When caves collapse: people may be killed

On the 14 September the Planning Authority approved application PA3487/19 which proposed the   “stabilization of dangerous rock slope; repair to deteriorated concrete wall and construction of wave dissipation slope along the Qui Si Sana coastline”.

In simple language this involves a permit for remedial works after a cave along the Sliema Qui Si Sana coastline collapsed, thereby exposing the MIDI development works immediately behind the cave: the basement level of residential blocks T14 and T17.

We have been told that the cave collapsed as a result of erosion along the coastline. Some readers may tend to forget that way back in 2016, a Maltese geologist had sounded the alarm that a “high-rise had been constructed over a fractured and eroded sea cliff, which could collapse any time soon.” The collapse in fact occurred relatively quite soon, signifying that the geologist was pointing out the obvious which was being ignored or not given due consideration by the developer and his advisors.

The point to be made is why the Planning Authority permitted the development to take place so close to the coastline. As far as I am aware, the EIA relative to the Tigne Development by MIDI does not reveal any detailed studies on the condition of the coast as well as on the impacts of erosion on the Qui Si Sana coastline and its relevance to the development of the MIDI project. The issue is not just one of remedial works but on why the Planning Authority  ignored the state of the coast, as a result permitting development too close to the coastline for comfort. The collapse is adequate proof of all this. The Planning Authority has much to explain in this specific case. Its actions, or lack of them, should be investigated.

The issue is not one relative to the structural stability of the development but of the protection of the coastline.

Erosion as a result of natural elements occurs continuously. It is a natural ongoing phenomenon.

In this respect it may be pertinent to draw attention to a report, authored by a team of geologists, dated October 2007 and entitled : “Report on Coastal Sliema. Geology, geomorphology, sites of scientific interest and coastal protection considerations.” This report was commissioned by the Sliema Local Council.

The 50-page report, which makes interesting reading, emphasises that a number of sites along the Sliema coast “are undergoing rapid coastal erosion that will increase with climate change, resulting in instability or failure in coastal infrastructure.”

Of particular interest is that the report, authored in 2007, goes on to state that “The faulted coast along Għar id-Dud is retreating rapidly by dislodgement of boulders along joints and faults. Public structures that may be affected include Tower Road promenade. The Għar id-Dud cave may also partially or totally collapse, leading to the caving-in of the overlying pedestrian promenade. If collapse is sudden and during daytime/early night time, injury and loss of lives may result.”

I have personally drawn attention of the Transport Minister to the above some time ago, however to date I am not aware that any action has been taken.

The matter was already very worrying way back in 2007 and most probably it is even worse now, after thirteen years, given that no coastal protection works have been taken in hand in the area in the intervening period.

The Għar id-Dud cave is the result of natural erosion and collapse accelerated by wave action. This is a natural process that cannot be halted unless adequate coastal protection works are initiated. If nature is left on its own, the end result is quite predictable: a complete collapse of Għar id-Dud, a caving in of the overlying pedestrian promenade and a number of dead or injured pedestrians, depending on the time of day when a collapse possibly occurs.

Will Transport Malta and the other authorities wake up from their slumber and act immediately please?

published in The Malta Independent on Sunday: 27 September 2020

Il-mina bejn Malta u Għawdex: lil hinn mill-ponta ta’ mneħirna

Il-mina taħt il-baħar bejn Malta u Għawdex ser tkun mina għall-karozzi u mhux mina għan-nies. Biex din tagħmel sens ekonomiku ser ikollha tiddependi minn żieda fit-traffiku bejn il-gżejjer u għaldaqstant tikkontradixxi l-ispirtu tal-Pjan Nazzjonali għat-Trasport sas-sena 2025.

Tajjeb li niftakru li l-Pjan Nazzjonali għat-Trasport imfassal fl-2016 mill-Gvern Laburista jenfasizza li l-linja politika dwar it-transport u l-ippjanar tiegħu f’Malta baqgħet qatt ma ħares fit-tul. Dan ikkaġuna “nuqqas ta’ direzzjoni strateġika u n-nuqqas ta’ kapaċità li jkunu ndirizzati materji diffiċli, bħar-restrizzjonijiet dwar karozzi privati.”

