Impjant nuklejari fi Sqallija?

Matul il-kampanja elettorali riċenti tal-2022, fl-Italja, fid-dibattitu politiku, reġgħet infetħet id-diskussjoni dwar il-ġenerazzjoni tal-enerġija nuklejari.

Matteo Salvini, presentement Ministru għall-Infrastruttura u t-Transport, apparti li hu ukoll Deputat Prim Ministru fil-Gvern ta’ koalizzjoni Taljan, emfasizza, li, fl-isfond tal-kriżi enerġetika kurrenti l-Italja għandha tikkunsidra mill-ġdid il-politika tagħha dwar l-impjanti nuklejari.

Il-votanti Taljani darbtejn esprimew ruħhom b’mod ċar dwar ir-rejatturi nuklejari fuq art Taljana. L-aħħar darba li għamlu dan kien f’referendum li sar f’Ġunju 2011, ftit wara d-diżastru nuklejari li seħħ f’Fukushima l-Ġappun f’Marzu 2011. Dakinnhar, 94 fil-mija ta’ dawk li vvutaw għażlu projibizzjoni totali ta’ kostruzzjoni ta’ impjanti nuklejari fl-Italja.

Il-kriżi kurrenti tal-enerġija qed isservi ta’ pressjoni fuq kulħadd biex jinstabu sorsi alternattivi ta’ enerġija bi prezz li nifilħuħ. L-enerġija nuklejari hemm marbuta magħha spejjes moħbija li rari ħafna jittieħdu in konsiderazzjoni kull meta l-materja tkun soġġett ta’ dibattitu politiku: l-iskart nuklejari ġġenerat kif ukoll ir-riskji inerenti, marbuta ma’ ħsara jew funzjonament ħażin  tal-impjanti nuklejari.  L-impatt tal-inċidenti nuklejari fi Three Mile Island (Pennsylvania Stati Uniti – 28 ta’ Marzu 1979), Chernobyl (Ukrajina – 26 t’April 1986) u Fukushima (Ġappun – 11 ta’ Marzu 2011) huma xhieda biżżejjed tal-konsegwenzi li jista’ jkollna niffaċċjaw meta tkun ikkunsidrata l-għażla ta’ enerġija nuklejari.

Il-mod kif niddisponu mill-iskart nuklejari hu suġġett għal dibattitu kontinwu fuq livell globali. L-ispiża biex dan isir hi waħda sostanzjali, u dan b’referenza kemm għall-ispiża ambjentali kif ukoll għal dik finanzjarja.  Fil-passat riċenti, viċin tagħna, l- eko-mafja irmiet kull xorta ta’ skart, inkluż skart nuklejari, fil-Baħar Mediterranean. Dan għamlitu fi 42 vapur differenti, kollha mgħarrqa f’partijiet differenti tal-Mediterran. Il-kaz speċifiku tal-vapur Kunsky mgħarraq ftit il-barra mill-kosta tal-Kalabrija, kien ġie żvelat mill-pentiti tal- ‘Ndrangheta/Camorra, Francesco Fonti u Carmine Schiavone, snin ilu fix-xhieda tagħhom lill-awtoritajiet Taljani.

Bosta mir-riskji tekniċi tal-impjanti nuklejari illum il-ġurnata kważi nstab tarf tagħhom u dan minħabba l-avvanżi kontinwi fit-teknoloġija. Hemm iżda eċċezzjoni waħda! Kif ġie żvelat bħala riżultat tad-diżastru ta’ Fukushima, il-forzi naturali jibqgħu kontinwament bit-tmun f’idejhom!  F’Fukushima, għal darba oħra ġie ikkonfermat li r-riskji marbuta mat-terrimoti mhux la kemm insibu tarf tagħhom! Dan kollu  għandu relevanza kbira għad-dibattitu dwar il-kostruzzjoni ta’ impjanti nuklejari wara biebna, f’teritorju Taljan.

Fl-2011 l-awtoritajiet Taljani kienu indikaw li s-sit fi Sqallija li probabbilment jintuża biex fuqu jinbena impjant nuklejari qiegħed mal-kosta tan-nofsinnhar ħdejn il-lokalità ta’ Palma di Montechiaro. Dan ikun madwar 100 kilometru fil-Majjistral ta’ Għawdex.

Kif nafu, Sqallija hi zona fejn it-terrimoti huma frekwenti. Apparti t-terrimoti frekwenti “żgħar” li  nisimgħu dwarhom u li xi kultant nindunaw bihom matul is-sena, fi Sqallija seħħew tnejn mill-agħar terrimoti li qatt laqgħtu lill-Ewropa. Fl-1693 terrimot fix-Xlokk ta’ Sqallija kellu qawwa ta’ 7.4 filwaqt li f’Messina fl-1908 terrimot ieħor laħaq qawwa ta’ 7.1 fuq l-iskala Mercalli. Dawn iż-żewġ terrimoti ħolqu ħerba u wasslu għat-telfien ta’ bosta ħajjiet. L-infrastruttura ukoll sofriet danni kbar!

