Making hay …….. in St George’s Bay

The 23-storey Pender Gardens high-rise is nearly completed, after nearly 10 years of continuous construction activity. The application for the 31-storey Mercury House was approved last month and next Thursday, the Planning Authority Board will consider planning application PA2478/16 submitted by Garnet Investments Limited in respect of a substantial stretch of land along St George’s Bay on the outskirts of Paceville St Julian’s.

The applicant has requested the following: “Demolition of all existing buildings forming part of St. George’s Bay Hotel and ancillary facilities, Dolphin House, Moynihan House and Cresta Quay. Construction of Parking facilities, Hotels and ancillary facilities, Commercial Area, Multi Ownership holiday accommodation, Bungalows, Language school with accommodation. Restoration of the Villa Rosa and upgrading of the facilities including parking facility, kitchen and toilets all below existing site levels within the Villa Rosa Area to address catering facilities/wedding hall.”

The project includes mixed-uses covering a total site area of 48,723 square metres, a building footprint of 18,345 square metres and a total gross floor area of 82,917 square meters.

It is a small part of the area that was tentatively tackled by a draft Masterplan for Paceville which, after being rejected by public opinion was sent back to the drawing board. I consider it highly unethical for the Planning Authority to proceed with considering this application after the clear and resounding verdict of public opinion. As a minimum, the consideration of this application should have been postponed until a new, reasonable and acceptable Masterplan has received the go-ahead. A minimum effort at achieving consensus as to what development is acceptable is essential.

The Planning Authority is unfortunately insensitive to public opinion. It is amply clear that it, and those who appoint most of its Board members, are on the same wavelength as the development lobby, which is hell-bent on making hay while the sun shines. At this point in time, it is the turn of the St George’s Bay area.

The project is obviously recommended for approval in the 43-page report from the Planning Directorate.

The basic point of contention with such large-scale projects is that they are considered in isolation. Most of them would never get off the drawing board (real or virtual) if the consolidated impact of all neighbouring projects (existing or in the pipeline) are taken into account. Earlier this week, I had the opportunity to address similar concerns to the EIA public consultation on the db Group ITS site project.

Five large-scale projects are earmarked for St George’s Bay. Each will generate considerable havoc from excavation throughout construction and right through operation in the whole St George’s Bay area. Cumulatively it will be hell. Who cares?

Way back in 2006, when the Strategic Environmental Assessment Directive of the EU was about to be implemented in Malta, the Lawrence Gonzi – George Pullicino tandem rushed through the approval of the Local Plans in such a manner as to ensure that the accumulated environmental impact resulting from their implementation was not scrutinised and acted upon. The present state of affairs is the direct result of that irresponsible Gonzi-Pullicino action 12 years ago.

The Environment and Resources Authority (ERA) occasionally tries to patch things up. For example, within the framework of the ITS EIA exercise ERA suggested that the traffic assessment of the ITS and the Villa Rosa projects be consolidated. This has, however, been avoided: a case of too little, too late.

So where do we go from here?

The development lobby is maximising its efforts to make hay while the sun shines. In reality, a consolidated mess is taking shape with massively built-up areas in a relatively restricted space punctured by high rises mimicking phallic symbols of all shapes and sizes spread all over the place. Pender Place has 23 floors. Mercury House will have 31. The ITS phallus will have a 37-floor residential tower. The Villa Rosa/Cresta Quay project will have more modest heights.

Next Thursday, the Planning Authority has the opportunity to scrutinise the proposal for this Villa Rosa-Cresta Quay project. We will see once more the extent to which the concrete lobby still holds the Authority by its balls – obviously where this is applicable.

 

published in The Malta Independent on Sunday – 18 February 2018

Advertisements

Is-sit tal-ITS f’Pembroke : l-art pubblika, profitti tal-privat

L-iżvilupp tas-sit preżentement okkupat mill-Istitut tal-Istudji Turistiċi f’Pembroke reġa’ fl-aħbarijiet. Is-settur pubbliku jipprovdi l-art filwaqt li l-Grupp dB jimpala l-euro, bil-miljuni.