Minflok ma jippresenta politika maħsuba biex tindirizza t-tnaqqis tal-karozzi privati mit-toroq tagħna, l-Gvern u l-aġenziji tiegħu baqgħu għaddejin b’ħidma li tkompli ssaħħaħ id-dipendenza mill-karozzi privati. Dan qed isir permezz ta’ investiment eċċessiv fl-infrastruttura tat-trasport lokali. Dan l-investiment qed isir bil-għan li jżid iżjed karozzi minn kemm filfatt jesgħu t-toroq tal-pajjiż, u dan biex jissodisfa lin-negozjanti tal-karozzi. Importanti ukoll li nirrealizzaw li ladarba l-emmissjonijiet mit-trasport jirrappreżentaw l-ikbar kontribut tagħna għaż-żieda tal-karbonju fl-arja, dawn qegħdin ixekklu l-politika dwar it-tibdil fil-klima li kull Gvern sensibbli jenħtieg isegwi. Dan minkejja li l-Gvern jiftaħar li kien minn tal-ewwel li segwa u beda jimplimenta l-konklużjonijiet tas-summit ta’ Pariġi dwar il-klima.

Fil-konferenza stampa il-Ministri Ian Borg u Justyne Caruana saħqu li l-investituri li ser jinvestu fil-mina għandhom jimmiraw lejn mina li tkun kapaċi tiffaċilita l-moviment ta’ 9,000 karozza kuljum bejn il-gżejjer. Dan ifisser illi jiġi ġġenerat livell ta’ traffiku li jlaħħaq it-tripplu ta’ dak li għandna illum, b’mod konsistenti mal-projezzjonijiet tal-istudju li għamlet id-ditta E-cubed rigward il-vijabilità ekonomika tal-proġett. Dan l-istudju kien ġie kkummissjonat minn Transport Malta u l-Kamra Għawdxija tal-Kummerċ.

Il-ħlas li jkun meħtieġ li jsir għall-użu tal-mina, jiġifieri t-toll, jiddetermina kif jinġabru lura l-ispejjes biex tiġi żviluppata l-mina u biex din tibqa’ topera tul is-snin. Dan kollu jiddependi minn kemm il-mina tintuża mill-karozzi. L-esiġenza li mill-mina jgħaddi l-ikbar traffiku possibli hija l-bażi li ssejjes l-esistenza tal-mina, għax mingħajr dan it-traffiku ma jinġabrux il-flejjes li għandhom jagħmlu tajjeb għall-ispejjes u l-profitti ta’ min ser jidħol għal dan “l-investiment”. Imma dan min-naħa l-oħra jmur kontra objettiv bażiku tal-Pjan Nazzjonali għat-Trasport li bi kliem ċar jispjega li t-tnaqqis tal-karozzi mit-toroq hu essenzjali jekk tassew irridu nħarsu lil hinn mill-ponta ta’ mneħirna.

L-ammont ta’ ħlas li ser jinġabar mill-utenti tal-mina ser jiddependi mill-ispiża meħtieġa biex din tiġi żviluppata u mill-ħtieġijiet tal-operat tagħha. Ir-rapporti tal-konferenza stampa li saret iktar kmieni din il-ġimgħa ma taw l-ebda indikazzjoni dwar l-istima ta’ din l-ispiża. F’dan l-istadju dan jinftiehem għax għadu ma ġie iffinalizzat l-ebda diżinn. Hemm ukoll raġuni partikolari oħra. L-informazzjoni dwar il-ġejoloġija tal-Fliegu inġabret biss dan l-aħħar u mhemm l-ebda dubju li ser ikun meħtieġ iżjed iżjed tagħrif speċifiku rigward iż-żoni problematiċi. L-istudji mistennija li jkollhom impatt kemm fuq id-disinn finali u kemm fuq l-ispiża li tirriżulta u allura fuq il-ħlas li jkun meħtieg li jintalab mill-utenti tal-mina.