Id-deċiżjoni dwar jekk il-Gvern Taljan jerġax jipprova jmur lejn in-nuklejari biex jiġġenera l-elettriku fl-Italja mhux ser tittieħed f’data fil-qrib. Imma, meta jibdew jinġabru l-firem għal referendum fuq is-suġġett ma tantx ikun baqa’ żmien biex għal darba’oħra nqiesu sewwa x’nistgħu nagħmlu.

F’Malta, l-interess tagħna hu dwar l-impatt  fuqna ta’ impjant nuklejari mal-kosta ta’ Sqallija viċin ta’ Palma di Montechiaro f’kaz li dan l-impjant jiżviluppa l-ħsara jew għal xi raġuni jibda jaħdem b’mod erratiku.  

Tajjeb li nżommu f’moħħna li minħabba l-emissjonijiet radjuattivi riżultat tad-diżastru ta’ Fukushima kellha sseħħ evakwazzjoni sħiħa f’distanza ta’ 200 kilometru mill-impjant nuklejari. Għawdex, kif tafu, hu inqas minn 100 kilometru mill-kosta ta’ Sqallija. Daqshekk huma ċari l-konsegwenzi għalina ta’ impjant nuklejari mal-kosta ta’ Sqallija!

ippubblikat fuq Illum: 15 ta’ Jannar 2023

A nuclear reactor in Sicily?

During the recent 2022 electoral campaign, the issue of nuclear energy in neighbouring Italy has resurfaced in the political debate.

Matteo Salvini, currently Minister for the Infrastructure and Transport, in addition to being Deputy Prime Minister of the ruling Italian coalition government, is on record as emphasising that, given the current energy crisis, he considers that it would be expedient to resurrect the nuclear proposal.

Italian voters have expressed themselves clearly on the matter twice. The last time was in a referendum in June 2011 in the aftermath of the Fukushima March 2011 nuclear disaster. Then, 94 per cent of those voting, opted in favour of a total ban on the construction of nuclear reactors on Italian soil.

The current energy crisis is pressuring all to find alternative energy supplies at affordable cost. Nuclear energy, however, comes with two hidden costs which are rarely ever factored into the costings presented for public debate: the disposal of nuclear waste and the inherent risks linked to the failure of the nuclear plants. The impacts of the nuclear accidents at Three Mile Island (Pennsylvania USA – 28 March 1979), Chernobyl (Ukraine – 26 April 1986) and Fukushima (Japan – 11 March 2011) are clear enough testimony of what is at stake, when considering the option of nuclear energy.

The disposal of nuclear waste is the subject of an ongoing debate all over the world. It is costly both environmentally as well as financially. In the recent past, closer to home, the eco-mafia dumped various types of waste including nuclear waste in the Mediterranean Sea in 42 different ships sunk in different parts of the Mediterranean. The specific case of the sunken ship Kunsky off the Calabrian coast was revealed by ‘Ndrangheta/Camorra turncoats Francesco Fonti and Carmine Schiavone many years ago in their testimony to the Italian authorities.

Most of the technical risks of nuclear plants have become more manageable with the technical developments over the years. There is however one exception! As revealed by the Fukushima disaster, natural forces are not always predictable. In Fukushima the risks resulting from earthquakes in the end proved once more to be unmanageable. This is of extreme relevance to the debate on the possible eventual siting of nuclear reactors on the Italian mainland.

The site which in 2011 was indicated by the Italian authorities as the most probable candidate to host a nuclear reactor in Sicily was along the southern coastline in the vicinity of Palma de Montechiaro. That would be less than 100 kilometres to the North West of Gozo.

As we are aware Sicily is an earthquake prone zone. In addition to the multitude of small earthquakes we hear about and occasionally are aware of throughout the year, the Sicilian mainland was exposed to the two most intensive earthquakes ever to hit the European mainland. The 1693 earthquake centred in South East Sicily had a magnitude of 7.4 while the Messina 1908 earthquake had a magnitude of 7.1 on the Mercalli scale. Both created havoc and had a high cost in human life! In addition, the physical infrastructure was in shambles.

A decision on whether the Italian government will once more attempt to consider the generation of nuclear energy on Italian soil is not due anytime soon. However, once the collection of signatures for a referendum on the matter gathers steam it will only be a question of time when we will have to consider facing the music one more time.

