L-ilma tax-xita: l-inkompetenza tal-awtoritajiet

Il-Ministru tal-Finanzi Edward Scicluna, fl-aħħar diskors tal-Baġit qalilna : “Il-Gvern huwa wkoll kommess li jkompli jaħdem biex jitnaqqas ir-riskju tal-għargħar f’pajjiżna. Għaldaqstant, se jsiru studji dettaljati sabiex jiġu żviluppati aktar miżuri li jistgħu jnaqqsu dan ir-riskju filwaqt li jimmassimizzaw l-użu tal-ilma tax-xita.”

Edward Scicluna bla dubju jaf li bħala riżultat tat-tibdil fil-klima l-maltempati kif ukoll ix-xita qed ikunu ta’ natura iktar intensivi. Meta tinżel ix-xita, b’mod partikolari meta tkun qawwija, l-infrastruttura tagħna ma tistax tlaħħaq. Imma minbarra l-impatti kkawżati mill-klima għandna fuqna ukoll il-piz u r-riskji kkawżati minn regolaturi nkompetenti.

F’Malta għal dawn l-aħħar 138 sena, il-liġi pprovdiet biex ikun hemm l-obbligu li jkollna l-bjar għall-ilma tax-xita fid-djar. Il-qisien tal-bjar varja tul is-snin. Originalment il-qies kien dipendenti fuq il-qies total tas-sulari kollha mibnija. Illum il-ġurnata dan tnaqqas biex ikun relatat mal-qies tal-art mibnija.

Sfortunatament dawn ir-regoli ftit huma osservati. Din mhiex storja li bdiet illum, ilha għaddejja snin twal possibilment sa mis-snin 60, żmien meta l-industrija tal-bini kienet għaddejja b’rankatura kbira. Jiena niftakar, meta kont għadni student, ftit snin ilu mhux ħażin, kont rajt rapport li kien tħejja għall-Gvern Malti minn esperti mibgħuta mill-Ġnus Magħquda. Dakinnhar diġa kien ċar li waqt u wara maltempati qawwija l-ilma għaddej mis-sistema tad-drenaġġ kien jiżdied b’mod astronomiku u dan billi ħafna ilma tax-xita flok ma jinġabar fil-bjar kien qed jintrema fid-drenaġġ. Is-sitwazzjoni, minn dakinnhar, marret ħafna għall-agħar!

Flok mal-ilma tax-xita jinġabar fil-bjar, f’ħafna każi qed jintrema fit-toroq, inkella direttament fis-sistema tad-drenaġġ pubbliku. Ammont enormi ta’ ilma tax-xita li nistgħu nutilizzaw qed jintrema. Ħafna, jekk jużaw l-ilma tax-xita jistgħu jnaqqsu b’mod drastiku l-kontijiet tal-ilma!

Meta l-ilma tax-xita jintrema fid-drenaġġ, dan mhux biss ifur fit-toroq tagħna imma minħabba li jgħabbi l-impjant tal-purifikazzjoni tad-drenaġġ b’ammont zejjed ta’ ilma iżid b’mod konsiderevoli l-ispejjes għat tmexxija tal-impjant.

Il-parti l-kbira tal-ħtija għal dan trid tinġarr minn dawk li jiżviluppaw il-propjetá. Anke l-Gvern, direttament, kif ukoll permezz tal-aġenziji tiegħu, fil-passat riċenti kien responsabbli għall-iżvilupp ta’ housing estates li fihom ma tinġabarx qatra ilma tax-xita!
Hu fatt magħruf li fejn żvilupp residenzjali jkun fih garaxxijiet parzjalment jew kompletament taħt il-livell tat-triq ftit għandna bjar għall-ilma tax-xita. L-Awtoritá tal-Ippjanar hi responsabbli biex tassigura li l-kundizzjonijiet tal-permessi tal-iżvilupp ikunu osservati: dawn kważi dejjem jinkludu l-obbligu li jinbena bir biex fih jinġabar l-ilma tax-xita. Imma ħafna drabi, għall-Awtoritá tal-Ippjanar, qiesu ma ġara xejn jekk il-bir ippjanat jibqa’ fuq il-karta.