Rari ħafna li proġetti bħal dawn isegwu l-istima tal-ispejjes. Pereżempju, rigward il-każ tal-mina bejn il-power station tal-Marsa u dik ta’ Delimara nafu li l-ispiża finali kienet viċin id-doppju tal-istima iniżjali u dan minħabba in-nuqqas ta’ informazzjoni ġeoloġika. Minħabba dan sfrondaw partijiet mill-mina waqt li kien għaddej ix-xogħol u kellhom isiru ħafna iżjed xogħolijiet, fosthom ċerti bidliet f’partijiet mir-rotta tal-mina nifsha!

Min-naħa l-oħra l-ispiża fuq iċ-Channel Tunnel bejn Folkestone f’Kent u Coquelles ħdejn Calais qabżet l-istima b’madwar 80 fil-mija u dan minkejja li kienu saru studji ġeoloġiċi dettaljati.

Fl-aħħar l-ispiża reali ser tkun bejn is-600 miljun u biljun euro, u din ser tiddependi mid-disinn finali u mid-diffikultajiet ġeoloġiċi li ser jaffaċċja t-tħaffir tal-mina taħt il-Fliegu.

Dejjem jekk isir, dan il-proġett ser iħalli impatti ambjentali sinifikanti, kemm f’Malta kif ukoll f’Għawdex, fosthom li qerda tal-villaġġ trogloditiku fl-Għerien, fil-limiti tal-Mellieħa.

Hemm soluzzjonijiet oħra li jistgħu jindirizzaw b’mod adegwat il-mobilità bejn il-gżejjer Maltin. Irridu nkunu kapaċi naħsbu b’mod kreattiv sabiex insibu soluzzjoni għall-problema reali tal-mobilità tan-nies, iżjed minn dik tal-karozzi. Dan jista’ jseħħ biss jekk nieħdu inizjattivi li bihom naslu ninfatmu mid-dipendenza tagħna mill-karozzi. Dment li ma naslux sa dan il-punt m’aħniex ser inkunu nistgħu nsibu soluzzjoni sostenibbli.

Ippubblikat fuq Illum : Il-Ħadd 12 ta’ Jannar 2020

 

Gozo tunnel depends on maximising car movements

The Gozo-Malta undersea tunnel is a tunnel for cars, not for people. It is, in fact, the antithesis of the underlying theme of the National Transport Master Plan for 2025.

It is pertinent to remember that the Transport Master Plan, drawn up in 2016 by the present government, emphasises that the approach to transport planning and policy in Malta has, to date, generally been short-term in nature. This “has resulted in the lack of strategic direction and the inherent inability to address difficult issues such as private vehicle restraint.”

Instead of presenting a rigorous policy addressing private vehicle restraint, the government and its agencies are continuously seeking to reinforce car-dependency through the encouragement of excessive investments in the local transport infrastructure. This investment aims at increasing the capacity of our roads and consequently dances to the tune of the car lobby. Also, knowing that emissions originating from transport are currently the major contributor to carbon emissions in Malta, encouraging car-dependency is directly opposite to the climate change policy which any sensible government should follow at this point in time.

The Gozo-Malta undersea tunnel is no exception. This week’s press conference by Ministers Ian Borg and Justyne Caruana emphasised the fact that the brief for would-be investors is a tunnel that should have a capacity of 9,000 vehicle movements on a daily basis. This is three times the current movement of vehicles between the islands and is in line with the projections of the 2015 E-cubed study commissioned by Transport Malta and the Gozo Business Chamber dealing with an economic cost benefit analysis of the available strategic options.

The toll to be charged – and, consequently, the tunnel’s economic performance – is dependent on generating the maximum traffic possible. Maximising traffic underpins the very existence of the tunnel. This runs counter to the basic objective of the National Transport Master Plan 2025 which – in crystal clear language – spells out the reduction of cars from our roads as the long-term objective of Malta’s National Transport Policy.

The toll which will eventually have to be paid is also dependent on the costs to be incurred in the development and the operation of the tunnel. Reports on this week’s press conference do not indicate any estimated cost which is, at this stage,  understandable in view of the fact that the design of the tunnel is not yet cast in stone. There is, however, a specific reason for this: geological information of relevance has been compiled very recently and it will undoubtedly require additional studies focusing on problem areas, which studies will have a significant bearing on both the actual design as well as the eventual cost and consequently the toll expected.