Matul din il-ġimgħa l-media tkellmet dwar il-miljuni li qed jiġi miftieħem li jitħallsu għall-bejgħ eventwali ta’ sulari sħaħ fit-torrijiet tal-Grupp dB. Dawn m’humiex flejjes li ser jitħallsu għal xiri ta’ propjetà fuq il-pjanta, għax s’issa la hemm permessi u l-anqas għad m’hemm l-ebda pjanta ffinalizzata. L-awtoritajiet tal-ippjanar għadhom fl-istadji inizzjali fl-eżami tagħhom tal-proġett propost: l-Awtorità għall-Ambjent u r-Riżorsi (ERA) għadha kif bdiet il-proċess ta’ konsultazzjoni statutorja dwar l-Istudju tal-Impatt Ambjentali (EIA) li għandu għaddej sat-12 ta’ Frar. Minkejja li l-ERA għad tista’ tirrakkomanda tibdil, żgħir jew kbir, fil-proġett wara li tkun ikkunsidrat bir-reqqa l-EIA, qiesu li l-iżviluppaturi huma ċerti li mhu ser ikun hemm l-ebda konsiderazzjoni ta’ ippjanar jew ambjent li ser ixxekkel dak li bosta jqiesu li hu proġett żejjed u mhux meħtieġ.

Id-dokumenti ppreżentati għall-iskrutinju pubbliku huma sostanzjali u voluminużi. Imma possibilment fihom in-nieqes u għaldaqstant diġa ktibt lill-Awtorità tal-Ambjent u r-Riżorsi biex tirrimedja u tippubblika dak li ġie identifikat bħala nieqes s’issa.

Dokument ta’ interess li insibuh fuq is-sit elettroniku tal-ERA huwa l-Project Description Statement (PDS) li tħejja minn ditta (partnership) ta’ periti li ftit kienet magħrufa s’issa. Din id-ditta iġġib l-isem ta’ Landmark Architects u jirriżulta li titmexxa mill-ekx-Ministru tat-Trasport il-Perit Jesmond Mugliett.

Fil-paġna 5 ta’ dan id-dokument, il-Perit Mugliett jikteb hekk “Nhar it-2 ta’ Frar 2017, il-Gvern u s-soċjetà dB San Gorg Property Limited iffirmaw il-kuntratt għat-trasferiment tal-art li dwarha ħarġet sejħa pubblika għall-proposti. Kemm il-Gvern ta’ Malta kif ukoll is-soċjetà dB San Gorg Property Limited jaqblu li l-evalwazzjoni tal-proġett ta’ żvilupp m’għandhiex iddum iktar mill-perjodu minimu stabilit mill-leġislazzjoni tal-ippjanar. (On the 2nd of February 2017, the Government of Malta and dB San Gorg Property Limited signed the contract for the granting of the RFP site. Both the Government of Malta and dB San Gorg Property Ltd. agree that evaluation of the project development should not extend beyond the minimum time frames established by Planning Law.) Fil-fehma tiegħi dan ifisser li l-Gvern diġa rabat idejn l-Awtorità tal-Ippjanar dwar kif din għandha topera f’dan il-kaz.

L-iżviluppatur donnu mhux inkwetat li l-Masterplan imfassal għal Paceville ġie skartat u beda l-proċess biex dan jitfassal mill-ġdid u dan wara l-konsultazzjoni pubblika mqanqla li kellna lejn tmiem l-2016. L-awtur tal-PDS fil-fatt jinfurmana li “L-Gvern ta’ Malta u s-soċjetà dB San Gorg Property Limited komplew bin-negozjati, u eventwalment qablu li ma kienx fl-interess tal-proġett, tal-industrija Maltija tat-Turiżmu u tal-ekonomija Maltija li joqgħdu jistennew li jkun konkluż dan il-Masterplan.” (The Government of Malta and dB San Gorg Property Limited continued with negotiations, eventually coming to an agreement that it was not in the interest of the project, the Maltese Tourism Industry and the Maltese economy to wait for the conclusion of this masterplan.)

Dan, fil-fehma tiegħi jimmina l-proċess ta’ konsultazzjoni pubblika. Għax liema huma r-regoli u policies tal-ippjanar li l-Awtorità tal-Ippjanar ser isegwi fuq is-sit illum okkupat mill-Istitut tal-Istudji Turistiċi? Il-proposta diġa tidher ċar li tmur kontra dak li jipprovdi l-pjan lokali tal-2006 li hu applikabbli. Allura fuq liema kriterji ser tkun ivvalutata l-proposta ta’ żvilupp?

