It-tigra taċ-Ċaqnu sparixxiet?

Għax hekk bil-fors taħseb meta taqra s-sentenza tal-Maġistrat Mifsud li l-ġimgħa l-oħra illibera liċ-Ċaqnu mill-akkuża li kellu zoo illegali fil-kumpless Montekristo fil-limiti ta’ Ħal-Farruġ.

Dan minkejja li kulħadd jaf mhux biss biz-zoo illegali, imma ukoll bit-tigra li għamlet għal tifel u weġġgħetu serjament.

Fis-sentenza taghha l-Qorti qalet hekk :
“Il-Prosekuzzjoni f’dan il-kaz naqset li tipproduci lista tal-annimali li seta’ kien hemm fil-lok in kwistjoni fil-jum tal-incident. Lanqas fil-Proces Verbal esebit f’dawn l-atti ma tinstab lista ta’ annimali li kien hemm jekk kien hemm f’dak il-jum. Fil-process kollu l-Qorti sabet ritratti biss ta’ annimal wiehed u li jidher li hija tigra. Allura kif xi hadd jippretendi lil din il-Qorti issib lil xi hadd hati li zamm zoo meta min investiga hadd ma ndenja ruhu jaghmel lista tal-annimali li kien hemm, jekk kien hemm, biex ikun ippruvat li kien hemm zoo skont id-definizzjoni tal-ligi?”

Il-fatt li l-Pulizija ma ippreżentatx provi għandu jħassibna ħafna. Iktar u iktar meta nafu li ċ-Ċaqnu għandu l-fama li jipprova jagħmel li jrid. Ħafna drabi jirnexxielu għax min għandu l-obbligu li jwaqqfu ma jagħmel xejn.

Ma nafx jekk dan kienx kaz ta’ negligenza mill-Pulizija inkella jekk hemmx spjegazzjoni oħra, agħar minn hekk. Nittama li l-Kummissarju tal-Pulizija isib il-ħin biex jinvestiga lill-Pulizja li għamlu din il-froġa u wara jiehu l-passi li jirriżultaw meħtieġa.

Għax it-tigra taċ-Ċaqnu ma sparixxietx. Huma l-pulizija li qed jisparixxu, ftit ftit.

A gambit declined

 

The setting up of a pre-electoral alliance is a complex exercise. Alternattiva Demokratika recognised the strategic importance of forming pre-electoral alliances a long time ago – in fact, prior to the 2008 general election, it had (unsuccessfully) taken up such an initiative itself.

The actual result of the 2008 general election was so close that any pre-election alliance would have had a substantial impact on the final result. This was very clear in the polls commissioned and published in the run-up to that general election.  The difference in votes on a national level between the PN and the PL in the March 2008 general election was a mere 1580, with AD receiving 3810 votes first count votes.

When examining the possibility of forging a pre-election alliance there is generally a choice between two approaches to take: either a principle-based approach or a pragmatic one.

The principle-based approach for a pre-election alliance seeks a long-term view based on building bridges that can possibly withstand the test of time. A pre-election alliance based on principles is based on an agreed shared vision. Even if it is not all-encompassing, this can be easier for voters to identify with as it entails a positive proposal: the shared vision.

On the other hand, the pragmatic approach is one aimed solely at the desired result. It is arithmetically driven. It can signify the lumping together under one umbrella of all sorts of views with (possibly) a minimum common denominator.

The National Front pre-electoral alliance set up by Simon Busuttil and Marlene Farrugia  was, in my opinion, one of the latter. Not only did it include the Nationalist Party and the Democratic Party but also the fringe elements of the PN itself, which had previously been weeded out over the years as undesirables.

The National Front was a pragmatic exercise to the extent that an analysis of the actual votes cast clearly shows that the PD link with the PN resulted in no votes being added to the PN by the PD.  Some may argue, for example,  that votes cast for PD candidates in the fifth district (Marlene Farrugia’s home district),  helped the PN turning the tides on Labour by recapturing Labour’s fourth seat. This is not so, as the gain of an additional seat by the PN on the fifth district was exclusively due to boundary changes: the village of Marsaxlokk having been moved to the third district and it being substituted by the hamlet of Ħal-Farruġ from the sixth district.

The PN/PD alliance failed in its major arithmetic objective as it is clear that it failed to attract a significant number of disgruntled voters. Actually, it rather repelled them with its continuous negative messages and sent most of them back to Labour. Unfortunately, this failed attempt will dissuade any other attempt at alliance-building in the immediate future, as no political party enjoys being taken for a ride, as was Simon Busuttil’s party.