This type of projects very rarely follow estimated costs; the tunnel linking the Marsa and Delimara powers stations in Malta, for example, overshot its projected costs by around 100 per cent due to the absence of adequate geological information. As a result, parts of the tunnel caved its construction, necessitating a substantial amount of additional work, including redirecting parts of it.

On the other hand, expenditure on the Channel Tunnel linking Folkestone in Kent to Coquelles near Calais exceeded the projected estimates by around 80 per cent, notwithstanding the availability of detailed geological studies.

At the end of the day, the actual costs of the tunnel will be anything between 600 million and one billion euros, depending on the actual design as well as the geological issues encountered below the Gozo Channel.

If the tunnel materialises, it will result in significant environmental damage in both Malta and Gozo, including the obliteration of the troglodytic village at l-Għerien in the limits of Mellieħa.

There are other solutions which can adequately address the mobility between Malta and Gozo. It does however require thinking outside the box and focusing on the real issue: people mobility. This would require a bold initiative of addressing head-on car-dependency in both Malta and Gozo. Until we take the decision to start shedding our car- dependency, however, no solution can be achieved.

published in The Malta Independent on Sunday: 12 January 2020

Il-mina t’Għawdex: ħmar il-lejl

Il-Ministru Ian Borg, iktar kmieni din il-ġimgħa, infurmana li kien qed jaħdem biex iwettaq il-ħolma ta’ diversi Għawdxin billi jmexxi l-quddiem il-proċess tal-mina taħt qiegħ il-baħar bejn Malta u Għawdex. Wara dibattitu li ilu għaddej is-snin hu ċar li iktar milli jwettaq il-ħolm ikun aħjar jekk Ian Borg jipprepara ruħu għal ħmar il-lejl.

Saru studji ġejoloġiċi imma lanqas il-konklużjonijiet ġenerali dwarhom ma nafu. Għadhom mistura qieshom xi sigriet tal-istat. Tliet snin ilu l-ġejoloġista Peter Gatt kien ġibed l-attenzjoni għall-fatt li l-mina tal-Enemalta bejn il-power station tal-Marsa u Delimara kienet swiet id-doppju ta’ dak ippjanat u dan minħabba kollass tal-blat f’diversi punti matul il-mina nnifisha. Dan kien seħħ bħala riżultat tan-nuqqas ta’ informazzjoni ġejoloġika meta ġiet imfassla l-mina. Kieku dan kellu jseħħ waqt li jkun għaddej ix-xogħol fuq il-mina bejn Malta u Għawdex hu inevitabbli li jkollna problemi kbar, inkluż possibilment numru ta’ mwiet.

Hu fatt magħruf li fil-Fliegu hemm diversi kisriet ġejoloġiċi (geological faults). Tajjeb li nirrealizzaw li tnejn mill-proposti għall-mina, li saru minn Mott MacDonald, il-konsulenti ta’ Transport Malta, jgħaddu minn dawn il-kisriet.

Li jkunu eżaminati l-kampjuni tal-blat f’laboratorju, anke jekk għal ftit ġimgħat, bla dubju jżid l-għarfien tal-ġejoloġija taż-żona imma dan mhux biżżejjed biex fuqu jittieħdu deċiżjonijiet dwar id-diżinn tal-proġett. Biżżejjed nifhmu li minkejja l-istudji ġejoloġiċi dettaljati fuq numru kbir ta’ snin, ix-xogħol fuq il-mina bejn l-Ingilterra u Franza, iċ-Channel Tunnel, kellu jieqaf u jkun devjat diversi drabi minħabba li t-tħaffir iltaqa’ ma problemi ġejoloġici li ma kien hemm l-ebda indikazzjoni tagħhom fl-istudji dettaljati!

L-istudji serji jieħdu ż-żmien biex isiru: ma jistgħux ikunu mgħaġġla minħabba data determinata minn agenda politika.

