After the agricultural fair has ended

The onslaught on agricultural land is continuous. It is unfortunately many a time abated by land use planning operatives. It would be an understatement to emphasise that they should know better.

Among the countless examples faced on a continuous basis I can list the following: the over-development of road infrastructure, quarries, boatyards, solar farms and fireworks factories proposed in rural areas and in lieu of agricultural land. Added to these examples one can add the craze of changing the use of agricultural land into picnic or barbeque areas. This creation of recreational areas is squeezing out agriculture! All this would not happen without the complicity of the Planning Authority and those appointed to lead it.

The agricultural fair organised last week exposed another aspect: the anguish of the farming community. A discussion organised within the precincts of the grounds of the agricultural fair focused on food security. The spiralling cost of imported animal feed fuelled by the Russian invasion of Ukraine as well as international business pressures are adding to the problems of those involved in animal husbandry.

Farmers are being pushed out of the land they have been tilling at an increasing rate. No one in his right senses would dare invest in the modernisation of an agricultural holding in such a climate. The banks, on the other hand, emphasised the farmers who took part in the discussion, are not forthcoming with loans to facilitate matters, most probably as they consider the risks involved too high.

In the meantime, eviction of farmers from the land they have tilled for generations continues unabated as government takes too long to come up with a reform of the agricultural lease legal setup.

Government has, for all intents and purposes, abandoned the agricultural community. In addition, it has repeatedly carved agricultural land into new or widened roads. The irrigated agricultural land at Attard had to make way for the so-called Central Link. Shortly more agricultural land on the outskirts of  Qormi will make way for improvements to the Mrieħel bypass project.  Add this to the planned havoc continuously emanating from the Planning Authority and you can easily understand what the agricultural community has to bear.

It is indeed ironic that a government which boasts of a programme which is intended to create more open spaces is at the same time determined to ruin more natural open spaces on the outskirts of our towns and villages.

It is clear that government has taken a basic political decision: cars have a priority over agriculture. This decision is clearly manifested in the manner of operation of Infrastructure Malta which is gobbling up extensive agricultural land which stands in the way of its projects. It is further manifested in the absolute silence of the Agricultural Ministry when it is faced with this behaviour. The agricultural minister is apparently more interested in our heritage which leaves him little time to focus on the needs of agriculture and the farmers who depend on it for their livelihood.

Given the ever-increasing population on these islands it was always very clear that local agriculture could never, on its own, suffice to cater for our needs. Supplementing local agricultural produce with imported produce should be done with care as there is always a danger that the local market can be flooded with low priced goods which make the life of our farmers more miserable than it already is!

The organisation of the agricultural fair was a good idea. It must however be supplemented with a heavy dose of good faith which is missing in the attitudes of the holders of political office in the Ministry of Agriculture through the rest of the year, that is when there is no agricultural fair!

published on the Malta Independent on Sunday : 29 May 2022

Il-karozzi iddominaw ħajjitna

Hi sfortuna li tul is-snin ħallejna ħajjitna tkun iddominata mill-karozzi.

Għaddejna minn kontroversja wara l-oħra dwar l-infrastruttura tat-toroq. Sfortunatament jidher li minn dan kollu l-awtoritajiet għadhom ma tgħallmu xejn.  L-aħħar każ hu dwar il-proposta għal fly-over ġdida għall-Imrieħel: fly-over oħra li mhiex meħtiega.

Il-proposta tal-Imrieħel għadha qed tkun imfassla. Ma hemmx wisq dettalji li huma magħrufa, s’issa, ħlief li probabbilment ser ikun hemm impatt sostanzjali fuq madwar 20 tomna ta’ raba’ saqwi. Minn dak li hu magħruf s’issa  Infrastruttura Malta bdiet tiltaqa’ mal-bdiewa dwar dak li eventwalment ser ikun propost.

Mhux meħtieġ li nkunu nafu d-dettalji ta’ dak li hu ppjanat, kif qed jgħid il-Ministru għat-Transport Ian Borg, biex nikkritikaw il-programm tal-Gvern dwar l-infrastruttura tat-toroq għax dan hu oġġezzjonabbli fil-prinċipju.  