Xi żmien ilu konna infurmati li l-ebda żvilupp fl-inħawi m’hu ser jitħalla jibda sakemm ikun konkluż Masterplan ġdid għal Paceville. Dakinnhar kien emfasizzat li l-proposti dwar is-sit tal-ITS f’Pembroke seta jkun evalwat biss wara l-approvazzjoni tal-Masterplan ġdid għal Paceville.

Din hi wegħda li kienet skartata kompletament!

Kien ukoll ġie mwiegħed li l-Masterplan il-ġdid ma kienx ser ikun imniġġes minn kunflitti ta’ interess. Tgħid din il-wegħda ser tkun injorata ukoll?

 

ippubblikat fuq Illum : Il-Ħadd : 21 ta’ Jannar 2018

Pembroke ITS site : public land – private profits

 

The redevelopment of the site currently occupied by the Institute for Tourism Studies (ITS) in Pembroke is again in the news: the public sector is providing the land while the dB Group will rake in the profits – amounting to millions of euro.

During the week various media outlets focused on the millions being forked out for the eventual purchase of entire floors in the dB Group towers. These are not the price for purchase of property still on plan, because no permits have yet been issued, nor have the plans as yet been finalised. The examination of the proposed development by the planning authorities is still in its initial stages: the Environment and Resources Authority (ERA) has just kicked off the Environment Impact Assessment (EIA) statutory consultation period, which is scheduled to run until 12 February. Notwithstanding the fact that the ERA may recommend changes to the planned project as a result of its consideration of the EIA, it seems that the developers are sure that there will be no planning or environmental issues which can put the breaks to what most people consider an ill-advised project.

The documents presented for public scrutiny are voluminous, but possibly incomplete, and I have already written to ERA to complete the missing information gaps, at least those identified to date.

A basic document of interest, available on the ERA website, is the Project Description Statement (PDS) – the work of an as yet unknown partnership of architects going by the name of “Landmark Architects”. It transpires that this partnership is headed by former Transport Minister Jesmond Mugliett, who writes on page 5 of the PDS : “On the 2nd of February 2017, the Government of Malta and dB San Gorg Property Limited signed the contract for the granting of the RFP site. Both the Government of Malta and dB San Gorg Property Ltd. agree that evaluation of the project development should not extend beyond the minimum time frames established by Planning Law.” To my mind this signifies that the government has already tied the Planning Authority’s hands as to how it should operate in this case.

The developer is not (apparently) worried that the Paceville Master Plan was sent back to the drawing board after the agitated public consultation late in 2016. The author of the PDS, in fact, informs us that “The Government of Malta and dB San Gorg Property Limited continued with negotiations, eventually coming to an agreement that it was not in the interest of the project, the Maltese Tourism Industry and the Maltese economy to wait for the conclusion of this masterplan.”

Does this not undermine the whole consultation process? What planning rules and/or policies will the Planning Authority follow at the former ITS site? On what criteria will the development proposal be evaluated – it already clearly goes beyond what is permitted in the applicable 2006 local plan.

Some time ago, we were informed that no new developments in the area would be given the go-ahead until such time as a new draft Paceville Master Plan was launched. It was then emphasised that the proposals for the Pembroke ITS site can only be properly assessed when the Paceville Master Plan is in place.

This pledge has been blatantly ignored by the development proposal.

It was also pledged that the new proposed Master Plan will not be tainted by conflicts of interest as was the original one. Will this pledge also be ignored?

published in The Malta Independent on Sunday : 21 January 2018

Marsa: a planning mess

turkish-cemetry-marsa-malta2

The Chamber of Architects has taken the Planning Authority to task on the piecemeal local plan reviews that it has been churning out, one at a time. The latest tirade was with reference to a partial review of The Grand Harbour Local Plan (originally published in 2002) specifically with respect to a Marsa Park Site.

We have just concluded a public discussion on a Masterplan for Paceville, which was shredded by public opinion and sent back to the drawing board.

Earlier, we had the Planning Authority itself contesting whether Local Councils, NGOs and the Environment and Resources Authority  had a right to contest the decision to permit high-rises in Townsquare Sliema and in Imrieħel.

To make matters worse, instead of consolidating the environmental regulatory functions of the state, this government has opted to deliberately fragment them, thereby ensuring their reduced effectiveness by design.  In a small country such as Malta, it pays to have one consolidated authority  directed by environment professionals through whom land use planning responsibilities should be accountable.

