Drittijiet Ambjentali bir-riforma kostituzzjonali

Il-Konvenzjoni Kostituzzjonali, meta tiġi, tkun opportunità unika biex ikunu ntrodotti drittijiet ambjentali fil-Kostituzzjoni. Dan jista’ u għandu jseħħ billi dawn id-drittijiet jinkitbu b’mod ċar u li ma jħallux lok għal miżinterpretazzjoni f’riforma li ilna nistennew żmien kbir.

Id-drittijiet ambjentali, għandhom ikunu ċari daqs id-drittijiet dwar il-propjetà. Għax il-Kostituzzjoni, b’mod pervers, filwaqt li tipproteġi drittijiet dwar il-propjetà, illum ma toffri l-ebda protezzjoni għal drittijiet ambjentali bħad-dritt għal arja nadifa inkella għal aċċess għal ilma nadif. L-anqas ma tipproteġi l-bijodiversità jew il-pajsaġġ jew kwalunkwe dritt ambjentali ieħor bħall-ħarsien tar-riżorsi naturali. Id-drittijiet tal-individwi huma b’xi mod protetti imma d-drittijiet tal-komunità l-anqas biss jissemmew.

Meta wieħed iqis li d-drittijiet tal-ġenerazzjonijiet preżenti huma kemm kemm protetti, xejn ma hemm biex niskantaw jekk il-liġi bażika tagħna tinjora lill-ġenerazzjonijiet futuri għal kollox.

Waqt li dan kollu kien għaddej, Malta, fuq livell internazzjonali nsistiet dwar il-ħarsien ta’ qiegħ il-baħar (1967), dwar il-klima (1988) u dwar il-ġenerazzjonijiet futuri (1992). Imma minkejja dawn l-isforzi fuq livell internazzjonali, ma sar l-ebda sforz lokali biex dak li nippriedkaw barra minn xtutna nipprattikawh f’artna.  

Il-Kostituzzjoni ta’ Malta, fil-Kapitlu 2 tagħha, għanda sett ta’ linji gwida biex dawn ikunu ta’ għajnuna lill-Gvern billi b’mod ġenerali jindikaw it-triq li jeħtieġ li jimxi fuqha.  Wieħed minn dawn il-prinċipji gwida huwa dwar il-ħarsien ambjentali. Dan tfassal oriġinalment fl-1964 u ġie emendat riċentement.  

Wara din il-lista ta’ linji gwida, fl-aħħar tagħhom, il-Kostituzzjoni tgħidilna li ma tistax tmur il-Qorti biex tinfurzhom!

Dan il-kapitlu tal-Kostituzzjoni huwa mfassal fuq dak li hemm fil-Kostituzzjoni tal-Irlanda u tal-Indja. Kif jispjega Tonio Borg fil-kummentarju tiegħu dwar il-kostituzzjoni ta’ Malta, l-Qorti Suprema Indjana minkejja kollox, imma, interpretat il-linji gwida fil-Kostituzzjoni Indjana bħala l-kuxjenza tal-kostituzzjoni : linja gwida tabilħaqq.  Għax x’jiswa’ li toqgħod tipprietka u tħambaq dwar il-prinċipji bażiċi u l-linji gwida jekk imbagħad iżżomhom milli jkunu infurzati?

Sfortunatament, din l-istess attitudni kienet addottata meta tfasslet leġislazzjoni dwar l-ippjanar għall-użu tal-art u dwar l-ambjent. Anke hawn wara ħafna dikjarazzjonijiet ta’ prinċipji nsibu li dwar dawn ukoll ma tistax tmur il-Qorti biex tinfurzhom.

Fis-sottomissjonijiet tagħha lill Konvenzjoni Kostituzzjonali, Alternattiva Demokratika,  ipproponiet li dan il-kapitlu fil-kostituzzjoni għandu jkun revedut b’mod li jkun assigurat li l-Gvern dejjem jimxi mal-linji gwida kostituzzjonali.   

F’pajjiżi oħra, s-soċjetà ċivili, meta meħtieġ, tieħu azzjoni legali kontra l-Gvern biex tassigura li dan jerfa’ r-responsabbiltajiet ambjentali tiegħu f’kull ħin.

Għandi f’moħħi żewġ eżempji partikolari.

L-ewwel wieħed hu dwar azzjoni legali fir-Renju Unit mill-għaqda ambjentali  Client Earth dwar il-mod kajman li bih il-Gvern Ingliż mexa fil-konfront ta’ strateġija nazzjonali dwar il-kwalità tal-arja. Il-materja spiċċat quddiem il-Qorti Suprema li f’deċiżjoni ta’ struzzjonijiet lill-Gvern dwar iż-żmien sa meta għandha tkun lesta din l-istrateġija.   

It-tieni eżempju qiegħed l-Olanda u jikkonċerna t-tibdil fil-klima u l-grupp ambjentali  Urgenda li mar il-Qorti biex iġiegħel lil Gvern jistabilixxi miri raġjonevoli dwar emissjonijiet li għandhom impatt fuq il-bidla fil-klima.

F’dawn l-eżempji, u probabbilment f’bosta oħrajn, l-azzjoni tal-Gvern kienet ferm inferjuri għall-aspettattivi tas-soċjetà ċivili. Ikun tajjeb li l-kostituzzjoni tipprovdina bl-għodda biex kull meta l-Gvern jonqos milli jimxi mal-miri kostituzzjonali ikun possibli li nippruvaw inġibuh f’sensieh.

Sal-lum niddependu mill-Kummissjoni Ewropeja bit-tama li meta jkun meħtieġ din tieħu passi. Nistqarr li f’materji ambjentali, bosta drabi tiddisappuntana u ma tagħmilx dak li nistennew minn għandha.