Our interest in Malta is in the transboundary impacts generated from a nuclear reactor sited along the southern Sicilian coast close to Palma di Montechiaro, should the proposed nuclear reactor malfunction.

It would be pertinent to keep in mind that the radioactivity emitted as a result of the Fukushima disaster led to a complete evacuation within a 200 km radius of the nuclear plant. Gozo being less than 100 km away from the Sicilian mainland should trigger the alarm bells of one and all as to what is ultimately at stake.

published in The Malta Independent on Sunday: 15 January 2023

Chernobyl revisited

Chernobyl in Ukraine on 26 April 1986, 36 years ago, was the site of a major nuclear disaster. All that came to mind once more when the Russian and Byelorussian forces invaded Ukrainian territory over two months ago.

The invading forces took over the Chernobyl nuclear power station site. Troops were observed excavating trenches around the site where the nuclear accident happened 36 years ago. It was only this week that the International Atomic Energy Agency (IAEA) reported that the radiation levels at Chernobyl, after being tested, have been certified as being within safe limits; but it is definitely not safe for a picnic!

The nuclear clean-up at Chernobyl is ongoing. Starting immediately in 1986, it is scheduled to last at least until the year 2065. Possibly much beyond that!

36 years on, Chernobyl is still of concern not just to those living in its vicinity, but to all of Europe.

The Chernobyl nuclear disaster had brought many to their senses as to the dangers of nuclear energy, notwithstanding the sophisticated technology utilised in the industry. This was further reinforced by the Fukushima disaster, much closer in time on 11 March 2011. In the aftermath of Fukushima various countries opted for a phase-out of their dependence on nuclear energy. Germany led the way, our Italian neighbours to the North opting for a nuclear free future through a referendum in June 2011.

All this had a particular significance for Malta as it meant that plans for the construction of a nuclear power station at Palma di Montechiaro along the southern Sicilian coast, less than 100 kilometres to the North of Gozo, were mothballed. Southern Sicily as we know is an earthquake prone zone.

Occasionally there are rumblings of a renewed interest in the use of nuclear energy. The French government has for years been acting as a nuclear salesman all around the Mediterranean. It is known that agreements to set-up and operate various nuclear plants exist relative to various North African countries. Nicholas Sarkozy had even arrived at an agreement with Gaddafi just weeks before he was ousted.

Within the EU the debate is ongoing, at times spearheaded by the fact that the generation of nuclear energy emits relatively little carbon dioxide per kilowatt hour of electricity generated. Nuclear energy does however cause significant environmental negative impacts through the waste streams which it generates, namely spent nuclear fuel, rock waste at uranium mines and mills and the release of large amounts of uncontrolled radioactive emissions whenever accidents occur. The Chernobyl, Fukushima and the Three-Mile Island nuclear accidents are irrefutable testimony that the environmental damage resulting from nuclear accidents is not just enormous but also at times difficult to control.

The IAEA reports that as of 2022 there are 493 nuclear power reactors in operation in 32 different countries.  We tend to be aware of the major nuclear accidents at Chernobyl (1986) or Fukushima (2011), and possibly that at Three-Mile Island in the US (1979). Countless other “minor” accidents have however occurred over the years. In some cases, the accidents were under control just in time, avoiding their development into a major accident.

Our neighbours rejected nuclear energy twice in two different referenda, one in 1987 after Chernobyl, the other in 2011 after Fukushima. In 2011 the Italian government was planning to construct 10 nuclear reactors. These plans were only thwarted as a result of the 2011 referendum.

It is a responsibility of the Maltese government to be on the alert as these plans could be reactivated in the near future.  This would be a danger developing on our doorstep.

published on the Malta Independent on Sunday : 1st May 2022

Malta: b’politika diżonesta dwar il-klima

Stimi dwar kemm jista’ jogħla l-livell tal-baħar, b’mod globali kif ukoll fl-Ewropa, ivarjaw skond kif wieħed iqis ir-rata tad-dewbien tas-silġ akkumulat fil-poli kif ukoll fi Greenland. Il-mod kif nilqgħu għall-emissjonijiet tal-karbonju ukoll għandu impatt fuq dawn l-istimi. Dawn l-istimi fil-fatt ivarjaw minn żieda ta’ 34 ċentimetru sa żieda ta’ 172 ċentimetru sa tmiem dan is-seklu. Imma jekk l-emissjonijiet tal-karbonju jkunu indirizzati b’politika iffukata u effettiva, din iż-żieda tista’ tkun waħda iżgħar.