Land use planning needs to be more focused but holistic in nature. The Chamber of Architects aptly makes the point that focusing the efforts of the partial review of the Grand Harbour Local Plan specifically on “a Marsa Business Park” without considering this within the context  of a much needed regeneration of Marsa would be a futile exercise. The decay of Marsa as an urban centre needs to be addressed at the earliest opportunity and this will not be done through piecemeal local plan reviews but through comprehensive planning “which ought to include community needs, road transport re-alignment, environment improvement and flooding mitigation measures”.

These are the basic issues which should be addressed by a local plan review concerning Marsa. Tackling major infrastructural and social problems facing the Marsa community should take precedence over any proposal for the redevelopment of the Marsa Park site. It is the whole of Marsa that should be addressed and not just one tiny corner.

The partial local plan review is ignoring the local community, just like its cousin the Paceville Masterplan did some months ago. Many years ago we learned that “planning is for people”. This seems to be no longer the case as, according to the Planning Authority, planning is apparently for business hubs, high-rises and, obviously, for developers. They seem to be very well connected, thereby ensuring that they occupy the first items of this government’s land use planning agenda.

Marsa has been forgotten over the years. With the closure of the Marsa power station now is the appropriate time to consider the various accumulated impacts on the Marsa community in order that an integrated approach to addressing them is identified. Planning is for people. That means that the Marsa community should be actively involved when these plans are being formulated, including at the drawing board stage. Land use planners should stimulate the Marsa community to speak up and involve itself in drawing up a blue print for its future.

The regeneration of Marsa is an urgent matter which should not be left unattended.

published in The Malta Independent on Sunday : 15 January 2017

Paceville: protecting the underdogs

paceville-mp-land-use

As the short time allotted for public consultation on the proposed first draft of the Paceville Masterplan approaches its conclusion, it is time for some commonsense to prevail at the Planning Authority.

On TV, last Thursday, we heard the Authority’s Executive Chairman Johann Buttigieg plotting the first steps of a U-turn on a number of contentious issues contained in the draft. This U-turn is welcome, as it is clearly being planned on the basis of the reactions of the public and the environmental NGOs to the proposed Paceville Masterplan.

The most serious point at issue is the extent to which the nine projects around which the Masterplan is woven will engulf properties belonging to residents and small scale business people. It will hopefully now be clear, once and for all, that no one will be coerced through threats of compulsory purchase (veiled or otherwise) to make way for any one of the nine projects.

Mr Buttigieg declared that “no-one would be forced to sell”. While this declaration is welcome, it is certainly not sufficient. Everyone is aware that there are many ways through which pressure may be brought to bear on residents and business people. It is certainly time for all stakeholders to be vigilant and present a common front.  Being constantly on the look-out may help  identify those triggering incidents such as that of the car which was recently set ablaze in St George’s Park at Paceville at the same time as residents were meeting elsewhere to discuss their reactions to the proposed Paceville Masterplan.

The Planning Authority should be proactive. It should be at the forefront when it comes to taking initiatives that make sense. A case in point is the need to implement the public domain legislation recently enacted by Parliament  in order to better protect both the coastline and the foreshore to a minimum distance of fifteen metres from the shoreline.

It is well known that there is just one stretch of coastline within the draft Paceville Masterplan boundaries that is not intensively developed: the Cresta Quay site, also referred to as the Villa Rosa site 3. This site is crying out for protection and it can be protected, yet the draft masterplan – ignoring public domain legislation  – earmarks this site for a number of high rise blocks.

This proposal, in addition to reducing the recently approved public domain legislation to hot air, runs counter to the draft masterplan philosophy of siting high-rise developments away from the coast. It seems that someone may have been pressured into having second thoughts when the Masterplan was being drafted. There is no other reasonable explanation for this contradiction.

The public consultation has revealed that the drafting of the Paceville Masterplan was flawed, as it ignored issues of fundamental importance.  However, there is till time for the Planning Authority to align the Masterplan to the expectations of stakeholders. The belated declaration by Johann Buttigieg that (after all) he too has reservations on some aspects of the Masterplan is a step in the right direction. Hopefully, this will be reflected in an overhaul of the draft and in the production of a new one which respects the stakeholders who have invested in Paceville over the years.

The investors promoting the nine projects which the Planning Authority identified may contribute to the regeneration of Paceville only if they tread carefully in full respect of residents and small-scale business people who have shaped the present-day Paceville, warts and all.