Il-konvenzjoni Kostituzzjonali sal-lum, tista’ tkun l-unika forum fejn dan id-difett kostituzzjonali jkun possibli li nikkoreġuh. Għax hu l-waqt li d-drittijiet ambjentali jsiru parti integrali mill-kostituzzjoni.

Ippubblikat fuq Illum: il-Ħadd 6 ta’ Settembru 2020

Green rights through Constitutional reform

The forthcoming Constitutional Convention, whenever it happens, is an opportunity to entrench green rights in the Constitution. This can be carried out through spelling out such rights unequivocally during the long overdue constitution reform process.

Environmental rights should be spelled out just as clearly as property rights. Our Constitution perversely protects property rights but then does not protect our right to clean air or the access to clean water. Nor does it protect our biodiversity or our landscape or any other environmental right. Individual rights are somehow protected but then the rights of the community are not even given a mention.

When one considers that the rights of the present generations are very poorly protected no one should be surprised that future generations are completely ignored in our basic law.

While this has been going on, Malta has on an international level been insisting on protecting the seabed (1967), the climate (1988) and future generations (1992). Notwithstanding the efforts made on an international level, however, there was no corresponding local effort to put in practice what we preached in international fora.

Malta’s Constitution contains a set of guiding principles in its Chapter 2 which are intended to guide government in its workings. One of these guiding principles relates to environmental protection. Originally enacted in 1964 it was amended recently.

Yet there is a catch. Towards the end of this list of guiding principles our Constitution announces that these principles cannot be enforced in a Court of Law.

This Chapter of our Constitution is modelled on similar provisions in the Irish and the Indian Constitutions. As explained in Tonio Borg’s A Commentary on the Constitution of Malta, however, the Indian Supreme Court has over the years interpreted similar constitutional provisions as the conscience of the Constitution, a real guiding light. It does not make sense to proclaim basic and guiding principles, declare that they should guide the state but then stop short of having them enforceable in a Court of Law.    

Unfortunately, the same attitude was adopted when drafting land use planning and environmental legislation. This legislation contains similar provisions: the announcement of basic guiding principles which are not enforceable in a Court of Law.

In its submissions to the Constitutional Convention, Alternattiva Demokratika-The Green Party has proposed revisiting this Chapter of the Constitution in order that it would be possible to ensure that government follows the guiding principles at all times instead of selectively.  

In other countries it is possible for civil society to take legal action to ensure that government carries out its environmental responsibilities adequately and at all times.

Two particular examples come to mind.

The first is legal action in the United Kingdom by environmental NGO Client Earth relative to the UK government’s lack of action on the formulation of an air quality masterplan. The matter ended up in a Supreme Court decision which instructed the UK government to act and established the parameters for such action including the relative timeframe.  

The second example comes from Holland and concerns climate change and the environmental action group Urgenda Foundation which went to Court to force government’s hand on the establishment of reasonable climate change emission targets.

In both the above examples, and probably in many others, government action was far below the expectations of civil society. It is right that the Constitution should provide us with the necessary tools such that whenever government fails to live up to the Constitutional benchmarks, (be these environmental or any other) then, civil society may call government to order.

To date we depend on the EU Commission as a fallback position, but the EU Commission, unfortunately, does not always live up to what we expect of it. It has let us down many times. The Constitutional Convention is the only forum possible, so far, through which this constitutional deficiency can be corrected. It is about time that our green rights are entrenched in the Constitution.

published in The Malta Independent on Sunday: 6 September 2020

Il-Wasteserve: fil-Magħtab qed topera bla permess

Diversi bdiewa fil-Magħtab ġew mitluba biex jikkuntattjaw il-Wasteserve sa tmiem dan ix-xahar biex ikun iffaċilitat aċċess għall-art li qed jaħdmu u dan bl-iskop li din tkun eżaminata, “bil-ħsieb li possibilment tiġi akkwistata għal skop pubbliku”. L-avviż legali numru 1261 li kien ippubblikat fil-Gazzetta tal-Gvern tas-17 ta’ Diċembru 2019 jgħid li hemm tmien biċċiet art fil-Magħtab li qed ikunu ikkunsidrati. Din l-art għandha qies totali ta’ 254,144 metru kwadru, jiġifieri ftit iktar minn 226 tomna. Il-parti l-kbira minn din l-art għadha qed tinħadem minn bdiewa minkejja ċ-ċirkustanzi diffiċli li nħolqu kemm ilhom joperaw il-miżbliet fil-Magħtab sa mill-1975.

Xi ħtieġa għandha l-Wasteserve għal din l-art? Hemm tlett materji ewlenin dwar l-iskart li huma pendenti.

Il-miżbliet tal-Magħtab dalwaqt jimtlew. Bla dubju din is-sitwazzjoni wasalna għaliha qabel ma kien antiċipat minħabba li qed jintrema wisq skart. Ir-riċiklar għadu f’livell insinifikanti. Il-ġbir tal-iskart organiku b’mod separat għadu fil-bidu. Hemm ħtieġa urġenti biex in-nies tagħraf iktar il-ħtieġa li tnaqqas kemm l-iskart kif ukoll l-ammont tiegħu li qed jintrema fil-miżbliet.

Il-Gvern, probabbilment li qed iħejji biex jimplimenta l-wegħda elettorali dwar l-egħluq tal-impjant ta’ Sant Antnin li jittratta l-iskart. Din hi l-wegħda numru 27 fil-Manifest Elettorali tal-Partit Laburista fl-Elezzjoni Ġenerali tal-2017. Probabbilment li dan ukoll jispiċċa fil-kumpless tal-iskart tal-Magħtab li l-Wasteserve tirreferi għalih bħala iċ-Ċentru Ambjentali tal-Magħtab.

It-tielet pendenza hi dwar l-inċineratur li hu ppjanat li jibda jopera sa mhux iktar tard mill-2025.