M’għandiex bżonn iktar toroq. Imma għandna bżonn inqas karozzi fit-toroq li għandna.  Tnaqqis ta’ karozzi mit-toroq jwassal għal tnaqqis fil-konġestjoni tat-traffiku u titjib fil-kwalità tal-ħajja, inkluż iktar sigurtà fit-toroq tagħna għal kulħadd.

It-toroq tagħna mballati bil-karozzi. Għal din ir-raġuni l-Gvern qabbad esperti bex jistudjaw il-problema. Bħala riżultat ta’ dan, bl-għajnuna ta’ fondi għall-iżvilupp reġjonali tal-Unjoni Ewropea tfassal Pjan Nazzjonali għat-Trasport (Masterplan) minn konsulenti barranin. Il-Kabinett approva dan il-pjan fl-2016, imma kontinwament qiegħed jonqos milli jassigura li dan ikun implimentat.

Waħda mill-osservazzjonijiet bażiċi ta’ dan il-Pjan Nazzjonali għat-Trasport hi li nofs il-vjaġġi bil-karozzi privati jdumu inqas minn 15-il minuta, jiġifieri huma vjaġġi għal distanzi qosra. Bla ebda dubju hemm bosta mezzi sostenibbli li jservu għal mobilità alternattiva: il-karozzi privati bla ebda dubju nistgħu ngħaddu mingħajrhom għal dawn id-distanzi qosra, fil-parti l-kbira tal-każi.

Il-Pjan Nazzjonali għat-Trasport iwissina dwar in-nuqqas f’Malta tal-ippjanar għat-trasport: ippjanar li jħares sal-ponta ta’ mnieħru għax ma jħarisx fit-tul.  Bħala konsegwenza ta’ dan  ftit li xejn jeżistu miri ċari, hemm nuqqas  ta’ direzzjoni strateġika kif ukoll nuqqas ta’ kapaċità li jkunu ndirizzati materji diffiċli bħat-tnaqqis ta’ karozzi mit-toroq. Il-Maltin huma konservattivi wisq, jgħid il-pjan (There is a strong reluctance for Maltese society to change) u dan f’kuntrast mal-ħtieġa għal azzjoni fil-komunità biex tkun indirizzata l-problema tat-traffiku, kemm kif inhi illum kif ukoll kif għad tista’ tiżviluppa.  Dan, ikompli jgħid il-pjan tat-trasport approvat mill-Kabinett, iwassal biex is-sewwieq Malti jippretendi li kulħadd għandu jaddatta l-mod kif jivvjaġġa biex hu jkun jista’ jibqa’ jsuq il-karozza tiegħu! (This results in the Maltese traveller expecting that everyone else will change their travel habits so that they can continue to drive their car.)

Il-politika dwar it-trasport ma jistax ikun li tibqa’ ippjanat biċċa biċċa, mil-lum għal għada. Jeħtieġ ippjanjar olistiku. Dan hu l-iskop li sar dan il-Masterplan: biex ikollna pjan olistiku u nibdew inħarsu fit-tul. Biex pjan bħal dan ikun implimentat, imma, hemm bżonn deċiżjonijiet iebsin li għandhom iwasslu għal tnaqqis fin-numru esaġerat ta’ karozzi privati li hawn fit-toroq tagħna.  

Il-problema reali li qed iżżomm l-implimentazzjoni ta’ dan il-pjan hi li l-Gvern m’għandux il-kuraġġ li jieħu dawn id-deċiżjonijiet. Ma jridx jirfes kallijiet!  

Irridu nifhmu darba għal dejjem li ċ-ċokon ta’ pajjiżna jagħmilha possibli li permezz ta’ transport pubbliku organizzat sewwa nilħqu kull rokna tal-pajjiż f’ħin qasir.

It-trasport pubbliku f’Malta għamel progress kbir f’dawn l-aħħar snin, imma dan mhux biżżejjed. Għax it-trasport pubbliku ma jistax jikkompeti ma’ Gvern li kontinwament  jinkoraġixxi l-użu tal-karozza privata b’toroq ġodda u flyovers li flok jirrestrinġu iż-żieda tat-traffiku fit-toroq tagħna jagħmluh iktar faċli.

Għal żmien twil, Gvern wara l-ieħor kien skjav tal-karozza. Il-politika tat-trasport kienet u għada politika favur il-karozzi li jikkundizzjonawlna ħajjitna. Hu dan li għandu jinbidel.