Tliet snin ilu, Transport Malta, flimkien mal-Kamra tal-Kummerċ Għawdxija kkummissjonaw studju ekonomiku, ferm qabel ma biss bdew l-istudji ġejoloġiċi. L-istudju kien intitolat Establishing a Permanent Link between the Island of Gozo and Mainland Malta: An Economic Cost Benefit Analysis of Available Strategic Options, li kien sar minn E-Cubed Consultants. Dan l-istudju kien argumenta li t-traffiku bejn il-gżejjer kien ipproġettat li fuq perjodu ta’ 15il sena jiżdied minn medja ta’ 3000 moviment kuljum għal 9000 moviment kuljum. Argument li jmur kontra l-Pjan Nazzjonali għat-Trasport approvat fl-2015 ukoll.

Il-mina proposta teħtieġ ammont kritiku ta’ movimenti ta’ karozzi li jħallsu biex jgħaddu mill-mina u per konsegwenza minn fuqhom jinġabru l-ispejjes tal-mina kif ukoll il-profitti tal-operaturi. Fi ftit kliem il-mina, biex tirnexxi tiddependi minn moviment kbir ta’ karozzi kuljum. Dan imur kontra l-politika dwar it-trasport tal-lum, li ta’ l-inqas fuq il-karta, timmira għal tnaqqis ta’ karozzi mit-toroq tagħna. Din hi materja li bla dubju għandha tkun eżaminat mill-istudju fuq l-impatti ambjentali (EIA) dwar il-mina proposta. Dan l-istudju għadu fl-istadji inizzjali tiegħu u dan wara li l-Awtorità dwar l-Ambjent u r-Riżorsi ftit ġimgħat ilu approvat dak li għandu jkun indirizzat (terms of reference) minn dan l-istudju. L-EIA hu stadju essenzjali li minnu jeħtieġ li jgħaddi l-proġett.

Għaldaqstant, kien irresponsabbli l-Ministru tat-Trasport, meta, iktar kmieni din il-ġimgħa, ħabbar li fi żmien sitt xhur kienet ħierġa sejħa internazzjonali għall-offerti għall-mina bejn Malta u Għawdex. Dan ifisser li dawn l-istudji huma irrelevanti? Fl-opinjoni tiegħi il-Ministru  qiegħed jagħti  dan il-messaġġ ċar u tond.

Din hi l-agħar forma ta’ governanza ħażina għax jimmina l-isforzi tal-awtoritajiet fil-qadi ta’ dmirijiethom. B’dan il-ħsieb jiena ktibt lill-Ombudsman u tlabtu jinvestiga dan in-nuqqas ta’ governanza tajba. Il-Gvern għandu jkollu l-paċenzja li jistenna sakemm ikunu konklużi l-istudji ambjentali qabel ma jieħu d-deċiżjonijiet.

 

Ippubblikat fuq Illum : Il-Ħadd 16 ta’ Diċembru 2018

Gozo tunnel nightmares

Minister Ian Borg informed us, earlier this week, that he seeks to turn into reality a Gozitan “long-held dream” by starting the process for a Malta-Gozo tunnel below the seabed. After debating the matter for years, it is clear that rather more than dreams, Ian Borg should prepare himself for a nightmare.

Geological studies have now been carried out and the results therof are being treated as some state secret. Three years ago, geologist Peter Gatt had drawn attention to the fact that the Enemalta tunnel between the Marsa power station and Delimara had a cost overrun of 100 per cent as a result of rock collapse along several points of the tunnel. This had occurred due to inadequate geological information fed into the design process. If the same were to happen during the Malta-Gozo tunnel works, a series of disasters, including possibly loss of life, would be inevitable.

It is a known fact that the Gozo channel is full of geological faults. It is pertinent to note that two of the tunnel options put forward by Transport Malta advisors Mott MacDonald pass through an active fault in the Gozo channel.

Taking borehole samples and examining them in a laboratory over a few weeks certainly increases our knowledge of the geology of the area but it is nowhere near the sufficient knowledge on the basis of which one can conclude the design parameters of the project. Suffice it to point out that notwithstanding the detailed geological studies spanning over many years and underpinning planning for the Channel Tunnel linking Folkestone in Kent and Coquelles near Calais, the drilling of the tunnel had to be deviated at certain points because of unpredicted geological formations.

Serious studies take years to conclude: they cannot be rushed to meet a deadline set by a political agenda.