Minkejja dan, ħadd ma qiegħed f’posizzjoni li jantiċpa jekk din iż-żieda fil-livell tal-baħar tkunx waħda gradwali inkella jekk din isseħħx f’daqqa. Hemm iżda l-biża’ li l-gravità tas-sitwazzjoni tista’ taċċellera avolja il-jekk u l-meta ħadd ma jaf. Din hi xi ħaga ġdida għal kulħadd!

Kull żieda fil-livell tal-baħar, kemm jekk isseħħ b’mod gradwali kif ukoll jekk isseħħ f’daqqa, ikollha impatt fuq il-kosta u b’mod partikolari fuq l-infrastruttura żviluppata tul iż-żmien. Din l-infrastruttura hi primarjament waħda turistika imma tinkludi ukoll żvilupp residenzjali li xi drabi jasal sax-xifer, sal-baħar: kemm bl-approvazzjoni tal-awtoritajiet u anke xi minndaqqiet mingħajrha!

Il-ħsara potenzjali għall-infrastruttura kostali hi kwistjoni li għandha tħassibna. Din diġà sofriet ħsarat diversi minħabba il-maltemp qalil li żied fil-frekwenza u l-intensità tul dawn l-aħħar snin. L-impatt ta’ żieda fil-livell tal-baħar bla dubju ser joħloq tibdil kbir tul il-kosta kollha tal-gżejjer Maltin. L-istorja tgħallimna. Nhar it-Tnejn 28 ta’ Diċembru 1908 fil-5.20 ta’ fil-għodu Messina fi Sqallija ġarrbet wieħed mill-iktar terrimoti qliel li qatt kien hawn fl-Ewropa, b’qawwa mkejla ta’ 7.5 fuq l-iskala Richter. Immedjatament, inħoloq tsunami b’mewġ għoli sa 9 metri. Madwar sagħtejn wara, fit-7.45 ta’ fil-għodu dan it-tsunami, ftit immansat, wasal fil-gżejjer Maltin.

Diversi gazzetti Maltin ta’ dak iż-żmien irrappurtaw li l-lokalitajiet mal-kosta viċin il-livell tal-baħar kienu mgħarrqa fl-ilma mit-7.45 ta’ fil-għodu għax b’effett taz-tsunami l-baħar tela’ l-art. Dan baqa’ sal-4.00 ta’ waranofsinnhar meta l-baħar reġa’ ikkalma u rritorna lejn il-livelli normali tiegħu! Herbert Ganado, f’l-ewwel volum ta’ Rajt Malta Tinbidel jgħid li residenzi u ħwienet tul il-kosta ta’ tas-Sliema, l-iMsida u tal-Pietà kienu mgħarrqa f’tebqa’ t’għajn għax daħlilhom kwantità ta’ ilma fis-sular terran. Bħala medja l-baħar għola madwar erba’ piedi : 1.20 metri. Fil-Port il-Kbir, imma, ma ġara xejn għax kien imħares mill-breakwater, li l-bini tiegħu kien ġie ffinalizzat madwar sentejn qabel, fis-sena 1906.

Żieda fil-livell tal-baħar bħala riżultat tat-tibdil fil-klima tkun tfisser repetizzjoni tal-impatti taz-tsunami tal-1908 mifruxa iktar u fuq bażi permanenti. Il-lokalitajiet Maltin tul il-kosta li qegħdin viċin tal-livell tal-baħar jispiċċaw b’mod permanenti fl-ilma baħar. Dan ikun jinkludi r-ramliet kollha u żoni kummerċjali u residenzjali fl-Għadira, ix-Xemxija, is-Salini, l-Gzira, l-iMsida, tas-Sliema, Ta’ Xbiex, Tal-Pietà, il-Marsa, Marsaxlokk, Marsaskala, Birzebbuġa, ix-Xlendi, u Marsalforn. L-impatti jistgħu jinħassu iktar il-ġewwa mill-kosta ukoll, f’lokalitajiet li huma f’livell tal-baħar bħal Ħal-Qormi u allura jeffettwa l-inħawi kollha mix-xatt tal-Marsa sa Ħal-Qormi b’dik li hi magħrufa bħala l-Marsa tal-Inġliżi b’kollox. Dan jeffettwa ukoll l-investiment fl-infrastruttura sportiva.

Li jogħla l-livell tal-baħar issa hu inevitabbli. Imma b’ħidma bil-għaqal għad hemm ċans li nnaqqsu kemm dan jogħla. Dan jista’ jseħħ kemm-il darba nieħdu passi biex innaqqsu l-emmissjonijiet tal-karbonju u allura inkunu qed nagħtu kontribut biex iż-żieda fit-temperatura globali tkun l-inqas possibli.