Il-Wasteserve teħtieġ l-art għal dan kollu li ser iwassal biex il-Magħtab ikun ikkonvertit permanentement fiċ-ċentru tal-iskart fil-gżejjer Maltin.

Il-Wasteserve, fuq is-sit elettroniku tagħha tiddeskrivi l-kumpless tal-Magħtab bħala ta’ daqs komparabbli mal-Belt Valletta, li hi mifruxa fuq 600,000 metru kwadru.

Iktar kmieni din il-ġimgħa, Aaron Farrugia, Ministru għall-Ambjent u l-Ippjanar, li hu politikament responsabbli għall-Wasteserve, spjega, waqt intervista mxandra fl-aħbarijiet, li l-estensjoni ippjanata għall-miżbla tal-Magħtab teħtieġ 145,000 metru kwadru ta’ art filwaqt li l-inċineratur propost u “faċilitajiet oħra” jirrikjedu 105,000 metru kwadru addizzjonali. Il-facilitajiet oħra hi referenza għall-wegħda elettorali tal-Partit Laburista biex jingħalaq l-impjant ta’ Sant Antnin għat-trattament tal-iskart.

Meta tgħodd din l-art kollha għall-proġetti tal-Wasteserve fil-Magħtab ifisser li d-daqs tal-kumpless għall-iskart ser jikber għal madwar 850,000 metru kwadru, meta l-proġetti jkunu kollha mplimentati. Dan ifisser li l-254,144 metru kwadru ta’ art, primarjament raba’, imsemmija fil-Gazzetta tal-Gvern tas-17 ta’ Diċembru 2019 tista’ isservi bl-eżatt. Xejn ma neħodha bi kbira, iżda, jekk il-Wasteserve, bħal Oliver Twist, tkun trid iktar.

Meta nfittxu fuq is-sit elettroniku tal-Awtorità għall-Ambjent u r-Riżorsi (ERA) niskopru li l-permessi magħrufa bħala IPPC permits għall-miżbliet fil-Magħtab ilhom ftit li skadew. Dan ifisser li l-Wasteserve qed topera fi stat ta’ illegalità.

Dawn il-permessi imsejħa IPPC permits (Integrated Pollution Prevention and Control) jinħarġu mill- ERA skond kif tistabilixxi direttiva tal-Unjoni Ewropeja u dan wara li jkun hemm studji dettaljati dwar l-attività (f’dan il-kaz miżbla) u l-impatti tagħha. Skont is-sit elettroniku tal-ERA il-miżbla għal skart mhux perikoluż Ta’ Żwejra fil-kumpless tal-Magħtab qed topera fuq bażi ta’ permess li skada fl-24 ta’ Lulju 2018 (permess IP 0001/05). Min-naħa l-oħra l-miżbla għal skart mhux perikoluż tal-Għallis, ukoll fil-kumpless tal-Magħtab, qed topera fuq bażi ta’ permess li nħareġ f’Jannar 2013 u li suppost li skada fil-bidu tal-2018 (permess IP 0001/06).

Jekk il-Wasteserve mhiex kapaċi tosserva liġijiet bażiċi ambjentali, ħadd ma għandu jeħodha bi kbira li sezzjoni tal-pubbliku jimxu fuq l-eżempju tagħha.

Għaliex ir-regolatur ambjentali, l-ERA, tittollera dawn l-affarijiet? Ic-Chairman tal-ERA, l-Professor Victor Axiaq, għandu jispjega x’inhu jiġri. Messu ilu li rreżenja.

 

ippubblikat fuq Illum :Il-Ħadd 23 ta’ Frar 2020

Wasteserve illegality: sort it out.

Farmers in Magħtab have been asked to contact Wasteserve by the end of this month in order to facilitate access to their land “for necessary studies with the intent of potential acquisition for public purposes”.

Notice No. 1261, published in The Malta Government Gazette of the 17 December 2019, lists eight plots of land in Magħtab which are being considered. This land has a total area of 254,144 square metres, slightly more than 226 tumoli. Most of it is currently in use as agricultural land, notwithstanding the difficult circumstances arising from the operation of landfills in the vicinity since 1975.

What does Wasteserve need this land for?

There are three pending major waste management issues. The landfills at Magħtab will be shortly filled to capacity. Undoubtedly this state of affairs has been reached earlier than anticipated due to the fact that too much waste is still going to landfill. Recycling is still at an insignificant level and the collection of organic waste as a separate stream is still in its infancy. Much still needs to be done in instilling awareness on the need to substantially reduce both the amount of waste generated as well as the portion of it going to landfill.

The Government will most probably also seek to implement its electoral pledge to close down the Sant Antnin Waste Treatment Plant. This is pledge number 27 in the Labour Party Electoral Manifesto for the 2017 general election and it, too, will most probably be directed towards the Magħtab waste complex, which Wasteserve refers to as the Magħtab Environment Complex.

The third pending issue is the so-called thermal facility, ie the incinerator, scheduled to be in operation by 2025.

Wasteserve needs land to address all three issues, in the process converting Magħtab permanently to the waste centre of the Maltese islands.

The Wasteserve website describes the Magħtab complex as being comparable in size to Valletta, being spread over an area in excess of 600,000 square metres.

Earlier Environment and Planning Minister Aaron Farrugia, politically responsible for Wasteserve, explained on television that the planned extension to the Magħtab landfill requires 145,000 square metres of land, while the proposed incinerator and other facilities would require an additional 105,000 square metres. The “other facilities” is an indirect reference to the Labour Party’s commitment to close down the Sant Antnin Waste Treatment Plant.

Adding up all this land required for the Wasteserve projects at Magħtab would bring the Waste Complex size to around 850,000 square metres when all the pending projects are implemented. This means that the proposed take up of 254,144 square metres of mostly agricultural land as declared in the Malta Government Gazette edition of the 17 December 2019 could be just enough space. Like Oliver Twist, Wasteserve will, however, most probably come back for more.