Min-naħa l-oħra, l-Korporazzjoni għas-Servizzi tal-Ilma (WSC) matul dawn l-aħħar snin assumiet ir-responsabbiltá għas-sistema kollha tad-drenaġġ, liema responsabbiltá qabel kienet f’idejn id-Dipartiment tad-Drenaġġ. Din ir-responsabbiltá tinkludi l-għoti tal-permess biex bini ġdid jiġi imqabbad mas-sistema tad-drenaġġ.

Il-Korporazzjoni għas-Servizzi tal-Ilma x’verifiki qed tagħmel li l-katusi tad-drenaġġ biss qed jitqabbdu mas-sistema pubblika tad-drenaġġ? Qed isiru verifiki li m’hemmx katusi tal-ilma tax-xita ukoll? It-tweġiba teħduha waħedkom fit-toroq tagħna f’ġurnata ta’ xita qliel. Ħadd mhu jagħmel verifika dwar dak li qed jiġri.

Dan kollu jwassal għall-konklużjoni li waqt li l-ħtija ewlenija għall-qagħda preżenti hi tal-industrija tal-bini, għax, iktar le milli iva ma tipprovdix bjar għall-ilma tax-xita fi żvilupp ġdid, il-ħtija mhiex tagħha biss. L-awtoritajiet u d-dipartimenti tal-Gvern għandhom ukoll iġorru s-sehem tagħhom tar-responsabbiltá minħabba li ma onorawx l-obbligi regolatorji tagħhom. L-Awtoritá tal-Ippjanar u l-Korporazzjoni għas-Servizzi tal-Ilma (u dawk li ġew qabilhom) setgħu waqqfu dan l-abbuz, imma ma għamlu xejn.

Meta jkollna xita qliel, jew xita għal ħin twil, diffiċli tgħaddi minn ċertu toroq f’Malta u Għawdex. Dan hu sors ta’ periklu u fil-fatt id-Dipartiment tal-Protezzjoni Ċivili ikun okkupat ħafna f’dawn iż-żminijiet jgħin lil min ikun f’diffikulta minħabba l-għargħar.
Fondi tal-Unjoni Ewropea ntużaw biex jiġu ffinanzjati mini taħt l-art biex l-ilma tax-xita fit-toroq jinġabar u jintrema l-baħar. Fondi pubbliċi intużaw biex jinħbew irregolaritajiet li sar mis-settur privat. Mhux biss, imma ntużaw ukoll biex riżors prezzjuż jintrema. Dawn il-fondi setgħu intużaw ferm aħjar kieku intużaw biex l-ilma inġabar u nħażen fl-ibliet u l-irħula tagħna, flok ma ntrema.

Il-parir tiegħi lil Edward Scicluna hu li, flok ma jinħlew iktar fondi pubbliċi, għandu jassigura ruħu li l-Awtoritá tal-Ippjanar u l-Korporazzjoni għas-Servizzi tal-Ilma jwettqu l-obbligi regolatorji tagħhom. Meta jagħmlu dan, parti mdaqqsa mill-problema tal-ilmijiet fit-toroq tagħna tisparixxi.

 

Ippubblikat fuq Illum: 4 ta’ Novembru 2018

Advertisements

Rainwater: the cost of incompetence

In his latest Budget speech, Finance Minister Edward Scicluna informed us that more studies will be carried out to identify flooding risks, simultaneously seeking to maximise the use of rainwater.

Edward Scicluna is aware that, as a result of climate change, storms are more intense than ever. When it rains, it pours, and our infrastructure is not capable of handling the resulting rainwater. To add to the impact of climate change, we also have to deal with the risks created as a direct result of incompetent regulators.

For the past 138 years,legislation in Malta has specifically provided for the construction of water cisterns in buildings, primarily residential ones. The dimensions of these water cisterns varied over time. Originally, they were related to the floor area of the residence but in the recent past, the required volume was reduced to be related to the footprint of the building.