Jeħtieġ li l-politika tat-trasport tpoġġi lin-nies l-ewwel, qabel il-karozzi.

Ippubblikat fuq Illum : 27 ta’ Diċembru 2020

King of the Road

It is indeed unfortunate that over the years we have allowed the car to control our lives.

We have gone through too many controversies related to road infrastructure. Unfortunately the authorities have not learnt anything in the process. The latest case being the proposed Imrieħel bypass improvements through the construction of yet another unnecessary fly-over.

The proposed bypass improvements apparently are still on the drawing board. No details on the proposals are available except that most probably there will be a considerable impact on irrigated agricultural land, measuring around 20 tumoli, that is approximately 22,500 square metres. From what is known, recently, Infrastructure Malta has sounded farmers which may be impacted by the proposals.

Contrary to what has been stated by Minister for Transport Ian Borg, criticism of government’s road infrastructure programme does not require details as it is objectionable on a point of principle. We do not require more roads, but rather less cars on the roads. Such a reduction of cars from our roads would reduce traffic congestion as well as have a marked improvement in everyone’s quality of life, inclusive of an increased safety for all.

Our roads are currently bursting at the seams. Government has commissioned studies to study the matter. As a result, a Transport Masterplan has been produced by foreign consultants paid through EU Regional Development Funds. Cabinet has approved this Masterplan in 2016, yet it has repeatedly failed to ensure its implementation.

One of the basic observations in the said Transport Masterplan is that 50 per cent of the trips we make with private cars are for distances taking less than 15 minutes, meaning that such trips are local in nature. We can easily be served with more sustainable options to address this basic observation: use of private cars is certainly not one of them.  

The Transport Masterplan admonishes us as follows: “………… it can be seen from experience that the approach to transport planning and policy in Malta has generally been more short-term (4-5 years) in nature. The lack of importance given to long-term planning means that a long-term integrated plan based on solid analysis with clear objectives and targets is lacking. This has resulted in the lack of strategic direction and the inherent inability to address difficult issues such as private vehicle restraint. There is a strong reluctance for Maltese society to change but this is in contrast with the need for communal actions to address the traffic problems existing now and in the future. This results in the Maltese traveller expecting that everyone else will change their travel habits so that they can continue to drive their car.”

Transport policy needs to be looked at holistically and not in a piecemeal fashion. That is the purpose of the Masterplan: to take a holistic view and lay out a long-term roadmap. Obviously to implement such a roadmap tough decision-taking is involved which would reduce and restrict can ownership. The real problem of Transport Policy implementation is that government does not have the balls to take such tough decisions.

The point to be addressed is that the relative smallness of our country makes practically every corner of the islands within easy reach even through public transport if this is organised properly.

Public Transport in Malta has made gigantic steps forward, but these are not sufficient. Public transport cannot compete with a government which is continuously encouraging the use of private transport and making it continuously easier through massive funds made available for unnecessary flyovers and underpasses!

Government is continuously mishandling transport policy. It is about time that it is placed back on track.

It has been government policy for more than the past twenty-five years that the car rules over our roads. We should change that. We need to reclaim ownership of our roads (and streets) placing more emphasis on the needs of the pedestrian who should be the real king of the road.

Published in The Malta Independent on Sunday : 27 December 2020

Infrastruttura Malta qed tinjora l-unika soluzzjoni

Għadhom kif ġew ippubblikati l-istudji li jiffurmaw parti mill-EIA (Environmental Impact Assessment) dwar il-proġett infrastrutturali tat-toroq bejn l-Imrieħel u Ħ’Attard : is-Central Link Project. Il-konsultazzjoni pubblika ser tibqa’ għaddejja sal-21 ta’ Frar 2019.

L-istudji ippubblikati huma voluminużi. Apparti r-rapport finali miktub mill-koordinatur tal-EIA b’543 paġna hemm 11-il rapport tekniku dwar temi ta’ relevanza. Dawn ivarjaw mill-użu tal-art, il-pajsaġġ u l-impatti viżivi, il-ġeoloġija, l-ilma, l-ekoloġija, l-agrikultura, l-arkejoloġija, l-kwalità tal-arja, il-ħsejjes, l-infrastruttura u s-servizzi u l-aċċess pubbliku.