Perusal of the information available on the website of the Environment and Resources Authority (ERA) indicates that the IPPC permit for the landfills at Magħtab expired quite some time ago, signifying that Wasteserve is operating in a state of illegality.

The IPPC (Integrated Pollution Prevention and Control) permits are issued by the ERA in terms of the provisions of the relative EU Directive after detailed studies on the operations and impacts of the proposed activity have been carried out or updated. According to the ERA website, the Ta’ Żwejra non-hazardous landfill within the Magħtab complex is operating on the basis of a permit which expired on the 24 July 2018 (permit IP 0001/05). On the other hand, the L-Għallis non-hazardous landfill, also within the Magħtab complex, operates on the basis of a permit which was issued way back in January 2013 and should have expired at the beginning of 2018 (permit IP 0001/06). Malta’s only landfill complex is thus operating without a valid permit at law.

If Wasteserve does not follow the provisions of basic environmental legislation, it is no surprise that a section of the population is inclined to follow its example.

Sort it out!

Why does the Environment and Resources Authority (ERA), the environment regulator, tolerate this state of affairs? The Chairman of ERA, Professor Victor Axiaq, owes an explanation. His resignation is long overdue.

published on The Malta Independent on Sunday : 23 February 2020

Il-governanza tajba tinbena fuq it-transparenza

It-transparenza hi l-pedament essenzjali għal governanza tajba. B’kuntrast ma dan, il-governanza ħażina, ġeneralment, tkun akkumpanjata mis-segretezza u dan billi jinżamm jew ikun ostakolat l-aċċess għal informazzjoni ta’ kull xorta, liema informazzjoni għandha tkun pubblika.

Il-ħmieġ assoċjat mal-Panama Papers sirna nafu bih fil-mument li nkixfet l-informazzjoni dwar dawk li fittxew l-irkejjen tad-dinja fejn hi inkoraġġita s-segretezza: irkejjen fejn jinħbew il-flus ġejjin mill-korruzzjoni u mill-evażjoni tat-taxxi. Bl-istess mod l-iskandlu tal-Vitals dwar l-isptarijiet kif ukoll it-taħwid kollu assoċjat mal-power station ma kienux iseħħu kieku l-Partit Laburista fil-gvern għażel it-trasparenza flok is-segretezza bħala għodda essenzjali għat-tmexxija. Segretezza li kultant twaħħxek.

Il-kontabilità li tant niftaħru biha, wara kollox, hi dwar ir-responsabbiltà. Tfisser l-għarfien tar-responsabbiltà għal dak li nagħmlu. Dan ma jistax iseħħ jekk ma ssaltanx it-trasparenza, dejjem, u mhux biss meta jaqbel.

Il-ġimgħa l-oħra, l-Kamra tal-Kummerċ ippubblikat dokument bil-ħsibijiet tagħha dwar il-ħtieġa li tkun inkoraġġita u msaħħa l-governanza tajba. Kien f’loku li l-Kamra tal-Kummerċ emfasizzat li l-governanza tajba hi msejsa fuq it-trasparenza, l-kontabilità u s-saltna tad-dritt.

Spiss jingħad li l-informazzjoni hi poter. It-transparenza hi dwar dan il-fatt: li jkun assigurat li l-poter jinfirex. Għax hu biss meta jkollna għarfien ta’ dak li qed jiġri li nkunu nistgħu neżerċitaw id-dritt bażiku tagħna bħala ċittadini li neżiġu illi kull min jiddeċiedi, u allura jeżerċita l-poter, jagħti kont ta’ egħmilu, dejjem.

Il-politiċi mhumiex l-uniċi li jieħdu d-deċiżjonijiet. Dawn jinkludu liċ-ċivil u lil dawk li jmexxu l-awtoritajiet u l-istituzzjonijiet imwaqqfa biex jiffaċilitaw l-amministrazzjoni tal-istat fit-twettieq tal-funzjonijiet u d-dmirijiet tiegħu.

It-trasparenza teħtieġ li tinfirex anke fid-dinja tal-kummerċ. Spiss nisimgħu lil min jemfasizza li l-politika m’għandiex tindaħal fis-settur privat, fid-dinja tan-negozju. Għal uħud għadu mhuwiex ovvju li anke s-settur privat, u in-partikolari id-dinja tan-negozju, għandu joqgħod lura milli “jindaħal” fil-politika. Fost affarijiet oħra dan ifisser il-ħtieġa li jkun regolat il-lobbying. Dan ma jsirx billi il-lobbying ikun ipprojibit imma billi kull attività ta’ lobbying tkun transparenti. Għax jekk il-lobbying isir sewwa jista’ ikollu impatt posittiv fuq it-tfassil tad-deċiżjonijiet. Hi is-segretezza li tagħti fama ħażina lill-lobbying, segretezza intenzjonata biex ixxaqleb id-deċiżjonijiet lejn interessi kummerċjali u fl-istess ħin biex tostor it-taħwid.

Huwa f’dan id-dawl li l-inizjattiva tal- Ministru l-ġdid għall-Ambjent Aaron Farrugia li jżomm lista tal-laqgħat kollha tiegħu ma’ dawk li jfittxu li jiltaqgħu miegħu, inkluż mal-utenti, u li jippubblika din l-informazzjoni fil-forma ta’ reġistru ta’ trasparenza hi pass kbir ‘il quddiem. Din l-inizjattiva hi f’waqtha u hi ta’ eżempju lill-politiċi oħrajn biex huma ukoll jipprattikaw it-transparenza. Dan imma għandu jkun biss l-ewwel pass li jeħtieġ li jkun segwit bil-pubblikazzjoni ta’ proposti u dokumenti li l-Ministru jirċievi waqt dawn il-laqgħat, kif ukoll il-minuti tal-laqgħat li jkunu saru.