Fis-summit ta’ Pariġi, Malta, flimkien mal-bqija tal-pajjiżi, wegħdet li tieħu azzjoni konkreta biex ikun possibli li jonqsu l-impatti fuq il-klima. Però anke jekk il-wegħdiet kollha li saru f’Pariġi jkunu onorati, hu ċar li għadna l-bogħod ħafna milli nilħqu l-mira miftehma li ma naqbżux iż-żieda ta’ żewġ gradi Celsius fit-temperatura. Hu meħtieġ ħafna iktar mingħand kulħadd. Hemm bżonn mhux biss iktar azzjoni konkreta imma ukoll politika koerenti u konsistenti.

Il-politika ta’ Malta dwar il-klima, imma, hi waħda diżonesta. Nuru wiċċ b’ieħor kontinwament. Min-naħa l-waħda l-Gvern Malti jwiegħed li jaġixxi biex ikun possibli li nindirizzaw il-klima. Imma fl-istess ħin jibqa’ għaddej bi proġetti infrastrutturali li jinkoraġixxu iktar karozzi fit-toroq u allura iktar emissjonijiet. L-emissjonijiet tal-karozzi jikkompetu ma dawk li joriġinaw mill-ġenerazzjoni tal-elettriku.

Hemm bżonn li ndaħħlu ftit sens u konsistenza fil-politika ta’ Malta dwar il-klima. Għax sakemm nibqgħu inkonsitenti kullma qed nagħmlu hu li qed ngħinu biex ikompli jitħaffar il-qabar tagħna.

 

ippubblikat fuq Illum : il-Ħadd 24 ta’ Mejju 2020

Malta: a double-faced climate change policy

Estimates for sea-level rise, both globally as well as in Europe, vary depending on the assumptions made as to the rate at which ice at the polar caps and Greenland is melting.

The carbon emission-mitigation policy scenario also has a direct bearing on these estimates. These estimates range between a 34- and 172-centimetres potential sea-level rise by the end of the current century. Lower emissions together with a focused mitigation policy may restrict sea-level rise towards the lower end of the range.

However, notwithstanding, no one is in a position to predict as to whether such a sea-level rise will be gradual or sudden. It is however feared that once a tipping point is reached changes may occur at a much faster pace than anticipated. We all are on a learning curve on this!

Any sea-level rise, gradual or sudden, will have an impact on our coastline and in particular on the infrastructure developed over the years along the coast. This infrastructure is primarily of a touristic nature but it also includes residential development at times built along the water’s edge with or without the acquiescence of the planning authorities.

There is nothing to worry about if the sea-level rise wipes out abusive development. When one considers the potential impact on coastal infrastructure that is, however, a different kettle of fish.

The coastal infrastructure is already battered by the ever-frequent storms. The impact of a sea-level rise will without any doubt redraw the coastal map of the Maltese islands.

Let us have a look at our history books. At 5.20am of Monday 28 December 1908, Messina in neighbouring Sicily experienced one of the most powerful earthquakes to ever hit Europe, measuring 7.5 on the Richter scale. Immediately, a tsunami generating waves as high as 9 metres was unleashed. Just over two hours later, at 7.45am, the tsunami, slightly tamed, reached the Maltese Islands.

Various local newspapers of the time reported that low-lying areas were flooded from 7.45am until around 4.00pm when the sea receded back to its “normal level”. Herbert Ganado, in his Rajt Malta Tinbidel (Volume 1, page 37) states that residences and shops along the coast in Sliema, Msida, and Pietà were suddenly flooded. The average sea-level rise was 1.20 metres. The Grand Harbour was spared as it was protected by the breakwater, whose construction had been finalised a couple of years earlier.

A sea-level rise as a result of climate change would repeat the Malta impacts of the 1908 tsunami on a permanent basis. The low-lying parts of the Maltese coastline would then be permanently underwater. This would include all sandy beaches and the residential/commercial areas at l-Għadira, Xemxija, Salini, Gzira, Msida, Sliema, Ta’ Xbiex, Pietà, Marsa, Marsaxlokk, Marsaskala, Birzebbuga, Xlendi, and Marsalforn. Impacts could also move towards the inland low-lying areas such as Qormi.

Sea-level rise is inevitable. It is only its extent which can be reduced. This can happen if we take appropriate action which reduces carbon emissions and hence contributes to nudging the temperature increase towards the least possible.

At the Paris Climate Summit, together with all other countries, Malta made pledges to take action to lay the foundations for reducing climate impacts. If all the pledges made at Paris are honoured, however, we will still be very far off from achieving the target of not exceeding a two-degree Celsius temperature rise. Much more is required.