Dawn ir-rapporti nkitbu bejn Awwissu 2015 u Jannar 2019 u fihom madwar 1400 paġna. Fiż-żmien qasir li ilhom aċċessibli ma kienx possibli li jinqraw kollha. Imma, l-posizzjoni li qed tieħu Infrastruttura Malta, bla ebda dubju a bażi ta’ direzzjoni politika, hi waħda ċara ħafna.

Infrastruttura Malta qed tipproponi li tindirizza l-konġestjoni tat-traffiku fit-toroq tagħna bil-bini jew twessiegħ ta’ toroq flmkien mat-titjib ġenerali tal-infrastruttura tagħhom. B’dan il-mod, jidhrilha li l-konġestjoni tkun eliminata inkella tonqos drastikament. Dan għandu jwassal għal inqas emissjonijiet u allura titjieb il-kwalità tal-arja, jonqos il-ħin li jintilef tistenna fit-traffiku u allura jonqos ukoll il-konsum tal-petrol u d-dijsil li jinħela bil-karozzi weqfin jistennew.

Fil-Kapitlu 3 tar-rapport finali miktub mill-koordinatur tal-EIA hemm eżami tal-alternattivi għall-proġett ta’ toroq propost. Hemm sitt alternattivi li huma kkunsidrati. Dawn ivarjaw milli ma tagħmel xejn għal numru ta’ soluzzjonijiet infrastrutturali differenti. (ara paġna 66 tar-rapport)

Fir-rapport tiegħu l-koordinatur tal-EIA injora waħda mill-iktar miri ċari tal-Pjan Nazzjonali tat-Trasport 2025: it-tnaqqis tal-karozzi mit-toroq. Meta kien approvat dan il-pjan nazzjonali stabilixxa numru ta’ miri operattivi. Il-mira 2.2.2 tistabilixxi l-ħtieġa ta’ alternattivi għall-karozzi privati biex tkun inkoraġġuta mobilità sostenibbli u tnaqqas il-karozzi miz-żoni fejn hemm il-konġestjoni. (Provide alternatives to private vehicles to encourage sustainable travel patterns and reduce private vehicular demand in the congested hub area). Il-pjan jispjega li dan l-oġġettiv kien identifikat li madwar ħamsin fil-mija tal-vjaġġi li jsiru b’karozzi privati jdumu inqas minn kwarta, liema fatt juri li dawn huma fuq distanzi qosra ħafna (ara paġna 95 tal-pjan).

L-EIA li Infrastruttura Malta tippreżenta għall-konsultazzjoni pubblika jonqos milli jikkunsidra l-implimentazzjoni ta’ dan il-mira fost l-alternattivi differenti kkunsidrati bħala soluzzjonijiet possibli għall-konġestjoni tat-traffiku. Probabbilment li Infrastruttura Malta qed tiffaċċja nuqqas ta’ rieda politika biex tittieħed azzjoni. Xi ħadd jeħtieġ li jispjega għaliex din l-għodda qed tkun skartata daqshekk malajr wara li ddaħlet tifforma parti mill-pjan tat-trasport.

Iktar kmieni dan ix-xahar konna nfurmati b’żieda sostanzjali fl-użu tat-trasport pubbliku matul l-2018. Kien rappurtat li kien hemm 53.4 miljun passiġġier li għamlu użu mit-trasport pubbliku fl-2018. Żieda ta’ 11.25% fuq l-2017. Hu ċar li l-pubbliku qed jirrispondi billi jagħmel użu mit-trasport sostenibbli offrut għall-użu tiegħu.

Transport Malta teħtieġ li taġixxi mingħajr iktar dewmien. Hemm ħtieġa ta’ pjan ċar biex tkun implimentata l-mira tat-tnaqqis tal-karozzi mit-toroq tagħna. Din hi l-iktar soluzzjoni li tagħmel sens għax hi soluzzjoni li tħares fit-tul. Meta dan il-pjan ikun stabilit, imbagħad ikun possibli li l-proġett Central Link ikun ikkunsudrat mill-ġdid f’kuntrast ma alternattiva realistika.