Hu magħruf li l-Kummissarju dwar l-Istandards fil-Ħajja Pubblika qed iħejji biex jippubblika abbozz ta’ proposti dwar ir-regolamentazzjoni tal-lobbying biex eventwalment tkun tista’ issir konsultazzjoni pubblika dwarhom. Nittama li dan iwassal għal sitwazzjoni fejn f’dan il-qasam Aaron Farrugia ma jibqax l-eċċezzjoni. Il-bqija tal-membri tal-Kabinett m’għandhomx jibqagħlhom għażla. Għandhom ikunu kostretti li huma wkoll jaġixxu biex it-transparenza fil-ħidma politika tkun ir-regola u mhux l-eċċezzjoni.

Għax huwa biss meta it-transparenza jkollha egħruq fondi u b’saħħithom li nistgħu nibdew intejbu d-demokrazija tagħna billi neliminaw id-difetti li tħallew jakkumulaw tul is-snin.

 

ippubblikat fuq Illum : Il-Ħadd 26 ta’ Jannar 2020

Good governance is founded on transparency

Transparency is the indispensable foundation of good governance. In contrast, bad governance is generally wrapped in secrecy through the withholding of information which should be in the public domain.

The Panama Papers saga saw the light of day when information on those seeking secretive jurisdictions was made public. These locations are sought to hide  the fruits of corruption or tax evasion from public scrutiny. Similarly, the Vitals hospital scandal, as well as the power station scandal, with all their ramifications, would undoubtedly not have occurred if the Labour Party in government had embraced transparency instead of entrenching secrecy as its basic operational rule.

Transparency is a basic characteristic of good governance whereas secrecy is the distinguishing mark of bad governance, inevitably leading to unethical behaviour and corruption.

Without transparency, accountability is a dead letter; devoid of any meaning. A lack of transparency transforms our democracy into a defective process, as basic and essential information required to form an opinion on what’s going on is missing. After all, accountability is about responsibility: it signifies the acknowledgement and assumption of responsibility for our actions. This cannot be achieved unless and until transparency reigns supreme.

Last week, the Chamber of Commerce published its views on the need to reinforce good governance. Pertinently it emphasised that good governance is founded on transparency, accountability and the rule of law.

It is said that knowledge (and information) is power. This is what transparency is all about: ensuring that power is shared by all as it is only when we are aware as to what is going on that we can exercise our basic right as citizens: holding decision-takers to account. Being in possession of information gives each and every one of us the power to act and exercise our civic rights.

Holders of political office are not the only decision-takers. Decision-takers include the civil service as well as those running authorities and institutions established to facilitate the administration of the state in carrying out its functions and duties.

Even business leaders should be transparent in their actions and decision-taking. Many a time we have heard the expression “we should take politics out of business”, signifying that politics should not interfere in the private sector.

To some it is less obvious that the reverse of that is just as important, meaning that we should also “take business out of politics”. Among other things, this signifies that we should regulate lobbying. This is not done by prohibiting lobbying but by focusing the spotlight of transparency on all lobbying activity. If lobbying is done properly, it could have a beneficial impact on policy making. It is secrecy that gives lobbying a bad reputation: a secrecy intended to derail decisions in a manner beneficial to the different lobby groups as well as to facilitate and shroud underhand deals.

In this respect the initiative of the newly appointed Environment Minister Aaron Farrugia to log all of his meetings with lobbyists and stakeholders and to publish a Transparency Register is a welcome step in laying solid foundations for the practice of transparency by holders of political office. It is, however, only a first step and must be eventually followed by the publication in real time of proposals received as well as the minutes of meetings held.

It is known that the Commissioner for Standards in Public Life will shortly be publishing proposals for the regulating of lobbying. Hopefully, this should lead to a situation where Aaron Farrugia would not be an exception. Others will be compelled to not only follow in his footsteps but to proceed much further in entrenching transparency in the working methods of holders of political office.

A deep-rooted commitment to transparency is the only way by which we can start repairing our defective democracy.

 

published in The Malta Independent on Sunday : 26 January 2020

Il-mina bejn Malta u Għawdex: lil hinn mill-ponta ta’ mneħirna

Il-mina taħt il-baħar bejn Malta u Għawdex ser tkun mina għall-karozzi u mhux mina għan-nies. Biex din tagħmel sens ekonomiku ser ikollha tiddependi minn żieda fit-traffiku bejn il-gżejjer u għaldaqstant tikkontradixxi l-ispirtu tal-Pjan Nazzjonali għat-Trasport sas-sena 2025.

Tajjeb li niftakru li l-Pjan Nazzjonali għat-Trasport imfassal fl-2016 mill-Gvern Laburista jenfasizza li l-linja politika dwar it-transport u l-ippjanar tiegħu f’Malta baqgħet qatt ma ħares fit-tul. Dan ikkaġuna “nuqqas ta’ direzzjoni strateġika u n-nuqqas ta’ kapaċità li jkunu ndirizzati materji diffiċli, bħar-restrizzjonijiet dwar karozzi privati.”

Minflok ma jippresenta politika maħsuba biex tindirizza t-tnaqqis tal-karozzi privati mit-toroq tagħna, l-Gvern u l-aġenziji tiegħu baqgħu għaddejin b’ħidma li tkompli ssaħħaħ id-dipendenza mill-karozzi privati. Dan qed isir permezz ta’ investiment eċċessiv fl-infrastruttura tat-trasport lokali. Dan l-investiment qed isir bil-għan li jżid iżjed karozzi minn kemm filfatt jesgħu t-toroq tal-pajjiż, u dan biex jissodisfa lin-negozjanti tal-karozzi. Importanti ukoll li nirrealizzaw li ladarba l-emmissjonijiet mit-trasport jirrappreżentaw l-ikbar kontribut tagħna għaż-żieda tal-karbonju fl-arja, dawn qegħdin ixekklu l-politika dwar it-tibdil fil-klima li kull Gvern sensibbli jenħtieg isegwi. Dan minkejja li l-Gvern jiftaħar li kien minn tal-ewwel li segwa u beda jimplimenta l-konklużjonijiet tas-summit ta’ Pariġi dwar il-klima.