So far, this has not happened, as some of the developers think that they have some God-given right to ride roughshod over one and all. Unfortunately, the Planning Authority has generally obliged, as it has rarely been on the side of the those bearing the brunt of the bulldozer culture that has to date reigned supreme in land-use planning issues.

We await the second draft of the Paceville Masterplan, in the hope that the Planning Authority will turn a new page and assume its rightful place in protecting the underdogs.     

published in The Malta Independent on Sunday: 20 November 2016

Id-9 proġetti għal Paceville

paceville-4

Il-Master Plan ta’ Paceville hemm bżonn isir mill-ġdid. Dan hu meħtieġ għax min fassal il-pjan ma tax każ ta’ ħafna affarijiet. Reviżjoni ma hi ser issolvi xejn. Jeħtieġ li jinbidel kompletament.

L-ikbar fundamentali żball li sar, fil-fehma tiegħi, hu li l-pjan għal Paceville hu bbażat fuq id-9 proġetti kbar li hemm pendenti. Dan il-fatt fih innifsu jagħti messaġġ li l-pjan għal Paceville qiegħed hemm biex jaqdi lill-iżviluppaturi li hemm wara dawn il-proġetti. Jista’ jingħad li ma hemm xejn mistur dwar dan kollu u li l-ħsieb kien li l-iżvilupp ma jsirx bil-biċċiet imma li jkun wieħed li jħares lejn l-istampa kollha.

Imma biex jaqdu lil dawn id-9 żvilupaturi dawk li fasslu l-pjan ma tawx kaz tal-fatt li hemm mijiet ta’ persuni li tul is-snin investew ħinhom u ġidhom f’Paceville. Min f’daru u min fin-negozju tiegħu. Huma dawn in-nies li bnew Paceville li hemm illum: bil-preġji u d-difetti kollha tiegħu.

Il-pjan ta’ Paceville jeħtieġ li nanillazzawh fuq dan u mhux fuq ħsibijiet immaġinarji.

Kif jiġri dejjem, min jifhem biss biċċa żgħira minn dak li jkun qed jiġri jfittex li jiddrammatizza l-affarijiet. Dan iservi biss biex isaħħan l-irjus u ma jagħti l-ebda kontribut għal diskussjoni serja.

 

 

 

 

Konsultazzjoni ħierġa minn widnejna?

cpd-external-emergency-plan

 

Bħalissa qed jikkonsultawna spiss. Jekk jagħtux kaz ta’ dak li ngħidu, imma, dik ħaġa oħra.

Kultant naħseb ukoll li ma jagħmilx ġid li numru ta’ affarijiet importanti issir id-diskussjoni pubblika dwarhom fl-istess ħin.

Bħalissa d-diskussjoni pubblika hi iffukata fuq ta’ l-inqas tlett affarijiet importanti: fuq il-budget, fuq il-Masterplan ta’ Paceville u fuq l-impjant tal-gass fil-power station ta’ Delimara.

Iż-żmien għal dawn il-konsultazzjoniet pubbliċi hu limitat.

Il-konsultazzjoni pubblika dwar Paceville hi ikkumplikata minħabba it-tip ta’ proposti li ġew ippreżentati. Ir-rapport trid taqrah numru ta’ drabi biex tibda tifhmu mhux biss għax ikkumplikat minnu innifsu imma ukoll għax min kitbu qagħad jilgħab bil-kliem. Bil-konsegwenza li hemm numru ta’ proposti kważi moħbijin.

Min-naħa l-oħra l-konsultazzjoni pubblika dwar l-impjant tal-gass tirrikjedi eżami ta’ dokumentazzjoni voluminuza imqassma f’madwar 300 file elettroniku. Il-konsultazzjoni pubblika ser iddum 4 ġimgħat: iktar kien jagħmel sens kieku kella iddum 4 xhur minħabba li biex issir sewwa tirrikjedi ħafna xogħol.

Meta wieħed iqis li ħafna drabi jkunu l-istess nies li jinvolvu ruħhom f’din il-konsultazzjoni pubblika malajr nifhmu id-diffikultajiet li jkollna għax il-ħin hu limitat għal kulħadd.