Feasibility studies have been carried out some time ago, long before the geological studies were even taken in hand. Three years ago, the Gozo Business Chamber in conjunction with Transport Malta commissioned a study entitled Establishing a Permanent Link between the Island of Gozo and Mainland Malta: An Economic Cost Benefit Analysis of Available Strategic Options. In the study, which was carried out by E-Cubed Consultants, it was argued that the average annual daily traffic (AADT) between the islands is projected to increase from 3000 to 9000 vehicle movements over a 15-year period.

This feasibility study makes assumptions which run counter to the National Transport Master Plan objective of reducing cars from our roads.

Basically, the proposed tunnel requires a critical mass of vehicular movements which would be subject to the payment of a toll and hence contribute to the recovery of the capital outlay, maintenance costs and profits. This runs counter to current Maltese Transport policy, which (at least on paper) aims to reduce the use of private cars from our roads.

This is an issue which would undoubtedly be examined by the Environmental Impact Assessment (EIA) on the proposed Tunnel which study is currently in its initial stages after the Environment and Resources Authority recently approved the terms of reference of such a study. The EIA is an essential stage of the assessment of the project.

It was therefore irresponsible for the Minister of Transport, earlier this week, to announce that within six months an international call for tenders would be issued relative to the Malta-Gozo undersea Tunnel. Does this mean that the government considers the EIA irrelevant? This, in my opinion is the clear message being conveyed.

It is the worst form of bad governance as it undermines the efforts of the established authorities in carrying out their responsibilities. With this in mind, I have written to the Ombudsman and asked him to investigate this breach of good governance. Government should have the patience of awaiting the outcome of the EIA before taking any further decisions.

published in The Malta Independent on Sunday : 16 December 2018

Gozo Channel: tunnelling discounts

discounts

 

When the current Gozo Channel tunnel debate was initiated around five years ago, the then Minister Chris Said went on record to emphasise that the proposed tunnel, to be bored under the seabed would cost approximately €150 million. This estimate has now been upped to €300 million.

This is one of the basic assumptions underlying the study commissioned by Transport Malta, together with the Gozo Business Chamber, and carried out by E Cubed Consultants Ltd, commonly referred to as the “economic and financial feasibility study”.

The study makes interesting reading as it considers the economics of the so-called permanent link between the islands of Gozo and Malta. I respectfully submit that the conclusions of this study are as valid as the basic assumptions which underpin it.

I draw the attention of readers to the fact that proposals for various tunnels are currently under consideration in other countries.

The first is the proposed Trans-Pennine tunnel, intended to improve the transport links between Sheffield and Manchester in the UK. The ambitious 18- mile (29km) tunnel would be built under the A628 Woodhead Pass. After having established that the geology of the Pennines was suitable for such a project, it was estimated that the approximate cost would be a staggering £6 billion (€8.40 billion).

The second UK project is the much-debated and controversial tunnel at Stonehenge. Intended to upgrade the A303 road, it is projected to have a length of 1.8 miles (2.9 km) and is currently estimated to cost £490 million (€700 million).

Another projected tunnel, recently given the green light, will pass between the Danish island of Lolland and the German island of Fehmarn. Construction work on this 19 km tunnel should start next January and it is estimated to cost €8.7 billion.

The estimates for the proposed tunnels in the United Kingdom indicate that the cost of a 10 km tunnel would exceed the €2 billion mark, even before taking into account the fact that excavating below the seabed would cost substantially more. In addition, the Danish/German tunnel indicates a pro-rata cost of €4.7 billion for a 10 kilometre tunnel.

In addition, the geological parameters below the Gozo Channel are still largely unknown: geological studies have to be carried out and examined in detail in order to establish the facts. Without these facts, the basic information necessary to take essential design decisions is still unavailable. What is known is worrying enough: the presence of active geological faults running right through the proposed route of the tunnel.

The study’s conclusions – that the proposed tunnel is economically viable – have  been reached prior to the carrying out of geological studies. Even the estimated costs used in the economic viability study have been established before these essential geological studies.

In this type of project, no estimate of costs can be precise – especially if it is not based on adequate and essential information.

This indicates that the conclusion of the economic viability study was premature.