These regulatory provisions are, however, more honoured in the breach, even when reduced. This is not a recent phenomenon. Regulatory control in Malta has been in steep decline since the building boom of the 1960s. I remember, while I was still a student – many moons ago- leafing through a UN expert-financed report penned in the late 1960s which, even then, had measured the significant increase in foul water in our sewers during intense rainfall, clearly indicating that too much rainwater was going to waste notwithstanding the collection obligations. The situation has not improved since!

Instead of being collected in rainwater cisterns, in an ever-increasing number of cases rainwater is discharged directly onto our roads or into the public sewers. Large volumes of rainwater, which can be utilised for various purposes, are being wasted. Its use domestically could substantially reduce water bills.

When rainwater is discharged into our public sewers, not only does the water overflow onto our streets, but it also increases the costs of sewage purification unnecessarily.
The major culprits are a substantial portion of the developers of blocks of flats and maisonettes. The government, both directly, as well as through its agencies, has also (in the recent past) been responsible for the development of housing estates without providing for the collection of rainwater.

In particular, it is common knowledge that in cases where basement or semi-basement garages are constructed, the duty to provide for the collection of rainwater is very rarely complied with. The Planning Authority (PA) is responsible for determining and ensuring the observance of the conditions of development permits which, in most cases, specify the required capacity of a rainwater cistern.

Over the years, the Water Services Corporation (WSC) has taken over responsibility for the management of the public sewers from the former Drainage Department. This responsibility includes authorising the owners of newly- constructed properties to connect the drains with the public sewer. Is the WSC verifying that it is only the drains that are connected and, in particular, that rainwater pipes are not connected to the public sewer too? The obvious answer is provided by our streets on a rainy day. Clearly, no one is bothering to check what is connected to the public sewer.

This leads to the conclusion that, while the culprit for the present state of affairs is the building industry because, more often than not, it does not provide for rainwater storage in new developments, it is not the only one to blame. The authorities and government departments must take a substantial share of the blame for not complying with their regulatory responsibilities. The PA and the WSC could have stopped the abuse, but they did not.

A number of areas are practically out of bounds whenever heavy or continuous rain hits the Maltese islands. This is a source of danger and, in fact, the Civil Protection Department is heavily involved in assisting residents or motorists who are trapped as a result of flooding.

Money made available by the EU has been used to fund a project for the construction of underground tunnels, as a result of which rainwater from our streets and roads is being collected and discharged into the sea. Public funds have been used to cover up private irregularities.

The EU funds utilised in the construction of these tunnels have been used to squander a very precious resource. European taxpayers’ money has also have been flushed down the drain. This could have been put to a much better use had it been applied to address the lack of adequate rainwater harvesting in our towns and villages.

My advice to Edward Scicluna is that before wasting any more public funds he should ensure that the Planning Authority and the Water Services Corporation carry out their regulatory responsibilities. When they do, a considerable part of the problem of the flooding of our streets will disappear.

published in The Malta Independent on Sunday: 4 November 2018

Tall Buildings : the advice ignored by the Maltese authorities

Ali report

 

“Tall buildings cannot be avoided in our times. The choice we have is whether to control them or else whether to put up with their future growth.” These were the concluding comments of a report drawn up by Professor Mir Ali from the University of Illinois at Urbana-Champaign USA after a visit to Malta in 2008 during which he met with and advised MEPA on the future of tall buildings in Malta.The report is entitled Urban Design Strategy Report on Tall Buildings in Malta.

Professor Ali’s report contains recommendations most of which are as relevant today as when they were originally drafted. Central to these recommendations, way back in 2008, was the need to draw a master plan addressing tall buildings and their impacts. “Lack of a master plan,”  Professor Ali stated, “results in uncontrolled developments and unpredictable impacts on urban life.”  The developed master plan,  Prof. Ali emphasised, should be “for Malta as a whole and for the selected sites for tall buildings, individually.”  Drawing up such a master plan with a reasonable level of detail will take time to carry out, a considerable portion of which should be utilised in consultation, primarily with the residents to be impacted. Certainly much more time would be required than the November 2016 target indicated by the government earlier this week.  A moratorium on the issuing of any development permit for high-rises until such time that a master plan has been discussed and approved would be a very reasonable course of action.