Sfortunatament il-Gvern naqas milli jifhem li diġa kellu f’idejh is-soluzzjoni għall-problema tal-konġestjoni tat-traffika. Soluzzjoni li tindirizza l-kawza (il-karozzi) flok ma tindirizza l-effett.

Huwa nuqqas kbir li l-EIA jonqos milli jqis dan kollu. Għax l-EIA suppost li hu proċess ta’ eżami indipendenti tas-soluzzjonijiet għall-problemi li ser ikunu indirizzati. Jeħtieġ li dan in-nuqqas ikun indirizzat immedjatament.

 

Ippubblikat fuq Illum : Il-Ħadd 20 ta’ Jannar 2019

 

 

 

 

Infrastructure Malta is missing the real alternative

The studies forming part of the Environmental Impact Assessment (EIA) on the Central Link project dealing with the road infrastructure between Mrieħel and Attard has just been published. Public consultation runs up to 21 February 2019.

The studies published are voluminous. In addition to the coordinated assessment report – running into 543 pages – there are 11 technical reports dealing with various issues of considerable relevance. They deal with land cover and uses, landscape character and visual amenities, geology, water, ecology, agriculture, archaeology, air quality, noise, infrastructure and utilities and public access.

The reports dated between August 2015 and January 2019 run into approximately 1400 pages. In the limited time for which all the different reports have been available, it has not yet been possible to read through them.

Notwithstanding, the general approach of Infrastructure Malta – undoubtedly as a result of Ministerial direction – is very clear. It is proposed by Infrastructure Malta to alleviate the various bottlenecks on our roads, and the resulting traffic congestion, through the construction of new roads, the widening of existing ones and the upgrading of junctions. It is envisaged that, as a result of doing away with bottlenecks, the level of emissions will be reduced, thereby improving air quality, the time lost in traffic will be eliminated as well as the over-consumption of fuel, resulting in savings in both the fuel used and the emissions generated.

Chapter 3 of the coordinated assessment examines and assesses alternatives to the proposal under consideration. Six alternatives are considered, ranging from a do-nothing option to a number of specific infrastructural solutions, including a combination of such solutions (see page 66 of the coordinated assessment).

The coordinated assessment ignores one clear and specific objective of the National Transport Master-Plan 2025, that is a reduction in the number of cars on our roads. Approved in 2016, this master plan establishes a number of operational objectives for the implementation of transport policy. Objective 2.2.2 establishes the following: “Provide alternatives to private vehicles to encourage sustainable travel patterns and reduce private vehicular demand in the congested hub area”. The master plan explains that “this objective has been developed since the data shows that about 50 per cent of trips are under 15 minutes, illustrating that mobility is produced at a local level on very short paths.” (see page 95 of Master Plan)

The EIA presented by Infrastructure Malta for public consultation fails to consider the implementation of this objective among the various alternatives that can be used to address traffic congestion. It is possible that Infrastructure Malta is facing a brick wall due to a lack of political will to implement this objective. Someone needs to explain why this policy route is being discarded so soon after it being included into the Master Plan.

Earlier this month, we were informed about the substantial increase in the patronage of public transport. It was reported that during 2018, 53.4 million people had used public transport: an increase of 11.25% over 2017. It is clear that the public is responding through the uptake of the sustainable transport options being made available.

Transport Malta needs to stop procrastinating and take the bull by the horns. A road map for implementing the objective of reducing the number of cars from our roads is the only sensible way forward. It is the long-term view which is missing in our transport policy. Once this road map is clearly defined, then it would be easier to reassess – and probably substantially redefine and downscale – the Central Link project on the basis of a realistic alternative.

The government has, unfortunately, failed to appreciate that it has already identified policy tools with which to tackle traffic congestion. It had a solution in hand which targeted the cause of the problem: cars.

That the EIA also fails to assess this alternative is a significant flaw in the process, as this assessment should be an independent examination of the possible solutions to the identified problem. It needs to be addressed forthwith.

published in The Malta Independent on Sunday : 20 January 2019

Marsa: a planning mess

turkish-cemetry-marsa-malta2

The Chamber of Architects has taken the Planning Authority to task on the piecemeal local plan reviews that it has been churning out, one at a time. The latest tirade was with reference to a partial review of The Grand Harbour Local Plan (originally published in 2002) specifically with respect to a Marsa Park Site.