Malta’s climate related policies are double faced. On one hand the Malta government pledges action to address climate change. Simultaneously it proceeds with road infrastructural projects which encourage cars on our roads. Car emissions compete with power generation emissions as Malta’s major contributor to climate change. Is it not about time that we bring our own house in order? We are digging our own grave with a double-faced climate policy.

published on The Malta Independent on Sunday : 24 May 2020

After Wednesday’s earthquake: civil defence

 

 

On Wednesday an earthquake of 4.4 magnitude on the Richter scale was reported in the Maltese islands. As far as we are aware no damage was caused, yet it would be appropriate to consider a number of relevant issues.

Are we prepared for the consequences of a much stronger earthquake which would cause considerable damage including the potential death of a substantial number of persons?

Around two years ago, the Civil Protection Department (CPD) in conjunction with the Sicilian counterparts carried out an earthquake simulation exercise in Gozo which, undoubtedly, provided CPD personnel with valuable experience. It is not known if the department has been involved in any subsequent exercises, either locally or abroad, nor is it known if any specific operational changes were implemented by the CPD as a result of the lessons learned in the 2015 exercise.

It is, however, pertinent to point out that it is not only the CPD, the Police, the AFM and the Health Authorities that need adequate and continuous training to cope with the aftermath of a strong earthquake in the Maltese Islands. In addition to the operators of the different sectors of the infrastructure (energy, water, transport) the civilian population should also receive training for this unlikely eventuality.

Simulation exercises involving the civilian population are necessary as they would develop at local level an ability to manage a disaster. We need to start from scratch in building up a civil defence corps worthy of the name, coordinated and trained by the CPD but based in each locality in Malta and Gozo.

It is a responsibility which, together with adequate resources, should be assigned to local councils under the watchful eye of the CPD.

This would be the appropriate way to build up an adequate general level of preparedness for disaster management. The involvement of the local councils would also ensure that the needs of the most vulnerable members of our communities are addressed. Specific protocols need to be developed and tested in conjunction with local councils regarding the assistance required by children and those who are bedridden or disabled. Catering for all disabilities is an indispensible prerequisite and this requires trained personnel to which the CPD currently has little if any access. It is an easily identifiable deficiency that needs to be addressed forthwith.

Those in charge of disaster management in time of need require the ability to communicate with people having impaired hearing. Is anyone at the CPD, the Police, the AFM or the Health Authorities able to communicate in sign language? Addressing this communication deficiency on the part of the authorities is required not just to ensure that Malta is adequately prepared for disaster management, it is also an everyday deficiency that every authority in Malta that offers a direct service to the population at large needs to address. With around 500 known Maltese with impaired hearing and a number of others who could have remained below the radar, this is an issue that is manageable primarily at local level.

The CPD is one of the youngest departments and to date it has given sterling service in fire-fighting, managing pollution and providing assistance required as a result of flooding after heavy storms. We look forward to the next step in its development: ensuring that training in disaster management is an integral part of the services of local authorities.

published in The Malta Independent on Sunday – 27 August 2017

Next Thursday’s earthquake

earthquake

 

This will be a simulation exercise coordinated by Malta’s Civil Protection Department at 4pm next Thursday in Gozo and three hundred people will be involved.

It will be carried out with EU assistance and in conjunction with the Civil Protection Authorities in Sicily who are partners with the Maltese Civil Protection Department (CPD) in establishing a network within the region that is able to manage seismological disasters.

This exercise signals the coming of age of Malta’s CPD. It has to date delivered sterling service in the areas of fire-fighting, managing pollution and providing assistance required as a result of flooding after heavy storms. Training its staff, and subjecting them to a gruelling simulation exercise, is a gigantic step forward for the CPD. It is the first step of a long journey that is dependent on the dedication of the CPD staff  – which is unlimited – as well as the resources allocated by the state. Such resources, although limited over the years, seem to be slowly trickling down, for a change.

Developing the CPD’s ability to handle disasters will be a major challenge. For a start it will identify its capability to develop effective coordination with the Police Force, with the AFM (Armed Forces) and the health authorities as well as with local councils.

At the end of the day the CPD’s proficiency in disaster management will be measured in terms of its response time as well as the number of lives it saves in such situations. This will generally depend on the severity of the disaster with which it is faced.

This will not only translate into a general level of preparedness. It will also require focusing on the needs of the most vulnerable in our communities and in this respect the role of local councils is indispensable. Specific protocols need to be developed and tested in conjunction with local councils regarding the assistance required by children and those who are bedridded or disabled. Catering for all disabilities is an indispensible prerequisite and it requires trained personnel to which the CPD currently has no access. It is an easily identifiable deficiency which needs to be addressed forthwith.