Professor Ali considered six sites, which were indicated to him by MEPA, as having the potential of hosting high-rise development. He proposed the following rank order : Qawra, Gżira, Tignè, Paceville, Pembroke and Marsa.  Such a ranking order by Prof. Ali is qualified by an emphasis on the substantial infusion of public monies which is required. Prof. Ali commented that if the number of sites are reduced to less than six it would be much better for Malta.

Professor Ali made a number of incisive remarks.

There is a need for an objective market and feasibility study for each project, which study should include the life cycle cost of the project. In view of the high vacancy rate of existing residential units, Prof. Ali queried the kind of occupancy expected of high-rises. Failure of high-rises will impact the economy of the whole of Malta which has no safety valve because of its size and lack of adequate elasticity, he stressed.

An efficient public transport is a fundamental requirement for the Maltese islands irrespective of whether high-rises are developed or not. But for the success of tall buildings “an integrated sustainable public transport system” is absolutely necessary. Yet, surprise, surprise, Professor Ali observed that “there is no efficient public transport system that is efficient and that covers the whole of Malta”

Sounds like familiar territory!

Infrastructural deficiencies must be addressed. If the existing infrastructure is inadequate or in a state of disrepair it must be upgraded and expanded to meet future needs. Tignè residents in Sliema have much to say about the matter, not just with reference to the state of the roads in the area but more on the present state of the public sewers! Residents of the Tignè peninsula are not the only ones who urgently require an upgrade of their infrastructural services. Residents in many other localities have similar requirements.

Social and environmental impacts of tall buildings must be considered thoroughly at the design stage. However Maltese authorities have developed the habit of ignoring the social impacts of development projects. In addition, it is very worrying that, as reported in the press earlier during this week,  Prime Minister Joseph Muscat does not seem to be losing any sleep over the matter.

People living in a low-rise environment consider high-rises as intrusive. Unless public participation is factored in at a very early stage through planned beneficial impacts on the community in terms of economic benefits, upgrade of services and the general benefits of the redevelopment of the surroundings, such projects do not have a future.

The upkeep of high-rises is quite a challenge which requires skills that are different from low-rise buildings. Notwithstanding changes to the relevant provisions of the law, there already exist serious difficulties in bringing together owners of low-rise multi-owned properties in order that they can ensure that maintenance of such properties is addressed. The challenge of high-rises is exponentially more complex.

The above is a snap-shot of Prof. Ali’s report. From what I’ve heard from a number  of people who met Professor Ali, he was more vociferous in his verbal utterances. Unfortunately,  his advice has been largely ignored.

 

published in The Malta Independent on Sunday – 26 June 2016

€9 biljuni mitluqa?

building industry Malta

In-numru ta’ propjetajiet reżidenzjali  vojta qiegħed dejjem jiżdied.

Iċ-ċensiment tal-1995 kien wera li   f’Malta u Għawdex kien hawn 35,723 propjetá reżidenzjali vojta. Għaxar snin wara,  fl-2005 dan in-numru żdied sewwa u laħaq 53,136. L-uffiċċju nazzjonali tal-istatistika diġa’ indika li fiċ-ċensment ta’ Novembru 2011 dan in-numru kompla jiżdied u laħaq it-72,150 post reżidenzjali vojt.

Din il-propjeta’ vojta għandha valur ta’ biljuni ta’ euros. Snin ilu kienet stmata b’valur ta’ €5 biljuni. B’żieda sostanzjali ta’ propjeta’ vojta l-valur issa hu iktar qrib id-€9 biljuni. Dan hu kapital mejjet.  Investiment li sar jew li intiret u ġie mitluq.

Uħud jirraġunaw li x’jiġri (jew ma jiġrix) minn propjetá vojta m’hu affari ta’ ħadd ħlief tas-sidien tal-istess propjetá. Dan ir-raġunament  hu wieħed żbaljat għax il-fatt li propjetá ma tkunx qed tintuża u titħalla vojta għandu impatt fuq il-komunita kollha.