We have just concluded a public discussion on a Masterplan for Paceville, which was shredded by public opinion and sent back to the drawing board.

Earlier, we had the Planning Authority itself contesting whether Local Councils, NGOs and the Environment and Resources Authority  had a right to contest the decision to permit high-rises in Townsquare Sliema and in Imrieħel.

To make matters worse, instead of consolidating the environmental regulatory functions of the state, this government has opted to deliberately fragment them, thereby ensuring their reduced effectiveness by design.  In a small country such as Malta, it pays to have one consolidated authority  directed by environment professionals through whom land use planning responsibilities should be accountable.

Land use planning needs to be more focused but holistic in nature. The Chamber of Architects aptly makes the point that focusing the efforts of the partial review of the Grand Harbour Local Plan specifically on “a Marsa Business Park” without considering this within the context  of a much needed regeneration of Marsa would be a futile exercise. The decay of Marsa as an urban centre needs to be addressed at the earliest opportunity and this will not be done through piecemeal local plan reviews but through comprehensive planning “which ought to include community needs, road transport re-alignment, environment improvement and flooding mitigation measures”.

These are the basic issues which should be addressed by a local plan review concerning Marsa. Tackling major infrastructural and social problems facing the Marsa community should take precedence over any proposal for the redevelopment of the Marsa Park site. It is the whole of Marsa that should be addressed and not just one tiny corner.

The partial local plan review is ignoring the local community, just like its cousin the Paceville Masterplan did some months ago. Many years ago we learned that “planning is for people”. This seems to be no longer the case as, according to the Planning Authority, planning is apparently for business hubs, high-rises and, obviously, for developers. They seem to be very well connected, thereby ensuring that they occupy the first items of this government’s land use planning agenda.

Marsa has been forgotten over the years. With the closure of the Marsa power station now is the appropriate time to consider the various accumulated impacts on the Marsa community in order that an integrated approach to addressing them is identified. Planning is for people. That means that the Marsa community should be actively involved when these plans are being formulated, including at the drawing board stage. Land use planners should stimulate the Marsa community to speak up and involve itself in drawing up a blue print for its future.

The regeneration of Marsa is an urgent matter which should not be left unattended.

published in The Malta Independent on Sunday : 15 January 2017

The financing of Fawlty Towers

Townsquare.Fawlty Tower

The saga of the Mrieħel and the Townsquare towers is now entering a new phase, with the planning appeal stopwatch due to start ticking shortly –  most probably towards the end of the month. It is known that, so far, Sliema Local Council and a number of environmental NGOs will be appealing against the 4 August decision of the Planning Authority to approve the “Fawlty Towers” at Mrieħel and Townsquare Sliema .

Financing of the projects is next. The banks cannot increase their already substantial exposure to loans that are dependent on building speculation. Consequently, the developers will inevitably have to seek the involvement of private citizens and, possibly, institutional investors. Most probably, the process for financing the projects has already commenced; it will involve the issuing of bonds to the public and will normally be sponsored by a bank and a stock-broking agency.

The bank or banks and stockbrokers sponsoring the bond issue will have to ensure that the bonds are subject to an “appropriateness and suitability testing” subject to such direction as the Malta Financial Services Authority  may consider necessary and suitable. Also, in the light of past local unpleasant experiences, the Authority will undoubtedly be guided by the need to ensure  that prospective investors fully understand the inherent risks of the proposed investments.  It will also ensure that detailed information is published in the form of a suitable prospectus in which the small print is both legible and understandable.

Those who finance the high-rise projects should shoulder responsibility for their impact together with the Planning Authority and the developers. They will potentially make it happen, so they should carry the can. It is important to get this message through: those who will invest in the Gasan and Tumas bonds intended to finance the “Fawlty  Towers”  should receive more than a monetary return on their investment. The moment they sign up they will also assume co-responsibility – with the developers, the Planning Authority, the bank or banks and the sponsoring stockbrokers – for this projected development .