Il-kosta tagħna lkoll?

paceville-mp-land-use

Il-Masterplan għal Paceville huwa mifrux fuq medda kbira ta’ art. Għax Paceville tmiss ma’ Pembroke, mas-Swieqi u anke ma’ San Ġiljan. Imma għandha ukoll biċċa kosta twila ġmielha, li skond minn fejn tibda tkejjilha tista’ ġġebbed bejn tlieta u erbgħa kilometri.

Il-pjan jgħidilna li ser ikun possibli li tippassiġġa mal-kosta kollha.  Imma r-realtà hi li kosta kollha ta’ Paceville hi mimlija konċessjonijiet  li l-Gvern tul is-snin ta lill-privat għan-negozju, prinċipalment negozju konness mal-baħar jew mal-lukandi.

Waqt il-laqgħa ta’ nhar l-Erbgħa tal-Kumitat Parlamentari tal-Ambjent u l-Ippjanar, id-Dipartiment tal-Propjetà tal-Gvern ippreżenta pjanta li turi il-propjeta kollha li għandu l-Gvern f’Paceville, biċċa waħda tmiss ma l-oħra. F’xi każi l-pjanta turi bejn 4 metri u 5 metri mill-kosta l-ġewwa li huma riżervati għall-aċċess tal-pubbliku, għalkemm ħafna drabi m’huwiex ċar kif dawn il-passaġġi riżervati għalina lkoll tista’ tasal għalihom.

F’Mejju li għadda b’vot unanimu l-Parlament approva emendi għall Kodiċi Civili li permezz tagħhom ġie ċċarat li l-kosta hi propjetà pubblika. Jiġifieri din hi tagħna lkoll. Mill-inqas sa 15-il metru l-ġewwa minn fejn iħabbat il-baħar. Imma fejn il-mewġ jibqa’ dieħel iktar il-ġewwa, il-15-il metru jiżdiedu ukoll, skond is-saħħa tal-baħar.

Is-serjetà kienet titlob li billi l-ewwel abbozz tal-Master Plan ta’ Paceville ġie ippubblikat għall-konsultazzjoni pubblika bosta ġimgħat wara li l-Parlament esprima ruħu b’mod tant ċar, dan kellu jagħti kaz b’serjeta kbira ta’ dak li ddeċieda l-Parlament.

Id-deċiżjoni tal-Parlament dwar il-kosta u l-art ta’ mal-plajja tfisser ħafna iktar minn sempliċi passaġġ fejn jgħaddu n-nies. Imma sfortunatament, il-konsulenti li fasslu l-Master Plan ma fehmu xejn minn dan u minflok ma fittxew kif ser jgħaddu lura lin-nies it-tgawdija ta’ partijiet ikbar mill-kosta qed jipproponulna li jkompli r-renju tal-konkos u l-azzar bi blokki għoljin tletin sular li jistgħu jinbnew viċin tal-kosta.

Issa jew hemm min ma jafx x’inhu jagħmel inkella qed jippruvaw jgħaddu lil kulħadd biż-żmien. Għax jekk il-Parlament qed jaqbel magħna u qiegħed jgħidilna li l-kosta hi tagħna lkoll, kif jiġu dawn il-konsulenti tal-Awtorità tal-Ippjanar jgħidulna li din ser jibqgħu jgawdu minnha l-ftit, biex fiha tibqa’ issir l-adorazzjoni tat-torrijiet?

pubblikat f’Illum : 16 t’Ottubru 2016

Claiming back our coast

portomaso-st-julian-s

 

The  Paceville Master Plan is rightfully subtitled : Malta’s prime coastal location.  However, it considers the coast as a money-spinner and completely ignores Parliament’s decision earlier this year to codify the importance of the coastal area through its inclusion in legislation regulating the public domain.

The Paceville Master Plan issued for public consultation on 26 September was the first opportunity for the Planning Authority, on behalf of the government – which instructs it on policy initiatives – to flesh out the bones of the declarations made in the public domain legislation, approved by Parliament in May. That it did not do so casts considerable doubt as to whether the unanimous approval by Parliament of the public domain legislation is another political gimmick.

The Paceville Master Plan covers a large tract of land bordering Pembroke to the north, Swieqi to the west, St Julian’s to the South and coastal waters to the east.  The Paceville coastline is extensive: it adds up to anything between three and four kilometres, depending on the manner of measurement.