One small example would suffice: how would the CPD personnel, the police, the AFM – or the health authorities for that matter – communicate with persons with  impaired hearing in the absence of staff able to communicate in sign language? Addressing this deficiency is required not just to ensure that Malta is adequately prepared for disaster management. It is also an everyday deficiency that every authority in Malta that offers a direct service to the population at large needs to address. With around five hundred known Maltese with impaired hearing and a number of others who may have remained below the radar, this is an issue which is manageable primarily at a local level. Yet to date it has not been adequately prioritised.

In this context, one would also need to query the level of preparedness of institutions such as Mount Carmel Hospital and id-Dar tal-Providenza. I am informed that even when it comes to fire drills in residential homes for the elderly, the results were not impressive, to put it mildly.

Prompt and effective coordination between the different authorities is crucial in ensuring disaster management. There is a need to test how the different types of equipment used by the CPD, the Police and the AFM interact. Are they compatible? The planned simulation exercise is an opportunity to identify whether, in an actual practice run, matters will work out as planned. Lessons learned in this area will have to be translated into better procurement procedures in the future to ensure smooth interaction between the CPD, the police and the Army.

This will translate into compatible communication equipment as well as adequately maintained vehicles, sea craft and aeroplanes/helicopters which can be used in difficult circumstances. Knowing that maintenance of equipment has never been our forte, this could be quite a challenge!

The simulation exercise on Gozo on 3 September will necessarily lead to a number of lessons learnt which will have to be acted upon in order that Malta’s capability in disaster management is enhanced. This is definitely a bold step in the right direction.

I look forward to the next steps which require the involvement of local authorities.

Published in The Malta Independent on Sunday – 30 August 2015

Terrimot għall-ġimgħa d-dieħla

cpd_logo

 

Id-Dipartiment tal-Protezzjoni Ċivili qed jippjana terrimot għall-ġimgħa d-dieħla nhar il-Ħamis 3 ta’ Settembru. Dan ser isir bħala eserċizzju ta’ taħriġ u ser jinvolvi madwar 300 ruħ. It-taħriġ ser isir ġo Għawdex.

Ser jipparteċipaw ukoll madwar sittin persuna teknika mid-Dpartiment tal-Protezzjoni Ċivili ta’ Sqallija.

Din hi aħbar tajba ħafna. Tfisser li bħala pajjiż bdejna inħarsu l-quddiem bis-serjetà f’dan il-qasam. Sal-lum id-Dipartiment tal-Protezzjoni Ċivili kien assoċjat mat-tifi tan-nar, ma’ inċidenti gravi tat-traffiku u ma problem ta’ għargħar. Issa ser isir pass kbir il-quddiem.

Hu tajjeb li nibdew nippjanaw dwar kif id-Dipartiment tal-Protezzjoni Ċivili jaħdem f’każ ta’ diżastru nazzjonali bħal terrimot jew għargħar, per eżempju.

Il-kordinazzjoni hi meħtieġa biex l-awtoritajiet differenti jissinkorizzaw il-ħidma ta’ bejniethom. Hu importanti ħafna li d-Dipartiment tal-Protezzjoni Ċivili, l-Armata, l-Pulizija u l-awtoritajiet tas-Saħħa f’każ ta’ emerġenza ma jkollhomx diffikultà biex jaħdmu. Għalhekk importanti t-taħriġ.

Imma hemm bżonn ukoll li jkunu involuti l-Kunsilli Lokali għax f’każ ta’ emerġenza huma l-Kunsilli Lokali l-ewwel u l-iktar kuntatt effettiv man-nies.

Ma nistax għalhekk ma ngħidx prosit mistħoqq lid-Dipartiment tal-Protezzjoni Ċivili li wasal sa hawn.

Imma dan hu biss il-bidu. Għax hemm ħafna iktar x’isir.

Terrimoti, tsunami, u l-protezzjoni ċivili f’Malta

times.tsunami.010914

Il-bieraħ il-gazzetti online kellhom storja komuni. F’riċerka li saret bejn akkademiċi mill-Universita’ ta’ Portsmouth flimkien ma akkademiċi md-Dipartiment tal-Ġografija tal-Universita’ ta’ Malta ikkonkludew li fil-passat imbiegħed Malta kienet soġġetta għall-effett ta’ tsunami, riżultat ta’ terrimoti li seħħew madwarna.

Mewġ ta’ mhux inqas minn 4 metri għoli jidher li ħalla effett f’żoni sa 20 metru il-fuq mil-livell tal-baħar. Mewġ b’veloċita’ ikbar minn 30 kilometru fis-siegħa ikaxkar kull ma jsib quddiemu.