In addition to the geological studies, additional important (and essential) studies have (as far as is known) not yet been commissioned. These include studies on the environmental impact, business impact and social impact.

Once concluded, such studies will inevitably point to other issues that will require detailed consideration, including the extent to which the projected permanent link between Malta and Gozo will toll the death knell for holiday accommodation in Gozo: hotels, flats and farmhouses.

The above indicates that, unless the promoters of the tunnel have some cast-iron guarantee of substantial discounts on the costs, the proposal is a non-starter even before any consideration of the environmental, business and social impact. It is about time to begin serious work on the practical alternative: a fast ferry service between Gozo and the Grand Harbour.

published in The Malta Independent on Sunday : 6 December 2015

Tunnel vision

cart-horse

 

Gozo’s connectivity issues are considered as a problem when in reality they define Gozo and determine its distinct features. Unfortunately, in this respect both the government and the opposition have developed a tunnel vision, that is they tend to focus on just one view and ignore everything else.

The latest twist in the current debate is the declaration by the Finance Minister in his budget statement earlier this month that the feasibility study commissioned by Transport Malta, together with the Gozo Business Chamber has been concluded positively  and that the next step would be  the commissioning of a technical and geological study relative to the projected tunnel across the Gozo Channel.

Transport Malta, prodded by the Gozo Business Chamber, seems to be bent on putting the cart before the horse as it is inconceivable how a feasibility study could be concluded without first having identified all the geological issues and examined them in detail.  Knowing that the Gozo Channel contains a number of geological faults, including active ones, leads to the logical preliminary conclusion that geological studies of the area proposed to be tunnelled could have a substantial bearing on the technical parameters of the project. This would include the specific  route to be selected, the actual works to be carried out and the costings. The geological studies could also lead to a technical recommendation to select an alternative solution other than boring a tunnel below the seabed .

When the PN-led government placed the issue on the national agenda, former Minister Chris Said gave his guesstimate that the tunnel would cost in the region of €150 million. We have recently been informed that this guesstimate has increased substantially to between €250 and €300 million.

These guesstimates are on the low side, because when the geological issues have been examined the estimate could well shoot up to over €1 billion- this being around 4 times what has been taken into consideration in the so-called “feasibility study”.

These type of project very rarely follow estimated costs. The tunnel linking the Marsa and Delimara powers stations in Malta, for example, overshot its projected costs by around 100% due to the absence of adequate geological information. As a result, parts of the  tunnel caved in during works, necessitating substantial additional work, including redirecting parts of it. On the other hand,  expenditure on the Channel Tunnel linking Folkestone in Kent to Coquelles near Calais exceeded the projected estimates by around 80% notwithstanding the availability of detailed geological studies.

Last week, one of the Sunday newspapers referred to a survey carried out by the Gozo Tourism Association which indicates that 64% of tourism operators in Gozo are adamantly against the proposed tunnel because the direct result of this would be to render Gozo as an appendage of Malta. Gozo would be transformed into a one- day destination, just like most of the other tourism attractions spread over the Maltese islands.

Gozitan tourism operators have a very valid point, as the direct result of this tunnel vision is that Gozo would be transformed from an island into a remote village. Most hotels in Gozo as well as the flats and farmhouses available to let, could then require the identification of another use.

This matter has not yet been examined and yet it is fundamental to the decision-making process and should have been the first step in the whole exercise.

All this muddle and I have not yet commenced discussing the environmental impacts of the proposed tunnel!

The tunnel will generate large quantities of rock which require disposal. The precise amount would depend on the route to be followed (and consequently the length of the tunnel) as well as the selected design (the cross sectional area) and could be anything between one and two million cubic metres of fragmented rock.

In addition, the proposed point of entry of the tunnel at Iċ-Ċumnija on the outskirts of Mellieħa, would most probably be accessed through a new road network in the area immediately behind the Għadira Nature Reserve and bird sanctuary. This means that all the environmental issues which were discussed when the proposed TEN-T network was being debated will once more be of relevance.

There are many other ways through which Gozo’s connectivity issues can be addressed and there are certainly more cost effective ways than the proposed tunnel. The costs to be considered are not just financial: they include social and environmental costs, which should be considered on the drawing board and not as an afterthought.