Declining the invitation to join  the National Front as an appendix to the PN  was the correct response from Alternattiva Demokratika. It was an exercise in foresight that has been proved right. Listening to “independent” journalists and self-centred intellectuals advocating the Busuttil/Farrugia National Front was a very sad experience, as these were the same people who should have taken the PN itself to task for its internal contradictions on issues of good governance. By endorsing the PN-led National Front, unfortunately, they ended up endorsing the PN’s misdemeanours when they should have been at the forefront of those insisting that the PN clean up its act before claiming any right to wear the suit of shining armour.

In another context, it was former PN Finance Minister Tonio Fenech who made the most appropriate statement earlier this week in the Malta Independent. Answering his own rhetorical question as to what the Nationalist Party stands for, Tonio Fenech replied: “The only true answer I can give is, I don’t know”.

And so say all of us.

published in the Malta Independent on Sunday – 18 June 2017

The airport and its neighbours

3D aerial view of scheme.MIA 2015

 

Earlier this week, the management of Malta’s International Airport announced a €78 million investment programme, aimed at enlarging the terminal buildings, improving and upgrading existing facilities for the handling of passengers and  further developing a business hub.

The airport terminal at Gudja is Malta’s only such facility and so, to a certain extent, the further development of the existing capacity to handle the arrival and departure of passengers is essential. And yet, due to the limitations of size, the proximity of Gudja’s airport to the surrounding villages of Luqa, Gudja, Kirkop and Safi has to be borne in mind. Size limitations signify that even essential works will have an impact on the surrounding communities and thus have to be thought out carefully.

Its been over five years since MEPA has received a planning application for the consideration of an updated master-plan for Malta International Airport. PA5548/10 was submitted in November 2010. A previous version of the master-plan was approved in 1997 (PA5681/96) while another version, submitted in 2003 (PA5306/03), was withdrawn.

The latest proposed master-plan currently under consideration by MEPA includes provision for the enlargement of the terminal building to include additional facilities to handle passenger traffic as well as the construction of five new buildings for a range of commercial and leisure activities.

The proposed masterplan and the environmental planning statement (EPS) published late in 2014 for public consultation focus on the proposed business hub and emphasise that the well-established trend for international airports is to expand to “include ancillary business and retail facilities.”

The masterplan was fed by two studies commissioned by the Malta International Airport. The first – carried out by Locum Consulting – studied the office market in Malta and apparently concluded that the “high quality office stock supply” is limited in comparison to the existing demand.  An audit of the proposed masterplan was also carried out by Eriksson + Partner GmbH.

The EPS contains selective quotes from these two reports, but the reports themselves have not been made public. Both MEPA and MIA have resisted requests to publish these reports as they consider that they are commercial reports and do not contain information on environmental impact.

Malta’s only airport has its requirements. In particular, it needs to cater for the increasing number of passengers it handles. This year, the number of passengers handled has recently surpassed the 4.5 million mark. It will undoubtedly continue to rise and it stands to reason that the passenger-handling facilties, currently bursting at the seams, need to be upgraded.

What number of passengers is being planned for? What are the forecasts ? This information is not available as part of the documentation which has been published to date.

The inevitable increase in the number of passengers to be handled by MIA will have an impact on the surrounding area. The traffic generated, and the  emissions associated with this, will further deteriorate the air quality in the main roads leading to Gudja. There will also be an increase in noise pollution.

The Environment Planning Statement identified the Ħal-Farruġ Road/Qormi Road roundabout at Luqa as requiring upgrading  as a result of long-term traffic projections made. It did not, however, identify any other major traffic impact on the villages surrounding the airport. In particular, the EPS did not consider it relevant to consider that already, at this point in time, the residential area of Gudja – less than 50 metres away from the boundary of the airport carpark –  is being used by airport employees and passengers as an additional carpark, thereby creating an unnecessary burden on Gudja itself.

The current burden for the airport’s core functions, and the first phase of the Skyparks project, are primarily being borne by the communities of Luqa, Gudja, Kirkop and Safi.

Additional impact due to an increase in the airport’s core functions is unavoidable. But making matters worse through further development of the airport as a business hub is verging on sadistic. Gudja’s airport should not be compared to major airports when determining long-term functions, but rather to regional airports.

Given Malta’s size, practically all facilities are available within a 15-minute drive from the airport. It would hence make sense for the airport’s management to realise that the airport’s corporate social responsibility should not be limited to funding some restoration projects. It is about time that it focused on the fact that human beings reside in the surrounding villages. The airport’s contribution to Malta’s economic performance is welcome but this should not be at the expense of the quality of life of the surrounding communities.

published in The Malta Independent on Sunday, 27 December 2015