Fil-konferenza stampa il-Ministri Ian Borg u Justyne Caruana saħqu li l-investituri li ser jinvestu fil-mina għandhom jimmiraw lejn mina li tkun kapaċi tiffaċilita l-moviment ta’ 9,000 karozza kuljum bejn il-gżejjer. Dan ifisser illi jiġi ġġenerat livell ta’ traffiku li jlaħħaq it-tripplu ta’ dak li għandna illum, b’mod konsistenti mal-projezzjonijiet tal-istudju li għamlet id-ditta E-cubed rigward il-vijabilità ekonomika tal-proġett. Dan l-istudju kien ġie kkummissjonat minn Transport Malta u l-Kamra Għawdxija tal-Kummerċ.

Il-ħlas li jkun meħtieġ li jsir għall-użu tal-mina, jiġifieri t-toll, jiddetermina kif jinġabru lura l-ispejjes biex tiġi żviluppata l-mina u biex din tibqa’ topera tul is-snin. Dan kollu jiddependi minn kemm il-mina tintuża mill-karozzi. L-esiġenza li mill-mina jgħaddi l-ikbar traffiku possibli hija l-bażi li ssejjes l-esistenza tal-mina, għax mingħajr dan it-traffiku ma jinġabrux il-flejjes li għandhom jagħmlu tajjeb għall-ispejjes u l-profitti ta’ min ser jidħol għal dan “l-investiment”. Imma dan min-naħa l-oħra jmur kontra objettiv bażiku tal-Pjan Nazzjonali għat-Trasport li bi kliem ċar jispjega li t-tnaqqis tal-karozzi mit-toroq hu essenzjali jekk tassew irridu nħarsu lil hinn mill-ponta ta’ mneħirna.

L-ammont ta’ ħlas li ser jinġabar mill-utenti tal-mina ser jiddependi mill-ispiża meħtieġa biex din tiġi żviluppata u mill-ħtieġijiet tal-operat tagħha. Ir-rapporti tal-konferenza stampa li saret iktar kmieni din il-ġimgħa ma taw l-ebda indikazzjoni dwar l-istima ta’ din l-ispiża. F’dan l-istadju dan jinftiehem għax għadu ma ġie iffinalizzat l-ebda diżinn. Hemm ukoll raġuni partikolari oħra. L-informazzjoni dwar il-ġejoloġija tal-Fliegu inġabret biss dan l-aħħar u mhemm l-ebda dubju li ser ikun meħtieġ iżjed iżjed tagħrif speċifiku rigward iż-żoni problematiċi. L-istudji mistennija li jkollhom impatt kemm fuq id-disinn finali u kemm fuq l-ispiża li tirriżulta u allura fuq il-ħlas li jkun meħtieg li jintalab mill-utenti tal-mina.

Rari ħafna li proġetti bħal dawn isegwu l-istima tal-ispejjes. Pereżempju, rigward il-każ tal-mina bejn il-power station tal-Marsa u dik ta’ Delimara nafu li l-ispiża finali kienet viċin id-doppju tal-istima iniżjali u dan minħabba in-nuqqas ta’ informazzjoni ġeoloġika. Minħabba dan sfrondaw partijiet mill-mina waqt li kien għaddej ix-xogħol u kellhom isiru ħafna iżjed xogħolijiet, fosthom ċerti bidliet f’partijiet mir-rotta tal-mina nifsha!

Min-naħa l-oħra l-ispiża fuq iċ-Channel Tunnel bejn Folkestone f’Kent u Coquelles ħdejn Calais qabżet l-istima b’madwar 80 fil-mija u dan minkejja li kienu saru studji ġeoloġiċi dettaljati.

Fl-aħħar l-ispiża reali ser tkun bejn is-600 miljun u biljun euro, u din ser tiddependi mid-disinn finali u mid-diffikultajiet ġeoloġiċi li ser jaffaċċja t-tħaffir tal-mina taħt il-Fliegu.

Dejjem jekk isir, dan il-proġett ser iħalli impatti ambjentali sinifikanti, kemm f’Malta kif ukoll f’Għawdex, fosthom li qerda tal-villaġġ trogloditiku fl-Għerien, fil-limiti tal-Mellieħa.

Hemm soluzzjonijiet oħra li jistgħu jindirizzaw b’mod adegwat il-mobilità bejn il-gżejjer Maltin. Irridu nkunu kapaċi naħsbu b’mod kreattiv sabiex insibu soluzzjoni għall-problema reali tal-mobilità tan-nies, iżjed minn dik tal-karozzi. Dan jista’ jseħħ biss jekk nieħdu inizjattivi li bihom naslu ninfatmu mid-dipendenza tagħna mill-karozzi. Dment li ma naslux sa dan il-punt m’aħniex ser inkunu nistgħu nsibu soluzzjoni sostenibbli.

Ippubblikat fuq Illum : Il-Ħadd 12 ta’ Jannar 2020

 

Gozo tunnel depends on maximising car movements

The Gozo-Malta undersea tunnel is a tunnel for cars, not for people. It is, in fact, the antithesis of the underlying theme of the National Transport Master Plan for 2025.

It is pertinent to remember that the Transport Master Plan, drawn up in 2016 by the present government, emphasises that the approach to transport planning and policy in Malta has, to date, generally been short-term in nature. This “has resulted in the lack of strategic direction and the inherent inability to address difficult issues such as private vehicle restraint.”