Word is going around on the need to boycott the services and products placed on the market by the Gasan and Tumas Groups. Journalist Jürgen Balzan, writing in Malta Today described these services and products as being wide-ranging (hotels, car-dealerships, gaming, finance and property) which easily impact on the daily life of a substantial number of Maltese citizens. However, such a boycott’s only link with  the “Fawlty  Towers”  would be through the owners.  It would be preferable for a boycott to have a direct link with the offensive action.  In this context, the forthcoming bond issue to finance the “Fawlty  Towers”  presents itself as a suitable opportunity.

A boycott is a non-violent instrument of protest that is perfectly legitimate in a democratic society. The boycotting of the forthcoming bond issue would send a clear message that people will not be complicit in further ruining the  urban fabric of Sliema and ensure that development at Imrieħel is such that the historic landscape is fully respected.

A social impact assessment, if properly carried out, would have revealed the apprehensions of the residents in particular the residents on the Tignè peninsula. But, unfortunately, as stated by Sliema Green Local Councillor Michael Briguglio, the existing policy-making process tends to consider such studies as an irritant rather than as a tool for holistic management and community participation.

We have had some recent converts on the desirability of social impact assessments, such as Professor Alex Torpiano, Dean of the Faculty for the Built Environment at the University of Malta. Prof. Torpiano, in an opinion piece published by the Malta Independent this week, stressed that spatial planning in Malta needs a social-economic dimension. Unfortunately, I do not recollect the professor himself practising these beliefs as the leading architect in the MIDI and Cambridge projects on the Tignè peninsula,  a stone’s throw from Townsquare!

Investing in this bond issue is not another private decision: it will have an enormous impact on the community.

Responsibility for this ever-increasing environmental mess has to be shouldered by quite a few persons in Malta. Even the banks have a very basic responsibility – and not one to be shouldered just by the Directors: the shareholders should also take an interest before decisions are taken and not post-factum.

I understand that the Directors of APS Bank have already taken note of the recent  statements regarding the environment by  Archbishop Charles Scicluna. As such, it stands to reason that APS will (I hope) not be in any way associated with the financing process for the “Fawlty  Towers”.  However, there is no news as yet from the other banks, primarily from the major ones – ie Bank of Valletta and HSBC.

This is a defining moment in environmental action in Malta. It is time for those that matter to stand up to be counted – and the sooner the better.

published by the Malta Independent on Sunday – 21 August 2016

Boycott ta’ Gasan u Tumas? X’inhi l-mira?

target1

 

L-iskop ta’ Martin Scicluna u Edward Mallia li jħeġġu boycott tas-servizzi u prodotti li joffru l-kumpaniji fil-gruppi ta’ Gasan u Tumas għandu intenzjonijiet tajba.  Imma l-boycott avolja għandu l-merti tiegħu hu arma qadima u biex ikun effettiv irid jitħaddem sewwa fuq tul ta’ żmien.

Hu iktar għaqli li l-familja ambjentalista tpoġġi fil-mira l-proċess tal-finanzjament tal-proġetti nfushom.

Fil-mira għandu jkun hemm il-bonds li jridu jinħarġu, il-bank u l-istockbroker li jieħdu ħsieb is-sejħa għax-xiri tal-bonds.

Azzjoni ta’ din ix-xorta tista’ tkun iktar effettiva għax l-impatt tagħha ikun direttament relatat għall-proġetti tat-torrijiet tal-Imrieħel u Townsquare infushom.

Il-klijenti ta’ Victor Axiak u Timothy Gambin

Delimara EIA contents

 

Fl-artiklu tagħha tal-bieraħ il-Ħadd fuq is-Sunday Times intitolat Of hats and despicability, Claire Bonello identifikat problema oħra kbira konnessa mal-proċess tal-permessi tat-torrijiet tal-Imrieħel u Tas-Sliema (Townsquare).

Victor Axiak u Timothy Gambin fil-passat riċenti kellhom fost il-klijenti tagħhom lill-gruppi ta’ Gasan u ta’ Tumas li jiffurmaw parti mill-konsortium li twaqqaf għall-Power Station tal-Gass f’Delimara. Għalihom Victor Axiak u Timothy Gambin għamlu xogħol li kien jikkonsisti fi studji dwar impatti ambjentali ta’ dak il-proġett. Axiak dwar l-ekoloġija marittima u Gambin dwar l-arkejoloġija marittima. Ir-ritratt ta’ hawn fuq juri paġna mir-rapport tal-EIA dwar il-power station li taħdem bil-gass f’Delimara bl-ismijiet ta’ Axiak u Gambin u l-oqsma li rrappurtaw dwarhom.