Jidher li r-riċerka indikat il-kosta li tħares lejn il-grigal (North-East) bħala li l-iktar li kienet effettwata: mill-Aħrax tal-Mellieħa sa Marsakala u possibilment Marsaxlokk u Birżebbuga ukoll. Għawdex hemm Marsalforn,

Issa l-kosta ta’ Malta b’faċċata tħares lejn il-grigal hi l-iktar populata, bil-bini jasal kważi sal-baħar. Hi ukoll iż-żona li fiħa l-parti l-kbira tal-infrastruttura turistika kif ukoll il-power station ta’ Delimara.

Li Malta hi esposta għal dan il-periklu naturali mhux xi ħaġa li nafuha illum. Imma li illum hemm dan l-istudju konkluż forsi jkun hemm ftit min jiftaħ għajnejh dwar il-ħtieġa li nifhmu illi d-Dipartiment għall-Protezzjoni Ċivili jeħtieġ iktar riżorsi u nies imħarrġa biex il-pajjiż ikunu ippreparat għal dan il-periklu naturali. Periklu li jista’ jkun fuqna fil-qrib, u jista’ jkun fuqna fil-bogħod. M’hu magħruf minn ħadd il-meta. Imma jiġi meta jiġi, bħala pajjiż s’issa m’aħniex ippreparati.

 

Ara ukoll fuq dan il-blog

29 t’April 2013: Malta u l-iżbroff tal-vulkan Marsilii.

Malta u l-iżbroff tal-vulkan Marsili

Marsili Area of impact

M’hiex xi storja ġdida li l-vulkan Marsili jista’ jiżbroffa minn ħin għall-ieħor. Hi storja li kien hawn ħafna diskussjoni dwarha madwar tlett snin ilu.

Il-vulkan Marsili hu vulkan rieqed li qiegħed sitwat taħt il-baħar Tirren. Minn studji li saru ma jidhirx li qatt żbroffa fl-istorja riċenti. Fil-gazzetti ta’ tlett snin ilu jingħad li qatt ma kien hemm żbroff ta’ dan il-vulkan “since the start of recorded history”.

Qiegħed iżda jingħad li billi l-ħitan tiegħu huma dgħajfa, jista’ jiżbroffa minn ħin għall-ieħor. Iżda meta dan ser iseħħ, jekk iseħħ,  ħadd ma jaf. Il-konsegwenzi iżda jafu jkunu diżastrużi. Kif jidher fil-mappa ta’ hawn fuq l-impatt ewlieni jkun fuq in-naħa t’isfel ta’ l-Italja u fuq it-tramuntana ta’ Sqallija. Minħabba li Sqallija isservi ta’ tarka jidher li ftit li xejn ikun hemm impatt fuq il-gżejjer Maltin.

Fl-inħawi li jistgħu jkunu milquta kemm fi Sqallija kif ukoll fl-Italja, ser isiru eżerċizzji ta’ taħriġ mill-awtoritajiet fil-pajjiż inkarigati mill-protezzjoni ċivili dwar kif l-awtoritajiet għandhom jilqgħu għall-emerġenza li tista’ tinħoloq.

L-impatt ikun bħala riżultat tal-maremot (tal-qawwa ta’ 7.5 fuq l-iskala Richter) li l-iżbroff tal-vulkan jiġġenera. Hu ikkalkulat li dan l-iżbroff jista’ jiġġenera tsunami b’mewg għoli għaxar metri li jista’ jagħmel ħerba fiż-żoni indikati fil-mappa ta’ hawn fuq.

U f’Malta?  Jidher li ftit li xejn ser ikun hemm impatt kif anke’ qalet is-seżmologa Maltija Dr Pauline Galea f’kummenti li kienet tat lit-Times f’Malta tlett snin ilu.

Imma jkun għaqli li fil-waqt li nosservaw li l-iżbroff ta’ dan il-vulkan, jekk iseħħ, ftit li xejn jista’ jkollu impatt fuq Malta, nagħmlu sewwa jekk neżaminaw ftit fil-fond il-ħidma tad-Dipartiment tal-Protezzjoni Ċivili u naraw ftit jekk aħniex ippreparati f’kaz li nintlaqtu minn xi diżastru simili.

Wisq naħseb li m’aħniex ippreparati.

Tajjeb li nistaqsu ftit mistoqsijiet.  Għal-lum waħda tkun biżżejjed.

Fl-1 ta’ Diċembru 1999 il-Parlament Malti approva liġi li permezz tagħha waqqaf id-Dipartiment tal-Protezzjoni Ċivili. Skond din il-liġi il-Prim Ministru kellu jaħtar Kunsill dwar il-Protezzjoni Ċivili li fost ir-responsabbiltajiet tiegħu għandu l-obbligu li jara li l-pajjiż ikun imħejji għall-“emergenzi u diżastri pubbliċi”.

Fejn wasalna?