Instead of presenting a rigorous policy addressing private vehicle restraint, the government and its agencies are continuously seeking to reinforce car-dependency through the encouragement of excessive investments in the local transport infrastructure. This investment aims at increasing the capacity of our roads and consequently dances to the tune of the car lobby. Also, knowing that emissions originating from transport are currently the major contributor to carbon emissions in Malta, encouraging car-dependency is directly opposite to the climate change policy which any sensible government should follow at this point in time.

The Gozo-Malta undersea tunnel is no exception. This week’s press conference by Ministers Ian Borg and Justyne Caruana emphasised the fact that the brief for would-be investors is a tunnel that should have a capacity of 9,000 vehicle movements on a daily basis. This is three times the current movement of vehicles between the islands and is in line with the projections of the 2015 E-cubed study commissioned by Transport Malta and the Gozo Business Chamber dealing with an economic cost benefit analysis of the available strategic options.

The toll to be charged – and, consequently, the tunnel’s economic performance – is dependent on generating the maximum traffic possible. Maximising traffic underpins the very existence of the tunnel. This runs counter to the basic objective of the National Transport Master Plan 2025 which – in crystal clear language – spells out the reduction of cars from our roads as the long-term objective of Malta’s National Transport Policy.

The toll which will eventually have to be paid is also dependent on the costs to be incurred in the development and the operation of the tunnel. Reports on this week’s press conference do not indicate any estimated cost which is, at this stage,  understandable in view of the fact that the design of the tunnel is not yet cast in stone. There is, however, a specific reason for this: geological information of relevance has been compiled very recently and it will undoubtedly require additional studies focusing on problem areas, which studies will have a significant bearing on both the actual design as well as the eventual cost and consequently the toll expected.

This type of projects very rarely follow estimated costs; the tunnel linking the Marsa and Delimara powers stations in Malta, for example, overshot its projected costs by around 100 per cent due to the absence of adequate geological information. As a result, parts of the tunnel caved its construction, necessitating a substantial amount of additional work, including redirecting parts of it.

On the other hand, expenditure on the Channel Tunnel linking Folkestone in Kent to Coquelles near Calais exceeded the projected estimates by around 80 per cent, notwithstanding the availability of detailed geological studies.

At the end of the day, the actual costs of the tunnel will be anything between 600 million and one billion euros, depending on the actual design as well as the geological issues encountered below the Gozo Channel.

If the tunnel materialises, it will result in significant environmental damage in both Malta and Gozo, including the obliteration of the troglodytic village at l-Għerien in the limits of Mellieħa.

There are other solutions which can adequately address the mobility between Malta and Gozo. It does however require thinking outside the box and focusing on the real issue: people mobility. This would require a bold initiative of addressing head-on car-dependency in both Malta and Gozo. Until we take the decision to start shedding our car- dependency, however, no solution can be achieved.

published in The Malta Independent on Sunday: 12 January 2020

Il-mina t’Għawdex: ħmar il-lejl

Il-Ministru Ian Borg, iktar kmieni din il-ġimgħa, infurmana li kien qed jaħdem biex iwettaq il-ħolma ta’ diversi Għawdxin billi jmexxi l-quddiem il-proċess tal-mina taħt qiegħ il-baħar bejn Malta u Għawdex. Wara dibattitu li ilu għaddej is-snin hu ċar li iktar milli jwettaq il-ħolm ikun aħjar jekk Ian Borg jipprepara ruħu għal ħmar il-lejl.

Saru studji ġejoloġiċi imma lanqas il-konklużjonijiet ġenerali dwarhom ma nafu. Għadhom mistura qieshom xi sigriet tal-istat. Tliet snin ilu l-ġejoloġista Peter Gatt kien ġibed l-attenzjoni għall-fatt li l-mina tal-Enemalta bejn il-power station tal-Marsa u Delimara kienet swiet id-doppju ta’ dak ippjanat u dan minħabba kollass tal-blat f’diversi punti matul il-mina nnifisha. Dan kien seħħ bħala riżultat tan-nuqqas ta’ informazzjoni ġejoloġika meta ġiet imfassla l-mina. Kieku dan kellu jseħħ waqt li jkun għaddej ix-xogħol fuq il-mina bejn Malta u Għawdex hu inevitabbli li jkollna problemi kbar, inkluż possibilment numru ta’ mwiet.

Hu fatt magħruf li fil-Fliegu hemm diversi kisriet ġejoloġiċi (geological faults). Tajjeb li nirrealizzaw li tnejn mill-proposti għall-mina, li saru minn Mott MacDonald, il-konsulenti ta’ Transport Malta, jgħaddu minn dawn il-kisriet.

Li jkunu eżaminati l-kampjuni tal-blat f’laboratorju, anke jekk għal ftit ġimgħat, bla dubju jżid l-għarfien tal-ġejoloġija taż-żona imma dan mhux biżżejjed biex fuqu jittieħdu deċiżjonijiet dwar id-diżinn tal-proġett. Biżżejjed nifhmu li minkejja l-istudji ġejoloġiċi dettaljati fuq numru kbir ta’ snin, ix-xogħol fuq il-mina bejn l-Ingilterra u Franza, iċ-Channel Tunnel, kellu jieqaf u jkun devjat diversi drabi minħabba li t-tħaffir iltaqa’ ma problemi ġejoloġici li ma kien hemm l-ebda indikazzjoni tagħhom fl-istudji dettaljati!

L-istudji serji jieħdu ż-żmien biex isiru: ma jistgħux ikunu mgħaġġla minħabba data determinata minn agenda politika.