Il-mistoqsija ċara hi jekk hux etiku li Axiak u Gambin jieħdu sehem f’laqgħat tal-Awtorità tal-Ippjanar li fihom jagħtu l-opinjoni u jiddeċiedu dwar applikazzjonijiet tal-klijenti tagħhom.

Axiak ma attendiex għal uħud mil-laqgħat. Imma la hu u l-anqas Gambin ma ħassew il-ħtieġa li jgħidu li għandhom xi konflitt ta’ interess. Din x’serjetà hi?

L-imġieba korretta mhiex qegħda għall-politiċi biss iżda ukoll għal kull min hu involut fit-teħid ta’ deċiżjonijiet.

The professor who messed things up

Victor Axiaq

 

Professor Victor Axiaq, Chairman of the Environment and Resources Authority, is not at fault for being absent at a Planning Authority public meeting on the 4 August which discussed the Mrieħel and Sliema high-rise applications. By now everyone is aware that he had just been discharged from hospital and was instructed to rest for 15 days.

There were various officers of the Environment and Resources Authority present for the 4 August public meeting, yet instead of entrusting one of them with presenting the environment’s case on the Sliema high-rise, Professor Axiaq preferred to entrust Dr Timothy Gambin with a memorandum which Gambin opted to keep to himself.

There were various environmentalists, Sliema Local Councillors and civil society activists present for the public hearing. Those of us who were present for the public hearing presented the environment case and managed to convince six out of 13 Planning Authority members to vote against the proposed high-rise at TownSquare Sliema. Support for the environment case from a representative of the Environment and Resources Authority during the public hearing would have been most welcome. It could also have had a determining impact.  Yet it was not forthcoming notwithstanding the presence of a number of the Environment and Resources Authority employees at the public hearing.

The split of MEPA into two separate and distinct authorities, we were irresponsibly told by Government representatives some months ago, would ensure that the environmental issues would be more easily defended when considering land use planning applications. Yet prior to the split, an official of The Environment Protection Directorate would have addressed the public hearing. On the 4 August none were invited. The only person who was briefed to speak (Dr Timothy Gambin) opted instead to ignore his brief and instead openly supported the development proposal for a high-rise at TownSquare.

Professor Victor Axiaq, as Chairman of the Environment and Resources Authority, missed the opportunity to contribute to convince the majority of members of the Planning Authority due to his two basic mistakes. He entrusted his memorandum to another Planning Authority member (Dr Timothy Gambin) who had opposing views and hence had no interest in communicating Professor Axiaq’s memorandum on TownSquare to the Planning Authority. Professor Axiaq also failed to engage with his own staff at the Environment and Resources Authority as none of those present for the public hearing uttered a single word in support of the case against the high-rise proposal. The person sitting on the chair next to me, for example, preferred to communicate continuously with his laptop correcting with track changes some report he was working on. I have no idea why he even bothered to be present for the public hearing.

Unfortunately, Professor Axiaq, as chairman of the Environment and Resources Authority, messed up the first opportunity at which the input of the authority he leads could have made a substantial difference in the actual decision taken. It would have been much better if a proper decision was taken on the 4 August instead of subsequently considering whether to present an appeal, as this will be an uphill struggle as anyone with experience in these matters can confirm.  This could only have happened if Professor Axiaq had acted appropriately, which he unfortunately did not.

Next Wednesday, the Sliema Local Council will be convened for an extraordinary session in order to discuss the planning appeal relative to the TownSquare high-rise development permit. Environmental NGOs will also be meeting presently to plot the way forward and consider whether they too will appeal the decision.

Even the Environment and Resources Authority will be shortly considering whether to appeal. In view of the way in which Professor Axiaq handled the whole issue, the Sliema Local Council and the environmental NGOs would do well if they do not place any trust in the Authority led by Professor Victor Axiaq. They will avoid ending up in another mess.

After creating this mess, there is only one option left for Professor Victor Axiaq in my opinion. He should immediately resign from his post as chairman of the Environment and Resources Authority. The sooner he resigns the better.

published in The Malta Independent on Sunday – 14 August 2016