We have been told that the Paceville coastline will be accessible through a passageway that will be created along the coast. As a matter of fact, most of the Paceville coastline is already dotted with commercial development on land which is either public property or else is subject to servitudes in favour of the state. During last Wednesday’s sitting of Parliament’s Environment and Development Planning Committee, representatives of the Government Property Department presented a drawing indicating all this property along the Paceville coastline. In a number of instances, the drawing submitted indicated passageways of a width varying between four and five metres along the coast which are obviously intended for public access, even though it is not always clear how one would be able to find their points of entry and exit.

Parliament’s approval of amendments to the Civil Code approved in May lays robust legal foundations for the protection of the coast. The government has been entrusted with protect the coast on behalf of future generations, hence it belongs to all of us, in trust, on behalf of those future generations.  The coastal perimeter extends to a minimum of 15 metres from the shoreline. To this, the newly-approved legislation adds the foreshore, which extends as far as the reach of the largest wave – a reach that can be substantial in those parts of the coastline that are exposed to the open sea.

Large sections of the Paceville coastline are developed, but there are still small pockets which are either not developed or else contain development that is not intensive. A proactive Master Plan would have identified this as an opportunity for plotting the way forward in implementing a programme for the protection of the Paceville coast.  Unfortunately, it seems that the consultants to the Planning Authority were not briefed on the matter and as a consequence there is a real danger that this opportunity will be lost.

After the current public consultation is concluded, the Planning Authority will have to examine the comments made and consider the extent to which such comments can and should be taken into consideration in the second draft of the Master Plan.

The Authority should take on board the public domain legislation in respect of the coast and plan for its implementation when it revises the first draft of Paceville Master Plan.  In the short term, this should be done in relation to those areas which are still undeveloped or underdeveloped. I would also expect the Planning Authority to plan for the longer timeframe in respect of those sections of the coastline which are already intensively developed.

This leaves one other basic issue: land reclamation. I feel that, on a policy level, Labour’s land reclamation policy is the marine equivalent of the Nationalist’s widely criticised 2006 rationalisation exercise through which the boundaries of development were irresponsibly extended.  Labour will be extending the limits to development outwards towards the sea whilst the Nationalist-led government extended the said limits towards the countryside.

The proposed Master Plan for Paceville recommends land reclamation off the Dragonara/Portomaso coastline. This is an ill-thought proposal as the area identified for land reclamation will be an extension of possibly the most intensively developed part of the Paceville coast. This proposal should undoubtedly be revisited as commonsense suggests that rather than increasing development in the area, this should, in the long term, be curtailed.

The proposed Paceville Master Plan should be utilised as a planning tool for adequate coastal management. It can, at this point in time, also be the optimum vehicle for translating the public domain legislation into practical policies through which we can start the process of reclaiming the coast for future generations.

This is an opportunity which should not be missed.

published in The Malta Independent : 16 October 2016

Il-Master Plan ta’ Paceville u l-aċċess għall-kosta

new parliament building Malta2

Fil-Parlament il-bieraħ attendejt għal laqgħa ta’ diskussjoni dwar il-Master Plan għal Paceville.

F’din il-laqgħa l-Kumitat Parlamentari għall-Ambjent u l-Ippjanar kompla d-diskussjoni mibdija f’seduta oħra. Rappresentanti tat-Taqsima tal-Propjeta’ tal-Gvern wieġbu xi mistoqsijiet li kienu għadhom pendenti kif ukoll ippreżentaw xi informazzjoni li kienet mitluba mill-Kumitat dwar art tal-Gvern f’Paceville.

F’intervent li jiena għamilt ġbidt l-attenzjoni tal-Kumitat Parlamentari għall-Ambjent u l-Ippjanar li ftit xhur ilu, l-Parlament kien approva emendi għall-Kodiċi Ċivili li permezz tagħhom ikkjarifika l-ħtieġa tal-ħarisen tal-kosta. Ma jagħmilx sens, żidt ngħid, li wara li l-Parlament approva dawn l-emendi għall-Kodiċi Ċivili b’vot unanimu issa jiġi dan l-abbozz ta’ Master Plan li prattikament jinjora dawn l-emendi.

Din hi materja kruċjali għax għandu jkun assigurat li l-aċċess għall-kosta jkun wieħed reali għal kulħadd.

Ara ukoll

Malta Today: Paceville masterplan ‘makes mockery’ of new coastal protection law, AD warns.

The Malta Independent: The Paceville Master Plan must be sent back to the drawing board.