Tliet snin ilu, Transport Malta, flimkien mal-Kamra tal-Kummerċ Għawdxija kkummissjonaw studju ekonomiku, ferm qabel ma biss bdew l-istudji ġejoloġiċi. L-istudju kien intitolat Establishing a Permanent Link between the Island of Gozo and Mainland Malta: An Economic Cost Benefit Analysis of Available Strategic Options, li kien sar minn E-Cubed Consultants. Dan l-istudju kien argumenta li t-traffiku bejn il-gżejjer kien ipproġettat li fuq perjodu ta’ 15il sena jiżdied minn medja ta’ 3000 moviment kuljum għal 9000 moviment kuljum. Argument li jmur kontra l-Pjan Nazzjonali għat-Trasport approvat fl-2015 ukoll.

Il-mina proposta teħtieġ ammont kritiku ta’ movimenti ta’ karozzi li jħallsu biex jgħaddu mill-mina u per konsegwenza minn fuqhom jinġabru l-ispejjes tal-mina kif ukoll il-profitti tal-operaturi. Fi ftit kliem il-mina, biex tirnexxi tiddependi minn moviment kbir ta’ karozzi kuljum. Dan imur kontra l-politika dwar it-trasport tal-lum, li ta’ l-inqas fuq il-karta, timmira għal tnaqqis ta’ karozzi mit-toroq tagħna. Din hi materja li bla dubju għandha tkun eżaminat mill-istudju fuq l-impatti ambjentali (EIA) dwar il-mina proposta. Dan l-istudju għadu fl-istadji inizzjali tiegħu u dan wara li l-Awtorità dwar l-Ambjent u r-Riżorsi ftit ġimgħat ilu approvat dak li għandu jkun indirizzat (terms of reference) minn dan l-istudju. L-EIA hu stadju essenzjali li minnu jeħtieġ li jgħaddi l-proġett.

Għaldaqstant, kien irresponsabbli l-Ministru tat-Trasport, meta, iktar kmieni din il-ġimgħa, ħabbar li fi żmien sitt xhur kienet ħierġa sejħa internazzjonali għall-offerti għall-mina bejn Malta u Għawdex. Dan ifisser li dawn l-istudji huma irrelevanti? Fl-opinjoni tiegħi il-Ministru  qiegħed jagħti  dan il-messaġġ ċar u tond.

Din hi l-agħar forma ta’ governanza ħażina għax jimmina l-isforzi tal-awtoritajiet fil-qadi ta’ dmirijiethom. B’dan il-ħsieb jiena ktibt lill-Ombudsman u tlabtu jinvestiga dan in-nuqqas ta’ governanza tajba. Il-Gvern għandu jkollu l-paċenzja li jistenna sakemm ikunu konklużi l-istudji ambjentali qabel ma jieħu d-deċiżjonijiet.

 

Ippubblikat fuq Illum : Il-Ħadd 16 ta’ Diċembru 2018

Gozo tunnel nightmares

Minister Ian Borg informed us, earlier this week, that he seeks to turn into reality a Gozitan “long-held dream” by starting the process for a Malta-Gozo tunnel below the seabed. After debating the matter for years, it is clear that rather more than dreams, Ian Borg should prepare himself for a nightmare.

Geological studies have now been carried out and the results therof are being treated as some state secret. Three years ago, geologist Peter Gatt had drawn attention to the fact that the Enemalta tunnel between the Marsa power station and Delimara had a cost overrun of 100 per cent as a result of rock collapse along several points of the tunnel. This had occurred due to inadequate geological information fed into the design process. If the same were to happen during the Malta-Gozo tunnel works, a series of disasters, including possibly loss of life, would be inevitable.

It is a known fact that the Gozo channel is full of geological faults. It is pertinent to note that two of the tunnel options put forward by Transport Malta advisors Mott MacDonald pass through an active fault in the Gozo channel.

Taking borehole samples and examining them in a laboratory over a few weeks certainly increases our knowledge of the geology of the area but it is nowhere near the sufficient knowledge on the basis of which one can conclude the design parameters of the project. Suffice it to point out that notwithstanding the detailed geological studies spanning over many years and underpinning planning for the Channel Tunnel linking Folkestone in Kent and Coquelles near Calais, the drilling of the tunnel had to be deviated at certain points because of unpredicted geological formations.

Serious studies take years to conclude: they cannot be rushed to meet a deadline set by a political agenda.

Feasibility studies have been carried out some time ago, long before the geological studies were even taken in hand. Three years ago, the Gozo Business Chamber in conjunction with Transport Malta commissioned a study entitled Establishing a Permanent Link between the Island of Gozo and Mainland Malta: An Economic Cost Benefit Analysis of Available Strategic Options. In the study, which was carried out by E-Cubed Consultants, it was argued that the average annual daily traffic (AADT) between the islands is projected to increase from 3000 to 9000 vehicle movements over a 15-year period.

This feasibility study makes assumptions which run counter to the National Transport Master Plan objective of reducing cars from our roads.

Basically, the proposed tunnel requires a critical mass of vehicular movements which would be subject to the payment of a toll and hence contribute to the recovery of the capital outlay, maintenance costs and profits. This runs counter to current Maltese Transport policy, which (at least on paper) aims to reduce the use of private cars from our roads.

This is an issue which would undoubtedly be examined by the Environmental Impact Assessment (EIA) on the proposed Tunnel which study is currently in its initial stages after the Environment and Resources Authority recently approved the terms of reference of such a study. The EIA is an essential stage of the assessment of the project.

It was therefore irresponsible for the Minister of Transport, earlier this week, to announce that within six months an international call for tenders would be issued relative to the Malta-Gozo undersea Tunnel. Does this mean that the government considers the EIA irrelevant? This, in my opinion is the clear message being conveyed.

It is the worst form of bad governance as it undermines the efforts of the established authorities in carrying out their responsibilities. With this in mind, I have written to the Ombudsman and asked him to investigate this breach of good governance. Government should have the patience of awaiting the outcome of the EIA before taking any further decisions.

published in The Malta Independent on Sunday : 16 December 2018