioned by the Transport Authority.

This report is being released by AD in order that the public be better informed. A transparent government ould have released it around three years ago !

Foresta 2000

foresta-2000

 

 

Din il-pjanta ta’ Foresta 2000 ippubblikata mill-Birdlife u Din l-Art Helwa turi kif it-triq tal-Għadira ser tgħaddi eżatt minn ġo nofs il-proġett Forest 2000.

Jiġifieri l-Ministeru ma jafx x’inhu jgħid meta jinsisti li l-proġett tat-triq fl-Għadira mhuwiex ser jeffettwa Foresta 2000.

Tiftakru kemm rajna pampaluni jippużaw u jħawwlu siġar f’Forest 2000 matul ix-xhur li għaddew ? Kemm kien hemm min tkaża meta seħħ każ ta’ vandaliżmu li bħala riżultat tiegħu inqerdu s-siġar kollha. Issa il-Gvern qed jipproponi li jgħaddi t-triq !

Hemm min jaf x’inhu jagħmel ?

It-Triq Tal-Għadira

ghadira-nature-reserve

 

Il-Gvern permezz tal-Ministru tat-Trasport Austin Gatt ħabbar il-ħsiebijiet tiegħu dwar il-kostruzzjoni ta’ triq ġdida fl-Għadira wara r-riżerva naturali kif ukoll wara l-villaġġ tad-Daniżi.

 

Intqal li saret konsultazzjoni mal-Birdlife u mal-Management tal-villaġġ Daniż. Tajjeb li saret konsultazzjoni magħhom, imma mal-pubbliku f’Malta s’issa għadha ma saret l-ebda konsultazzjoni. L-ambjent f’Malta la hu tal-Birdlife u l-anqas tal-Management tal-villaġġ Daniż iżda tal-poplu Malti.

 

Li kieku ma tkellmux il-gazzetti ħadd ma kien ikun jaf x’inhu għaddej.

 

 

It-triq kif proposta mill-Gvern ma tistax issir għax tmur kontra l-provedimenti tal-Habitats Directive tal-Unjoni Ewropea. Taħt il-provedimenti ta’ din id-direttiva ir-riżerva naturali tal-Għadira hi diġa dikjarata Special Area of Conservation (SAC). Fl-inħawi tal-SAC ma jista’ jsir xejn li jista’ jkollu impatt fuq l-area protetta. Triq ewlenija bħal dik proposta bil-movimenti u d-dwal li jkollha ser teffettwa l-funzjoni tal-SAC.

 

L-Unjoni Ewropea ma tagħtix fondi għal proġetti li jeffettwaw SACs. Jiġifieri jekk id-Direttorat tal-Ambjent fi ħdan il-MEPA jagħmel dmiru u jipproteġi r-riżerva tal-Għadira t-triq ma ssirx. Jekk min-naħa l-oħra  d-Direttorat tal-Ambjent jagħlaq għajnejh u ma jagħmel xejn, jinstab mod kif l-Unjoni Ewropea tkun infurmata dwar x’qiegħed jiġri f’dan il-pajjiż li fih “bil-kliem” l-ambjent jingħata importanza kbira.

 

 

Jekk tintmiss it-triq eżistenti tal-Għadira, fi ġranet ta’ maltemp, meta jaħkem il-Grigal, dak kollu li hemm fir-riżerva jitkaxkar. Hi it-triq eżistenti li qed tipproteġi r-riżerva.

 

Hemm imbagħad l-effett fuq il-villaġġ tad-Daniżi. Dan inbena bħala faċilita turistika għall-kwiet, f’atmosfera rurali. Il-bini ta’ triq prinċipali kważi ħajt ma ħajt mal-villaġġ ser teqred l-identita ta’ dan il-villaġġ.

 

Hemm ħafna affarijiet oħra x’jingħadu dwar din it-triq pero’ naħseb li dan t’hawn fuq hu l-iktar importanti għalissa.