This is the problem with the tunnel vision – you just have one view, excluding all the others.

Il-mina bejn Malta u Għawdex

Gozo_tunnel_route_alignment_options

 

Ma nafx jekk il-Ministru tal-Finanzi kienx jaf x’inhu jgħid meta qal li l-feasibility study “ikkummissjonat minn Transport Malta u l-Gozo Business Chamber” dwar il-mina bejn Malta u Għawdex kien lest. Imbagħad fis-sentenza ta’ wara jgħidilna li l-pass li jmiss issa huwa l-istudju tekniku u ġeoloġiku dwar il-mina.

Il-mistoqsija toħroġ waħedha: kif tista’ tagħmel feasibility study sura, jiġifieri studju dwar jekk jaqbilx li jsir il-proġett, meta għadek ma lestejtx l-iktar studju importanti: dak ġeoloġiku.

Dan ilu żmien jingħad minn kull min jaf l-affarijiet.

Jiena ktibt dwar dan kważi ħames snin ilu.

Iktar importanti milli ktibt jien, illum tkellem mat-Times il-ġeoloġista Peter Gatt. Tkellem ukoll mat-Times nhar it-3 ta’ Frar 2011.

Dr Peter Gatt jispjega fit-Times tal-lum għaliex qabel ma jsir l-istudju ġeoloġiku ma tista’ tikkonkludi xejn. Dan l-istudju hu “a vital first step”. Dan minħabba li l-istudju ġeoloġiku, jekk isir sewwa, jidentifika l-problemi ġeoloġiċi fuq ir-rotta li tkun ser titħaffer. Min-naħa l-oħra, jispjega Dr Gatt, jekk l-istudju ma jsirx, jew ma jsirx sewwa l-ispejjes tal-proġett jimmoltiplikaw. Kif ġara, jgħidilna Dr Gatt, fil-mina bejn Delimara u l-Marsa [bejn iż-żewġ power stations] li swiet id-doppju ta’ dak ippjanat minħabba li, billi ma kienx hemm informazzjoni ġeoloġika adegwata f’idejn min fassal il-proġett, kien hemm kollass tal-blat f’diversi partijiet tal-mina.

Dr Gatt isemmi l-eżempju tal-istudju ġeoloġiku li sar bi preparazzjoni għaċ-Channel Tunnel bejn l-Ingilterra u Franza. Dan l-istudju dam 50 sena biex sar u minkejja dan, l-ispiża taċ-Channel Tunnel xorta varjat bi 80% mill-istima oriġinali.

Meta wieħed iqis dan kollu ma nafx x’feasibility study sar!

Qalulna ukoll (mhux fil-baġit) li l-mina ser tiġi tiswa madwar €250 miljun. Meta tqis l-ispejjes li jistgħu jkunu meħtieġa minħabba l-kundizzjonijiet ġeoloġiċi taħt il-Fliegu bejn Malta u Għawdex, naħseb li din l-istima hi baxxa ħafna. Fil-fatt jiena fl-artiklu tiegħi tal-2011 kont għidt li probabbilment li l-ispiża tkun bejn €1 biljun u €1.5 biljun. Dan kont ibbażajtu fuq l-ispiża stmata għall-mina bejn il-gżira Daniża ta’ Lolland u l-gżira Ġermaniża ta’ Fehmarn li kienet qed tkun diskussa f’dak iż-żmien. Għalkemm dawn huma stimi imma xorta hemm diskrepanza kbira li mhiex ġustfikata.

Hemm dawn il-problemi kollha u għandna ma bdejniex nitkellmu dwar impatti ambjentali, li minnhom hemm bosta.

Il-mina, biex issir, ser tiġġenera kwantità kbira ta’ blat imqatta. Dan ivarja skond id-diżinn u jista’ jammonta sa żewġ miljun metri kubi ta’ blat. Hemm ukoll is-siti Natura 2000 li qegħdin viċin ħafna taż-żona fejn ser tiżbokka l-mina fl-inħawi taċ-Ċumnija limiti tal-Mellieħa.

Imma l-feasibility study lest, qalilna l-Ministru!