Waqt li hawn 72,150 propjetá reżidenzjali vojta għandna mat-3,000 familja jfittxu saqaf diċenti għal fuq rashom!

Meta propjetá titħalla vojta din toħloq pressjoni biex tinbena iktar art għall-ħtiġijiet li jinqalgħu minn żmien għal żmien. Dan meta dawn il-ħtiġijiet jistgħu faċilment ikunu sodisfatti b’uħud mill-propjetajiet vojta.  L-art li għandna hi limitata u ma nistgħux nibqgħu nibnu iktar art.  Il-pressjoni biex tinbena iżjed art iġġib magħha l-ħtieġa ta’ iktar toroq kif ukoll il-bżonn li jkunu estiżi s-servizzi: is-sistema tad-drenagg, is-servizz tad-distribuzzjoni tal-ilma u tal-elettriku kif ukoll id-dwal fit-toroq.  Dawn is-servizzi huma diġa ipprovduti għall-propjetajiet vojta.  L-ispiża saret imma għal xejn, għax il-propjetá vojta! L-ispiża trid terġa’ issir għall-propjetá li qed tkompli tinbena biex b’hekk inkomplu nżidu ċ-ċimiterju ta’ propjetajiet vojta.

It-72,150 post reżidenzjali vojt f’Novembru 2011 jokkupaw spazju 9 darbiet daqs B’Kara!

Iffaċċjat b’din is-sitwazzjoni l-Gvern immexxi mill-Partit Nazzjonalista mexxa l-quddiem politika irresponsabbli għax meta fl-2006 ikkonkluda l-pjani lokali flok fittex li jikkkontrolla l-firxa esaġerata tal-bini ġieb il-quddiem politika li tinkoraġixxi iktar bini li m’għandniex bżonnu. Fl-2006 l-Gvern immexxi minn Lawrence Gonzi kellu quddiemu r-riżultat taċ-ċensiment tal-2005 li kien juri żieda sostanzjali fin-numru ta’ propjetá reżidenzjali vojta (minn 35,723 fl-1995 għal 53,136 fl-2005). Flok ma applika l-brejkijiet: żied b’mod sostanzjali l-art li tista’ tinbena, żied in-numru ta’ sulari li jistgħu jinbnew f’ħafna lokalitajiet u għamilha iktar faċli li jinbnew il-penthouses!

Is-sitwazzjoni illum bħala riżultat tal-politika żbaljata tal-Gvern immexxi minn Lawrence Gonzi hi ħafna agħar! Iċ-ċifra ta’ 72,150 post residenzjali vojt f’Novembru 2011 hi allarmanti u tfisser li l-pajjiż m’għandux bżonn ta’ żieda fil- bini reżidenzjali għal snin kbar.

Presentement għaddejjin proċeduri biex ikunu reveduti l-Pjani Lokali. Ikun ġenn jekk dan il-fatt ma jingħatax piż sostanzjali huma u jitħejjew il-Pjani Lokali ġodda.  Ir-reviżjoni tal-Pjani Lokali għandha titlaq minn dan il-punt.

Iż-żmien jagħtina parir jekk il-Gvern immexxi minn Joseph Muscat hux ser ikun irresponsabbli daqs dak immexxi minn Lawrence Gonzi jew jekk hux ser jibda jsewwi l-problemi.  Id-dikjarazzjonijiet li saru s’issa li l-industrija tal-bini hi meqjusa mill-Partit Laburista bħala pilastru importanti għall-ekonomija tal-pajjiż m’huwiex ta’ awgurju tajjeb.

Flok nibnu iktar ikun aħjar li nagħmlu użu aħjar minn dak li hu diġa mibni. Hawn propjeta’ reżidenzjali  mibnija iżda mhiex użata li tista’ isservi l-ħtiġijiet tal-pajjiż  għal snin twal.

ippubblikat oriġinalment fuq iNews nhar it-Tlieta 27 t’Awwissu 2013